Introduction Ron Hagood Director, Investor Relations 3
Laredo Today Randy Foutch Chairman & CEO 4
Focus on Key Drivers That Impact Well Returns Acreage Position Improved well performance Earth Model Optimized Completions Infrastructure Improved efficiencies Infrastructure Focus of Capital Drilling Operating Activity Acreage…
Focus on Value Creation Through EUR Improvements NPV Sensitivity to EUR 10,000' UWC; 6.3 MM D&C 100% NPV Increase NPV-10 EUR 30% EUR Gain Recent results support increased EURs Note: Analysis based on 6/3/16 strip pricing…
Focus on Value Creation Through D&C Savings Rate of Return Sensitivity to D&C Cost 10,000' UWC 90% 80% 70% ROR-Percent 60% 50% . 40% 30% 20% 10% 0% 6.00 5.75 5.50 5.25 5.00 D&C Cost (MM) 35/Bbl 45/Bbl 55/Bbl Current…
Earth Model and Optimized Completions Benefits 1,600 32 +32% vs Oil Type Curve 1,400 through Earth Model 28 Cumulative Oil Production (MBO) 10 - 20% Uplift from and optimized Optimized Completions3 1,200 completions 10 - 20%…
Production Corridor and Infrastructure Benefits1 Production Corridor & Infrastructure Benefits 149 MM infrastructure investment 30 to date 25 90 MM in production corridors 25 Short payout period on investment 20 that will…
Peer-Leading Per Unit LOE 1Q-15 12 1Q-16 12 11 11 10 10 Peer Average 9 9 LOE (/BOE) LOE (/BOE) 8 8 7 7 Peer Average 6 6 5 5 4 4 LPI Peers Laredo outpaced peer groups LOE reduction by 16% since 1Q-15 1…
Capitalizing on Contiguous Acreage Position Contiguous acreage position enables: 80% of acreage supporting 10,000 laterals Centralized infrastructure in multiple production corridors increasing capital and operational efficiencies…
Near-Term Inventory Selection Process Near-term inventory selection criteria employed: 1. High working interest 2. Long laterals 3. Best Hz horizons from multiple zones 4. Earth Model technical analysis 5. Infrastructure investment…
Not All Locations Are Created Equal Individual Well NPV-10 7 Continuous effort to focus on quality 6 locations, not quantity, to create 5 shareholder value 2.3 NPV-10 ( MM) 4 3 1.9 6.2 2 0.2 0.6 1 1.2 0 7,500'…
Earth Model and Optimized Completions Improving Results % of Completed Lateral 30-Day Average IP Type Curve at Well Name Zone Length (Ft) (BOE) 30-Day1 SUGG-E-208-209-8SU UWC 7,304 1,041 144% SUGG-A-171-5SU UWC 9,939 1,034 109%…
Prior Investments Driving Results Earth Model and optimized completions yielded 1Q-16 average well results of 30% higher than type curve 10,000 UWC and MWC drilling and completions costs have decreased an additional 600,000 since…
Medallion-Midland Basin: The Premier Pipeline in the Permian Laredo benefits significantly from its 49% ownership in Medallion, the premier pipeline serving the most productive counties of the Midland Basin MedallionMidland…
Summary Strategic investments yielding results Contiguous acreage enables efficiencies through longer laterals and multiple production corridors providing cost, pricing and capital benefits Earth Model and optimized completions…
Earth Model James Courtier VP - Exploration & Geosciences Technology 19
Creating Value with Data, Experience and Technology Actions Results Predicted Well Role of Interference Technology & Performance Optimized Completions Ranked Zones Integration Analysis Optimized Well Spacing Ranked Wells…
Pre-Earth Model: Problem with Bivariate Statistics Bulk Modulus Poisson's Ratio 6-Month Cumulative Oil 6-Month Cumulative Oil R = 0.0021 R = 0.0015 Young's Modulus Brittleness 6-Month Cumulative Oil 6-Month Cumulative…
Log-Based Landing-Point Selection: Standard Wellbore A B C D Standard Wellbore Landing Point Significance A Clay content B Original oil in-place C Stress D Brittleness Landing Point 1 Simplified Dipole Log Display…
Earth Model-Based Wellbore Landing A B C D E Earth Model Wellbore Landing Point Significance A Clay content B Original oil in-place C Stress D Brittleness E Natural fracturing E Geomechanical attributes Simplified…
Earth Model-Based Wellbore Landing Example Cumulative Oil Production1 16 Earth Model and Landing Cumulative Oil Per 1000' (Mbbl) 14 optimized Landing Point 2 12 completions Point 1 10 Landing 8 Point 1 6 Pre Earth Model…
