Q1 2016 Conference Call – Lonestar Resources Ltd.

Lonestar Resources Ltd. · May 16, 2016 · 13 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. Q1 2016 Conference Call – Lonestar Resources Ltd. – slide 1
    Lonestar Resources, Ltd. First Quarter Conference Call May 16, 2016
  2. Q1 2016 Conference Call – Lonestar Resources Ltd. – slide 2
    1Q16 Headlines Continued Operational Excellence Production Averaged 6,553 BOEPD Eagle Ford Shale Production Up 23% vs. 1Q15 1Q16 Production by Product Temporary Curtailments Reduced Production by 355 BOEPD Burns Ranch Fire at…
  3. Q1 2016 Conference Call – Lonestar Resources Ltd. – slide 3
    Quarterly Financial Summary Quarterly Production Total Company Quarterly Production Total Company 8,000 8,000 7,000 7,000 6,000 6,000 Production (BOEPD) Production (BOEPD) 5,000 5,000 4,000 4,000 3,000 3,000 2,000…
  4. Q1 2016 Conference Call – Lonestar Resources Ltd. – slide 4
    Quarterly Production Summary Quarterly Production Total Eagle Ford Quarterly Production Western Eagle Ford 8,000 70 6,000 40 7,000 5,500 60 35 5,000 Eagle Ford Well Count Eagle Ford Well Count 6,000 Production…
  5. Q1 2016 Conference Call – Lonestar Resources Ltd. – slide 5
    1 RECYCLE RATIO FINDING & DEVELOPMENT COST (/BOE) 10 15 20 25 30 35 40 0 5 0.0x 1.0x 2.0x 3.0x 4.0x 5.0x 6.0x PDCE AR SYRG EQT AR UPL CLR PDCE AREX RRC REI COG UPL REXX LNREF RICE NOG AREX EGN GST…
  6. Q1 2016 Conference Call – Lonestar Resources Ltd. – slide 6
    The Value of Long Laterals Surface & Facilities Drilling Pad Wellhead Equipment Separation Storage 0.5 MM Compression Gathering 0.5 MM Vertical + Angle Lateral Length 5,000 Drilling Completion Completed Well Cost (MM) 4.3 MM…
  7. Q1 2016 Conference Call – Lonestar Resources Ltd. – slide 7
    The Value of Long Laterals Surface & Facilities Drilling Pad Wellhead Equipment Separation Storage 0.5 MM Compression Gathering 0.5 MM Vertical + Angle Lateral 5,000 + 3,000 8,000 Drilling Completion Completed Well Cost (MM)…
  8. Q1 2016 Conference Call – Lonestar Resources Ltd. – slide 8
    Lonestars Drilling Locations Are Looooooonnnnng Engineered Locations by Lateral Length (perforated interval in feet) 9,000 9,000 8,000 8,000 7,000 7,000 6,000 6,000 Lateral Length (') 5,000 5,000 4,000 4,000…
  9. Q1 2016 Conference Call – Lonestar Resources Ltd. – slide 9
    Technology Advancements Beall Ranch Burns Ranch Locator Map Beall Ranch Eagle Ford Target Refinement 26-28H 32-34H Beall Ranch Well Highlights Beall Ranch Eagle Ford Offset Cumulative to Date Lonestar continues to focus on…
  10. Q1 2016 Conference Call – Lonestar Resources Ltd. – slide 10
    Technology Advancements Beall Ranch Burns Ranch Locator Map Beall Ranch Eagle Ford Well Costs 6.0 7,000' Location & Facilities Drilling Completion Lateral Length 5.0 6,000' Average Total Well Cost (MM) Perforated Lateral…
  11. Q1 2016 Conference Call – Lonestar Resources Ltd. – slide 11
    Lonestar Resources, Ltd. Appendix
  12. Q1 2016 Conference Call – Lonestar Resources Ltd. – slide 12
    GeoEngineered Completion Alliance Integrated Approach to Drilling, Completion, Stimulation & Production of Eagle Ford Laterals Technical Process Application Experience Vertical Pilot Logs Used To Select Geotarget to Optimize Both…
  13. Q1 2016 Conference Call – Lonestar Resources Ltd. – slide 13
    Lonestar Eagle Ford Shale Operating Expenses 12.00 5.0 4.5 Reported Lease Operating Expenses Per BOE Reported Lease Operating Expenses (MM) 10.00 4.0 3.5 8.00 3.0 6.00 2.5 2.0 4.00 1.5 1.0 2.00 0.5 0.00 0.0…