1Q 2016 OPERATIONS UPDATE APRIL 27, 2016 NYSE: QEP
ASSET OVERVIEW QEP Energy 1Q 2016 QEP Resources Production Revenues 2015YE Proved Reserves ND Pinedale Anticline Williston Basin 35% 32% 59% 58% WY 10% 6% Uinta Oil plays Basin Liquidsrich plays UT Drygas play CO Oil NGL…
EXECUTING ON TRANSITION TO OIL 25 19.6 19.75 20 17.1 Oil production (MMBbl) 15 10.2 10 6.3 5 3.7 3.0 2010 2011 2012 2013 2014 2015 2016E (1) 2016E represents midpoint of guidance as of April 27, 2016 4
WILLISTON BASIN Net Production (Mboed) 60 50 40 30 Fort Berthold 20 10 South Antelope Bakken Formation wells Three Forks Formation wells Proved reserves of 181.0 MMboe (1) Operated focus area QEP acreage (1) As…
WILLISTON BASIN SOUTH ANTELOPE Net acres: 30,000 1Q 2016 Gross operated completions: 17 Gross well cost (AFE) Drill & complete: 5.3 MM 10,000ft lateral, sliding sleeve Facilities & artificial lift: 0.8 MM Q1 Completions Two 6…
WILLISTON BASIN HIGHDENSITY INFILL PILOTS Highdensity infill pilot wells continue to show strong results High proppant volume completion wells significantly outperforming original wells High proppant volume completion 50 stages, 10…
WILLISTON BASIN HIGHDENSITY INFILL PILOTS Original Completions HighDensity Infill Wells HighDensity Infill Pilots QEP acreage 8
WILLISTON BASIN THREE FORKS 2ND & 3RD BENCH Testing additional benches of the Three Forks Second Bench Producing eight wells with outstanding results Well with the longest time on production has produced 270 Mboe in its first 270…
WILLISTON BASIN THREE FORKS 2ND & 3RD BENCH 250,000 100 Original Compleions: 3035 Stgs; 34 MMlbs (60 Wells) HighProppant Completions: 4851 Stgs; 9.510 MMlbs (38 Wells) Three Forks 2nd Bench (8 Wells) Three Forks 3rd Bench (1 Well)…
WILLISTON BASIN FORT BERTHOLD Net acres: 69,700 1Q 2016 Gross operated completions: None Gross well cost (AFE) Drill & complete: 5.8 MM 10,000ft lateral, sliding sleeve Facilities & artificial lift: 1.1 MM QEP Waiting on…
PERMIAN BASIN OPERATIONAL UPDATE Completion optimization program Zipper fracs reduce completion time Pumping lower rate fracs (60 bpm vs 70 bpm) Continue to enhance completion design Six completed QEP operated wells reached peak…
PERMIAN BASIN CURRENT TARGETS Shale Carbonate Clearfork Shale Leonard Shale 4,000 feet of oilcharged vertical section 1 Mile U. Spraberry M. Spraberry L. Spraberry Jo Mill Sand Spraberry Shale Dean Wolfcamp…
GREEN RIVER BASIN PINEDALE ANTICLINE Pinedale Net Production Anticline (MMcfed) QEP Producing Well 350 300 Other operators 250 (No QEP interest) 200 150 QEP Drilling (2) 100 50 QEP acreage Net acres: 12,700 Proved…
UINTA BASIN RED WASH LOWER MESAVERDE Net Production (MMcfed) 120 100 Most recent 80 horizontal well 60 40 20 Net acres: 253,800 (1) 8well vertical pad 8well vertical pad 48,000 net acres in the Red completed Q1 16 on…
UINTA BASIN RED WASH LOWER MESAVERDE OPERATIONAL UPDATE New pad of eight directionallydrilled vertical wells targeting Lower Mesaverde completed in 1Q 2016 Wells achieved a combined peak 24hour IP rate of 29.1 MMcfed Combined gross…