Earth Model-Based Wellbore Landing Landing Landing 100% Point 1 Points 2 & 3 90% Landing Point 1 Cumulative Probability ( or = ) 80% 70% Landing 60% Point 2 Landing 50% Point 3 40% 30% 20% 10% 0% Simplified…
Earth Modeling Workflow 1 Develop & improve technical data sets 2 Multivariate statistical calibration 3 Create 3D production attribute 4 Perform lookback analysis 5 Highgrade EUR and NPV targets 6 Plan new wells and execute…
Step 1: Develop & Improve Technical Data Sets Comprehensive core-to-log-to- seismic calibration 3,600 feet of core 589 petrophysical wells 131 dipole sonic logs 1,133 square miles of 3D seismic 47 wells with microseismic…
Step 1: Develop & Improve Technical Data Sets 28
Step 1: Takeaways 1 Develop & improve technical data sets Contiguous 3D seismic and attributes across 2 Multivariate statistical calibration 98% of our acreage 3 Create 3D production attribute Earth Model currently covers 80% of LPI 4…
Step 2: Multivariate Statistical Calibration 1 2 3 4 Increasing Production Increasing Production Increasing Production Increasing Production Increasing Completion Length Increasing P-Impedence Increasing Fluid Volume…
Step 2: Multivariate Statistical Calibration Cline-Canyon Model R2 0.760 Correlation Coeff 0.872 There is a point of diminishing return on the Predicted 180-day Oil addition of attributes 1.0 12 0.9 10 11 9 0.8 8 7 6…
Step 2: Takeaways 1 Develop & improve technical data sets We have developed a reliable, multi-variate 2 Multivariate statistical calibration relationship to 6-month oil production 3 Create 3D production attribute Capability of analyzing…
Step 3: Create 3D Production Attribute 33
Step 3: Takeaways 1 Develop & improve technical data sets Contiguous Earth Model production attribute 2 Multivariate statistical calibration over 80% of our acreage 3 Create 3D production attribute 4 Perform lookback analysis Multiple…
Step 4: Perform Lookback Analysis 250% 90-Day Cumulative Oil 225% 200% Predicted % of Type Curve 175% 150% 125% 100% 75% 50% 25% 0% 0% 25% 50% 75% 100% 125% 150% 175% 200% 225% 250% Actual % of Type Curve…
Step 4: Takeaways 1 Develop & improve technical data sets Validate 3D production attribute by 2 Multivariate statistical calibration performing look-back analysis 3 Create 3D production attribute 4 Perform lookback analysis Ability to…
Step 5: Highgrade EUR and NPV Targets 6-Month Oil vs. Oil EUR Increasing Cumulative 6-Month Oil /1,000 R = 0.7224 Increasing Oil EUR /1,000 Strong correlation between 6-month oil production and EUR demonstrates linkage and…
Step 5: Highgrade EUR and NPV Targets LP-1 LP-2 LP-3 Primary Target: LP-3 LP-4 Scaled 90-Day Cum. Landing Point Oil Prediction % of Type Curve LP-1 56,146 111% Earth Model extraction drives LP-2 63,423 126% LP-3…
Step 5: Takeaways 1 Develop & improve technical data sets Identification of highest productive 2 Multivariate statistical calibration targets at each location 3 Create 3D production attribute 4 Perform lookback analysis Evaluation…
Step 6: Plan New Wells and Execute Operations Optimizing volume around wellbore Optimized trajectory to target best landing point 40
Step 6: Takeaways 1 Develop & improve technical data sets Well planning based on 3D production 2 Multivariate statistical calibration attribute 3 Create 3D production attribute 4 Perform lookback analysis Targeting continuous…
Step 7: Earth Model Completions Optimization Extensive frac modeling based on applied Earth Model to optimize completion length 42
Step 7: Takeaways 1 Develop & improve technical data sets Wellbore placement impacts stimulated 2 Multivariate statistical calibration volume 3 Create 3D production attribute 4 Perform lookback analysis Improved production from…
Focus on Value Creation Through EUR Improvements NPV Sensitivity to EUR 10,000' UWC; 6.3 MM D&C 100% NPV Increase NPV-10 EUR 30% EUR Gain Recent results support increased EURs Note: Analysis based on 6/3/16 strip pricing…
