Agenda 1. Introduction 2. Corporate Overview 3. 2015 Reserve Report 4. Operating in a Low Price 5. Drilling 6. Exploration PAREX PLAYBOOK March 2016 5
Parex Vision 1. Generate long-term shareholder value 2. Build a portfolio of assets to allow for consistent growth 3. Develop an organization with bench strength to allow Parex to evolve into the leading LATAM independent E&P…
Parex Leadership Team Wayne Foo CEO Stu Davie Ken Pinsky Dave Taylor Vice President CFO President HR & Admin Mike Kruchten Ryan Fowler Eric Furlan VP Corporate Planning VP Exploration VP Engineering & IR Cam Grainger…
Demonstrating Portfolio Flexibility Operating Results(1) 2014 2015 Production (bopd) Full Year 22,526 27,434 Capital Expenditures (million) US 297 US 126 Exploration Drilling ( of prospects) 16 5 Discoveries 7 3 Appraisal ( wells)…
Consistent Performance 32 28 Average Production (000 bopd) 24 20 16 12 8 4 0 2011 2012 2013 2014 2015 2016E(1) 15 consecutive quarters of production growth (1) See Advisories on slides 2-4 PAREX PLAYBOOK…
Annual Finding, Development & Acquisition Costs(1) Profitability = Cash Netbacks F&D Total Company 2015 2015 3 Year 45 1P 2P 2P 40 F&D /bbl 2.00 0.88 9.35 FD&A /bbl 2.00 3.57 10.86 35 Recycle Ratio F&D /bbl 6.2x 14.0x 3.1x 30…
Portfolio Supports the Path to Growth Track record of progressing reserves* from 3P to cash flow(1)(2) Proved +Probable Proved + Probable Proved Annual 2P Reserves + Possible (mmboe) (mmboe) Production Life Index based on annualized…
2016 Guidance Flexibility : to Adjust Scenario 1: November 2, 2015(1) Assuming Brent oil price averages 50/bbl in 2016, we are targeting full year: 165MM cash flow 15/bbl cash netback 165MM Capex 30,200 bopd production (10% y-y…
Our view of 2016 Netbacks (H1) (1) Based on flat production 29,000 bopd Q415 Brent US/bbl 25 30 35 40 45 44.69 Discount 6.50 6.50 6.50 6.50 6.50 8.00 transport 12.00 12.00 12.25 12.25 12.50 12.46 royalty 1.75 2.00 2.25 2.50 2.75…
2015 Reserve Report Summary PAREX PLAYBOOK March 2016 14
Annual Reconciliation (1)(2) Oil & Gas1 (MBOE) Total Total Proved Proved plus Probable Opening Balance - December 31, 2014 40,424 68,425 Technical Revisions2 10,305 6,759 Discoveries & Extensions3 6,779 15,481 Extensions and Improved…
Future Development Capital (1)(2) 2P Future Development Capital Reconciliation USD (000) FDC December 31, 2014 360,865 New Discoveries 65,584 Aguas Blancas (farm-in acquisition) 65,340 December 31, 2014 FDC Spent in 2015 (18,855)…
Undeveloped Locations 160 Gross Undeveloped Locations(1)(2) 1P Undeveloped 140 2P Undeveloped 3P Undeveloped 120 100 Number of Wells 80 60 40 20 0 2012 2013 2014 2015 Locations in 2015 are in Rumba (2),…
Comments On 2015 Reserves Strong exploration results with discoveries at Jacana, Rumba and Chachalaca. Significant reserve additions by converting 3P to 2P to 1P. Integration of geologic, geophysical, engineering and performance data…
Reserves Additions Adding Reserves in Existing Pools PAREX PLAYBOOK March 2016 20
Ability to Understand Reserves Tua Lookback Most of the pools in the Llanos basin have an active water drive. This means water is pushing the oil to the producers updip from the edge. The time to water breakthrough for a producer is…
Tua Field Rates Two distinct periods of relatively flat production with no new wells. In 2015 a facility expansion allowed production to be increased. PAREX PLAYBOOK March 2016 22
Tua Reality 2015-12-31 Used in Simulation: -9489 ft TVDSS Parex simulation models incorporate all of the static (geology) and dynamic (performance) information. GLJ Mapping is in the cases which are very close to the Parex high…
Existing Pool Adds: Recovery Factors Most pools in the Llanos basin have recovery factors that vary from 35% to 60%. High recovery factors are typical in the Llanos basin due to the very active aquifer and very hot reservoir…
Existing Pool Adds: Conversion Opportunities A large number of Parex fields have reserves conversion opportunities but the most significant opportunities exist at Jacana and Tigana in LLA-34. Jacana was drilled in 2015 has been…
