Skip to main content February 2016 Investor Presentation – Far Limited | Shale Experts
Loading...

February 2016 Investor Presentation – Far Limited

Far Limited · Feb 8, 2016 · 25 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. February 2016 Investor Presentation – Far Limited – slide 1
    FAR Investor Presentation February 2016
  2. February 2016 Investor Presentation – Far Limited – slide 2
    FAR snapshot Africa focused: Primarily Senegal and Guinea Bissau 6th Largest pure E&P on ASX: ASX 300 company FAN-1 and SNE-1: Major basin opening oil discoveries in Senegal SNE Field largest oil discovery for 2014: IHS CERA SNE…
  3. February 2016 Investor Presentation – Far Limited – slide 3
    FAR market summary Member of ASX 300 energy index Capital Structure since March 2015 ASX Ticker FAR Share price (29 Jan 2016) A0.074 FARJOY (Family Office) is the largest Market cap (29 Jan 2016) A273M single shareholder with 11% Cash…
  4. February 2016 Investor Presentation – Far Limited – slide 4
    Senegal Strong in-country relationships: FAR has been in Senegal since 2006 OFFSHORE SENEGAL PSC 16.7% paying interest, 15% beneficial interest Operator: Cairn Energy PLC Peaceful democracy: been a democracy for 200 years Solid…
  5. February 2016 Investor Presentation – Far Limited – slide 5
    FAN-1 and SNE-1 seismic section/schematic W E SNE-1 FAN-1 SNE-2 SNE-3 BEL-1 Buried Hill Shelf Edge Fan 5
  6. February 2016 Investor Presentation – Far Limited – slide 6
    FAN-1 oil discovery Proved prolific source Oil gravity 28-41 degrees API Gross oil bearing interval 500m containing discrete oil columns with no oil-water contact (29m net) Operator gross oil (STOIIP) in place* P90: 250 mmbbls…
  7. February 2016 Investor Presentation – Far Limited – slide 7
    SNE-1 oil discovery Excellent reservoir average 25% porosity Oil gravity 32 degrees API Gross oil column of 96m (36m net) Contingent recoverable resource* Low estimate (1C): 240 mmbbls Best estimate (2C): 468 mmbbls High estimate…
  8. February 2016 Investor Presentation – Far Limited – slide 8
    SNE Field appraisal program 3 well back to back drilling program Commenced Nov 2015 First well completed (SNE-2) Currently preparing for DST of SNE-3 Prove MEFS of 200mmbbls Test reservoir deliverability from logging, coring…
  9. February 2016 Investor Presentation – Far Limited – slide 9
    SNE Field appraisal well locations N BEL-1 SNE-2 SNE-1 SNE-3 S Bellatrix Thin sands Gas cap Oil column Blocky sands 9
  10. February 2016 Investor Presentation – Far Limited – slide 10
    SNE-2 result* Gross oil column 103m 216m core collected through reservoir SNE-2 has confirmed commercial flow rates from two drill stem tests 8,000 bopd from thick sands 1,000 bopd from thin sands Further resource revision…
  11. February 2016 Investor Presentation – Far Limited – slide 11
    Senegal prospects and leads Estimated 1.5 billion bbls undrilled prospective resources* Undrilled Buried Hills play to be drilled with Bellatrix well (BEL-1) *Reference FAR ASX releases dated 13 Apr 2015 best estimate, gross,…
  12. February 2016 Investor Presentation – Far Limited – slide 12
    Bellatrix exploration prospect Buried Hills exploration Bellatrix unrisked prospective resources* prospect overlies northern flank of SNE Low estimate 69 mmbbls Strong amplitude response, Best estimate 168 mmbbls conforms to…
  13. February 2016 Investor Presentation – Far Limited – slide 13
    Expansion of 3D seismic coverage 2015 3D seismic undertaken by Senegal JV FAR Djiffere 3D seismic FAR has the option to earn a 75% working interest in Djifferre block Processing of data from both surveys now taking…
  14. February 2016 Investor Presentation – Far Limited – slide 14
    Development of SNE Field and tie back potential 77mmbbl* 74mmbbl* 204mmbbl* 141mmbbl* 168mmbbl* 101mmbbl* *Reference FAR ASX releases dated 13 Apr 2015 best estimate, gross, unrisked prospective resources, 100% basis,…
  15. February 2016 Investor Presentation – Far Limited – slide 15
    Senegal economic models 18 Very good PSC terms 16 NPV/bbl (US) 14 Base planning case: 12 NPV/bbl at FID Assumes 330mmbbls 10 8 (50mmbbls net to FAR) 6 4 CAPEX 17-26/bbl 2 OPEX 5-15/bbl 0 US90/bbl 2014 costs US70/bbl 10%…
  16. February 2016 Investor Presentation – Far Limited – slide 16
    Why FAR Fully funded three well Senegal appraisal program underway Ahead of drilling schedule likely to drill fourth well in 3 well budget SNE-2 confirmed commercial flow rates Threshold economic field size (200 mmbbls gross)…
  17. February 2016 Investor Presentation – Far Limited – slide 17
    Additional information
  18. February 2016 Investor Presentation – Far Limited – slide 18
    Board with significant experience Nicholas Limb Geophysicist and investment banker Non-Executive Chairman 15 years as MD/Chairman of an ASX listed, international mining company, Australia. Appointed 2012 10 years in Financial services…
  19. February 2016 Investor Presentation – Far Limited – slide 19
    Activity schedule to mid 2016 2016 January February March April May June DRILLING Option Well 4 3D SEISMIC processing and preliminary interpretation Ocean Rig Athena drill ship Major offshore Senegal 3 well drilling and…
  20. February 2016 Investor Presentation – Far Limited – slide 20
    FAR performance versus ASX 200 energy index 0.12 0.10 FAR: 0.08 Share price (Ap.s.) 7.4cps 14% ASX 200 Energy: 0.06 7,511 -35% 0.04 Brent oil: US35.25 -29% 0.02 0.00 Jan-15 Feb-15 Mar-15 Apr-15 May-15…
  21. February 2016 Investor Presentation – Far Limited – slide 21
    FAR performance versus African focused peers 0.12 0.10 0.08 Share price (A per share) FAR (13.6%) Cairn Energy (20.3%) 0.06 Ophir Energy (37.0%) Brent Oil (US/bbl) (37.6%) Kosmos Energy (45.5%) 0.04 Tullow Oil…
  22. February 2016 Investor Presentation – Far Limited – slide 22
    FAR is a leading Australian E&P company Australian Mid Cap E&P Market capitalisation in Am 600 500 400 300 200 100 0 BPT KAR FAR DLS AWE SXY HZN CVN Source: ASX data as at 25 January 2016 (excludes Woodside, Oil Search…
  23. February 2016 Investor Presentation – Far Limited – slide 23
    SNE contingent resource upgrade Independent Resources Report completed by RISC for FARs SNE oil discovery, offshore Senegal* This supports a 42% increase in the gross, best estimate, recoverable SNE contingent resource to 468 MMstb…
  24. February 2016 Investor Presentation – Far Limited – slide 24
    Senior management Catherine Norman Over 20 years experience in the mineral and oil & gas exploration industry, having held executive positions both in Australia and Managing Director in the UK. Cath has carried out operating…
  25. February 2016 Investor Presentation – Far Limited – slide 25
    Contact us Level 17, 530 Collins Street Melbourne VIC 3000 Australia T: +61 3 9618 2550 www.far.com.au