Earth Model and Optimized Completions Benefits 1,600 32 +32% vs Oil Type Curve 1,400 through Earth Model 28 Cumulative Oil Production (MBO) 10 - 20% Uplift from and optimized Optimized Completions3 1,200 completions 10 - 20%…
Earth Model & Completion Optimization Results UWC MWC Cum. Production (MBOE) Cum. Production (MBOE) 250 250 200 200 150 1.1 MMBOE 150 Type Curve 1.0 MMBOE 100 100 Type Curve 50 (11 Wells Avg. 1,595 /ft Sand) 50 (9 Wells…
1Q-16 Well Results 250 UWC MWC Cum. Production (MBOE) 250 Cum. Production (MBOE) 200 200 150 1.1 MMBOE 150 Type Curve 1.0 MMBOE 100 100 Type Curve 50 7 Wells 50 1 Well 121% of Type Curve 217% of Type Curve 0 0 0 60…
GTI Project In-Progress 20 MM high-profile, joint-industry project Project Initiatives Complete Laredos Project Contribution Pilot Hole Logs & Cores Horizontal DFITs Selected as operator Well Refracs (-seismic & tracers) Conducted…
Drilling & Completions Karen Chandler Sr. Director - Operations 49
Integration of Earth Model and Optimized Completions Creating differentiated value through seamless integration Reservoir Characterization & Earth Model Optimized Depletion Pattern Lateral Placement Completions Pressure…
Optimized Completions: Real-Time Integration of Results Evaluating the Results Protecting the Formation / Completion Real-time microseismic Customized fluid packages Proppant and fluid tracers Optimized flowback techniques Cored thru…
Drilling and Completions Efficiency Drivers Contiguous acreage position enables: Longer laterals Production corridors Multi-well development planning enables: Drilling efficiencies, capital savings and accelerated learning curve…
Drilling & Completions Efficiencies Total Drilling Efficiency Average Drilling Days 1,000 30 Rig Accept to Rig Release (Ft/Day) Average Drilling Days Rig Accept to 900 25 800 Average Feet Drilled Rig Release (Days) 700…
Drilling Cost Reductions 250 200 150 (/Ft) 100 50 0 4Q-14 1Q-15 2Q-15 3Q-15 4Q-15 1Q-16 35% reduction in average drilling cost while increasing average well length by 45% 55
Completions Cost Reductions 800 700 600 500 (/Ft) 400 300 200 100 0 4Q-14 1Q-15 2Q-15 3Q-15 4Q-15 1Q-16 45% reduction in average completions cost while increasing average sand amount by 35% 56
Longer Laterals Improve Capital Efficiency 750 720 Well Cost per Stimulated Lateral Foot 700 650 (/Ft)1 630 600 589 550 500 7,500' Lateral 10,000' Lateral 12,500' Lateral 80% of our contiguous acreage…
Production Corridors and Infrastructure Wholly-owned gathering, transportation, infrastructure and marketing subsidiary Crude gathering/transportation Water gathering, distribution & recycle Water Oil Gas Natural gas…
Infrastructure Lowers Capital & Operational Costs 775 wells served by midstream assets 6.2 MM total realized benefits in 1Q-161 25 MM total estimated benefits for FY-16 Invested 149 MM in crude oil, water and natural gas…
Crude Infrastructure 40 miles of crude gathering pipelines and two crude oil truck stations Crude gathering from lease is more financially and operationally efficient vs truck transportation 1Q-16 50% of crude oil gathered by…
Reagan Truck Station Truck Offloading Tanks Crude Gathering Tanks Crude Gathering To Plains Pump Tanks Station To Medallion Pump & Truck Truck Station Offloading Tanks Reagan North Gathering LACT Units Truck Offload Incoming…
Water Infrastructure Investments in water infrastructure provide: Efficiencies and cost savings for our drilling and completions operations Capability to perform multiple completions simultaneously 80 miles of water gathering…
Water Treatment Plant Incoming 1 MM Bbl Produced Water Water Supply 0.3 MM Bbl 0.3 MM Bbl on Gathering Water Supply Water Supply Outgoing Recycled Water to Various Completions Water Produced Water Gathering Treatment…
Produced Water to Water Treatment Plant 1 MM Bbl Water Supply 0.3 MM Bbl 0.3 MM Bbl Incoming Produced Water Supply Water Supply Water Water Treatment Plant Produced Water Gathering Water Treatment Plant Produced water to Water…
Recycled Water Utilized for Completions 1 MM Bbl Water Supply 0.3 MM 0.3 MM Water Supply Water Supply Outgoing Recycled Water to Various Completions Water Treatment Plant Recycled Water Recycled water utilized for…