Jacana Discovery GLJ 2015 Year End(1) Oil Gross Pay(2) Oil Gross Pay(2) GLJ Low Case GLJ High Case The Guadalupe reservoir has only been penetrated by two wells, therefore the range of pay in the low to high case is very wide.…
Tigana GLJ and Parex Source: GLJ GLJ has adopted much of the reservoir architecture from the modeling work Parex has completed. Remaining differences between Parex and GLJ modelling mapping are largely in the placement of the oil…
Converting Reserves - Summary Opportunities to convert 3P to 2P to 1P remain as pools are not fully delineated and uncertainties remain. The main uncertainty in most of the LLA 34 pools is the level of the oil/water contact which…
Operating in a Low Price Environment PAREX PLAYBOOK March 2016 29
Low Maintenance Capital Requirement Why Conventional oil wells in large fields typically have a long, flat producing life. In fields where multiple reservoirs are encountered in a single well, this flat life is extended even further…
Tigana Field Rates With no new wells, Tigana has been producing flat (or increasing) for 16 months PAREX PLAYBOOK March 2016 31
Multi Zone Abilities Most of the wells encountered in LLA 34 have multi zone potential. Mirador The ability to recomplete new uphole zones provides for long term production from the well. Guadalupe PAREX PLAYBOOK March…
LLA-34: IP 30 Day Rates (1) The mean rate of 1,000 bopd is skewed to the low-side because higher productivity wells are never produced at their capability. (1) See Advisories on slides 2-4 PAREX PLAYBOOK March 2016 33
Akira Field Rates Swing Producer Akira is used as a 100% W.I. swing field for Parex to stabilize and maintain Corporate production. The field has been produced in a range of 1,000 to 4,000 bopd as required. PAREX PLAYBOOK March…
How to Keep Maintenance Capital Low 1. Drill wells in areas that deliver over 1,000 bopd initial rate and have low decline due to active acquifer support. 2. Have back up zones in existing wells that can be recompleted to supplement…
Drilling PAREX PLAYBOOK March 2016 36
Improved Well Costs Parex has reduced Well Cost year over year through o Operating Efficiencies o Well Design o Contractual Negotiations In the years 2010-2012 Parex Reduced Drilling Cost on average by 30% In the years 2013-2015…
Exploration The Future of Parex in Colombia PAREX PLAYBOOK March 2016 38
The Llanos Basin Foreland - Exploration Perspective Cano Limon High deliverability reservoirs Arauca Arauca Oily basin Natural aquifer pressure support Relatively secure operations Foreland Reasonable royalty Foreland ANH…
Llanos Basin Foreland Discovery History Source: IHS Data 2015 Parex accounts for about 25% of 2P reserves additions Historical Production Plus Current 2P Reserves (MMBO) since 2010 while drilling about 18% of 500 MMBO…
Becoming Llanos Basin Experts The Evolution of Parex Understanding Initial Perceptions o High Rates o Oily Basin o Active Natural Water Drive o Structural Play Types Small Pools Learning Along The Way o Edge water has higher…
Progressively Larger Discoveries Structural Traps Median Llanos Kona Las Maracas Rumba fits Tua 100 acres 300 acres 300 acres in here at 1000 acres 600 -700 ac 1. Size 200m 300m 300m 1km 2. Drive Bottom water drive Edge…
Rumba Field: 2015 Discovery and Development PAREX PLAYBOOK March 2016 44
Rumba High quality prospect identification La Gloria The Rumba Prospect was Norte identified by Parex prior to the 2008 Bid Round on LLA-26 o Block was acquired by competitor La Gloria There are significant fields to the north and…
Rumba Reserves Year End 2015 (1) (2) CI = 10 Bazar 2 GLJ 2P = 5.1 MMBO(2)(3) GLJ 3P = 6.8 MMBO(2)(3) Production = 4000 bopd (capable of 5000 Rumba 2 bopd) Rumba 4 Rumba 1 Capital Invested = 43MM (plus 9MM FDC) Six…
Between Exploration & Development Appraisal of The Tigana Trend There are numerous stratigraphic elements that act as traps in the Southern Casanare area o Pinch outs, Onlaps, Subcrops, Sealing Unconformities The faults in the area…
Expanding the Llanos Basin PAREX PLAYBOOK March 2016 50
Llanos Basin Foreland Exploration (1) Cano Limon 2016 Program 2 Wells: o Jaruki Arauca o Curucucu Este (or alternate LLA 34 well) Future Focus: o Combination & Stratigraphic Traps Current Portfolio: Foreland o 41 Gross…
Llanos Basin Foothills Area (1) Cano Limon High deliverability Capachos reservoirs Arauca Arauca Mixed Oil & Gas Area Large Pool Sizes High cost drilling Difficult access Foreland Current Parex Portfolio: Casanare Capachos…
Capachos Block: Arauca Regional Context Arauca Cano Limon Caricare Capachos ARUACA LLA 10 Llanos DEM PAREX PLAYBOOK March 2016 53
Capachos Guadalupe Potential(1) 2 earning wells are planned between old producers that cummd 1 mm bbls/well Additional exploration upside exists in 6 undrilled prospect areas Development earning well locations Prospective…
Middle Magdalena Basin PAREX PLAYBOOK March 2016 55
The Middle Magdalena Basin Characteristics Lower deliverability reservoirs in some cases caused by reservoir damage o Modern fracs have improved deliverability Oily basin World Class dormant unconventional play in the La Luna…
Mid Mag Basin Discovery History Source: IHS Data 2015 Historical Production Plus Current 2P Reserves (MMBO) Nare Norte Teca-Nare Provincia Velasquez Cantagallo Casabe La Cira Infantas PAREX PLAYBOOK March…
Aguas Blancas Development PAREX PLAYBOOK March 2016 59
How Mid Mag Basin Geology & History = Growth Opportunity ECP is the dominant land holder in the Mid Mag basin o Low oil prices have caused ECP to look for low cost/risk alternatives to increase production farm outs Significant…
La Cira Infantas Aguas Blancas Area Map LISAMA: 51.86 MM OCUM CASABE: 333 MMB OCUM LA CIRA-INFANTAS: 813 MMB OCUM NUTRIAS: 6.55 MM OCUM PEROLES: 1.8 MM OCUM COLORADO 8.66 MMB OCUM AGUAS BLANCAS 0.93 MMB OCUM IHS…
La Cira Infantas Production History Source: SPE 120794 PAREX PLAYBOOK March 2016 62
Infantas Field Analog La Cira The southern end of the Infantas Field is covered by the Aguas Blancas 3D. Direct analog for the Footwall accumulation. W E W E Infantas Mugrosa Oil Accumulation PAREX PLAYBOOK March 2016…
La Cira Infantas to Aguas Blancas La Cira Field Infantas Field AGUAS BLANCAS BLOCK SUBSURFACE FAULT Aguas Blancas-2 TRENDS PAREX PLAYBOOK March 2016 64
La Cira to Aguas Blancas Correlation AB -7 AB -2 AB -5 Infantas La Cira La Cira SPE 121854 SPE 121854 Universidad Industrial De Santander 2013 PAREX PLAYBOOK March 2016 65
Aguas Blancas Current Reserves (1) (2) (2) 790 acre 266 acre GLJ reserves booking in Aguas Blancas is limited to blocks where there is some well control. In the footwall (left) the compartment has been filled from the…
Aguas Blancas: Phase 1 Development Current Status(1)(2) Target Areas(1)(2) Phase 1a drills from existing pads Phase 1b drills from new pads. Drill additional infill Reserves Areas wells. Prospective Resource Area Water-flood…
Current Activities Performed a classification of the existing pads, according to surface conditions and feasibility of utilization. Pads type A (activity planned for first part of Phase I) Under certain surface limitations and…
Phase 2: Value Realization Phase 2. Goal: Section Field Development Objectives: Implement Development Optimized Capex Plan (Well Cost / Facilities) Optimized Opex Plan (LOE, Power, Well Maintenance, Water Management). Implement…
PetroAndina past experience. Back in 2004 Looking for oil North of Rio Colorado Source: Petro Andina, company presentation PAREX PLAYBOOK March 2016 70
PetroAndina past experience / similarities (1) Parex plan for Aguas Blancas is similar in scope and magnitude to the appraisal and development of Block CNQ7-A (and nearby ones) in the Neuqun Basin, North of Ro Colorado. Large discovery…
Petro Andina +200 wells/year drilled Reached 30,000 BOPD gross Source: IHS Data PAREX PLAYBOOK March 2016 72
If Colombia Focused, Where Next PAREX PLAYBOOK March 2016 73
The Future of Exploration in Colombia The Future According to the USGS Source: IHS Data 2015 Colombia Discovery History Cumulative Reserves by Basin Parex Arrival Historical Production Plus Current 2P Reserves (MMBO) Worst…
Wrap-Up Balance sheet and financial strength positioned to capture new opportunities High quality assets provide the foundation for growth in next 3-5 years, even in a lower-for-longer world Organization in place (management,…