Natural Gas Infrastructure 175 miles of natural gas gathering pipelines and four centralized gas lift stations Extensive infrastructure provides: Downstream sales-point optionality Less dependence on third-party…
Centralized Gas Lift Primary Sales Secondary Sales Centralized gas lift vs individual well to Targa to Enlink compressors Gas Gathering 1Q-16 50% of LPIs total gas lift demand 760/month/well saved Gas Lift Distribution FY-16…
Production Corridor and Infrastructure Benefits1 Production Corridor & Infrastructure Benefits 149 MM infrastructure investment 30 to date 25 90 MM in production 25 corridors 20 Short payout period on investment ( MM) that…
Corridor Financial Benefits 1Q-16 Benefits 2016 Benefits LMS Service Actual ( MM) Estimated ( MM)1 LPI Financial Benefits Increased revenues Crude Gathering 2.2 10.3 & 3rd-party income Centralized Gas Lift 0.2 0.9 LOE savings…
Corridors Provide Operating Cost Reductions 140 8 7.58 120 6.90 120 7 108 6.09 Total Net LOE ( MM) Per Unit LOE (/BOE) 6 5.83 100 97 4.88 5 80 4 60 3 40 2 20 1 0 0 FY-14 FY-15 FY-16E 1Q-15 2Q-15 3Q-15 4Q-15…
Peer-Leading Per Unit LOE 1Q-15 12 1Q-16 12 11 11 10 10 Peer Average 9 9 LOE (/BOE) LOE (/BOE) 8 8 7 7 Peer Average 6 6 5 5 4 4 LPI Peers Laredo outpaced peer groups LOE reduction by 16% since 1Q-15 1…
Medallion Dan Schooley Sr. VP - Operations 77
Medallion-Midland Basin Crude Oil System 500 miles with 290,000 net acres dedicated to system 0.49/Bbl 2Q-16E cash flow margin net to LPI YE-16 estimated exit rate of 140,000 - 150,000 Bbl/d 2 MM acres either under AMI or…
Medallion-Midland Basin: The Premier Pipeline in the Permian Laredo benefits significantly from its 49% ownership in Medallion, the premier pipeline serving the most productive counties of the Midland Basin MedallionMidland…
Premier Pipeline in the Right Basin 58% of 1Q-16 Permian-Basin issued permits were in Medallions six supply counties 46% of current active rigs in the Permian working in Medallions six supply counties (39% in late 2015) 39% of…
Delivery-Point Optionality Colorado City Total delivery point capacity expected to exceed 500,000 BOPD Alon Refinery Acts as header system, offering Midland access to multiple, long-haul pipelines Multiple sales points…
Growing Volumes Medallions Delivered Volumes 120,000 100,000 80,000 Volumes (BOPD) 60,000 40,000 20,000 0 1Q-15 2Q-15 3Q-15 4Q-15 1Q-16 2Q-16E Laredo 3rd party Throughput on the Medallion system has grown…
Financial Rick Buterbaugh Executive VP & CFO 83
Foresight has Provided Value Creation Earth Model Enhanced well performance Infrastructure Reduced capital and operating costs Medallion takeaway Optionality in marketing while creating substantial value Hedging Cash flow…
Capitalizing on Proven Results: 2016 Capital Program 420 MM Budget 35 Operating 3 Hz Rigs 27 Now maintaining 3 rigs throughout year 13 Expected average completed lateral length of 9,800 345 Drilling 45 - 49 Hz Development…
Strong Financial Position 745 million of liquidity1 No term debt due until 2022 950 million of notes callable at Laredos option in 2017 Peer-leading, multi-year hedge position Debt Maturity Summary 1,000 800 5.625% Debt (…
Top-Quartile 1Q-16 Hedged Cash Margin 30 Laredos cash margins 25 preserved through proactive cost and risk management Hedged Cash Margin (/BOE) 20 initiatives Peer Average 15 10 5 0 LPI Peers1 1 Peers are CPE,…
2Q-16 Guidance Update Prior investments are leading to tangible improvements in both production and operating expenses Production Improved uptime on existing wells as a result of prior infrastructure investment Well results continue…
Financial Impact of Operations Results Production 1Q-16 results: 9% higher than midpoint of guidance 2Q-16 updated guidance: 6% increase to midpoint of prior guidance Drilling results support annual production growth YoY at 3 Hz rig…
Summary Randy Foutch Chairman & CEO 91
Summary Strategic investments yielding results Contiguous acreage enables efficiencies through longer laterals and multiple production corridors providing cost, pricing and capital benefits Earth Model and optimized completions…