Capitalizing on Contiguous Acreage Position Contiguous acreage position with 4,500 gross feet of prospective zones enables: 80% of acreage supporting 10,000 laterals Centralized infrastructure in multiple production corridors…
Near-Term Inventory Selection Process Near-term inventory selection criteria employed: 1. High working interest 2. Long laterals 3. Best Hz horizons from multiple zones 4. Earth Model technical analysis 5. Infrastructure investment…
Not All Locations Are Created Equal Individual Well NPV-10 7 Continuous effort to focus on quality 6 locations, not quantity, to create 5 shareholder value 2.3 NPV-10 ( MM) 4 3 1.9 6.2 2 0.2 0.6 1 1.2 0 7,500'…
A Continuous Focus on Key Drivers That Impact Well Returns Acreage Position Improved well performance Earth Model Optimized Completions Infrastructure Improved efficiencies Infrastructure Focus of Capital Drilling Operating…
Prior Investments Driving Results Earth Model and optimized completions yielded 1Q-16 average well results of 30% higher than type curve 10,000 UWC and MWC drilling and completions costs have decreased an additional 600,000 since…
Financial Impact of Operations Results Production 1Q-16 results: 9% higher than midpoint of guidance 2Q-16 updated guidance: 6% increase to midpoint of prior guidance Drilling results support annual production growth YoY at 3 Hz rig…
Peer-Leading Per Unit LOE 1Q-15 12 1Q-16 12 11 11 10 10 Peer Average 9 9 LOE (/BOE) LOE (/BOE) 8 8 7 7 Peer Average 6 6 5 5 4 4 LPI Peers Laredo outpaced peer groups LOE reduction by 16% since 1Q-15 1…
Top-Quartile 1Q-16 Hedged Cash Margin 30 Laredos cash margins 25 preserved through proactive cost and risk management Hedged Cash Margin (/BOE) 20 initiatives Peer Average 15 10 5 0 LPI Peers1 1 Peers are CPE,…
Creating Value with Data, Experience and Technology Actions Results Predicted Well Role of Interference Technology & Performance Optimized Completions Ranked Zones Integration Analysis Optimized Well Spacing Ranked Wells…
Continually Developing & Improving Technical Data Sets Comprehensive core-to-log-to- seismic calibration 3,600 feet of core 589 petrophysical wells 131 dipole sonic logs 1,133 square miles of 3D seismic 47 wells with…
Enhancing Completions with the Earth Model and More Sand Objective of the Earth Model is to facilitate the landing and steering of Standard the wellbore and optimize the Wellbore completion to maximize oil production Completions…
Log-Based Landing-Point Selection: Standard Wellbore A B C D Standard Wellbore Landing Point Significance A Clay content B Original oil in-place C Stress D Brittleness Landing Point 1 Simplified Dipole Log Display…
Earth Model-Based Wellbore Landing A B C D E Earth Model Wellbore Landing Point Significance A Clay content B Original oil in-place C Stress D Brittleness E Natural fracturing E Geomechanical attributes Simplified…
Optimized Landing Point and Completions Highgrades EUR LP-1 LP-2 LP-3 Primary Target: LP-3 LP-4 Scaled 90-Day Cum. Landing Point Oil Prediction % of Type Curve LP-1 56,146 111% Earth Model extraction drives LP-2…
Right Attribute Combination Improves Well Planning Assessing productive area around wellbore Optimized trajectory to target best landing point Extensive frac modeling to optimize completions Extensive frac modeling based on…
Lookback Shows Earth Model is Superior to Standard Wellbore 250% 90-Day Cumulative Oil 225% 200% Predicted % of Type Curve 175% 150% 125% 100% 75% 50% 25% 0% 0% 25% 50% 75% 100% 125% 150% 175% 200% 225% 250%…
Earth Model and Optimized Completions Benefits 1,600 32 +32% vs Oil Type Curve 1,400 through Earth Model 28 Cumulative Oil Production (MBO) 10 - 20% Uplift from and optimized Optimized Completions3 1,200 completions 10 - 20%…
Earth Model & Completion Optimization Results UWC MWC Cum. Production (MBOE) Cum. Production (MBOE) 250 250 200 200 150 1.1 MMBOE 150 Type Curve 1.0 MMBOE 100 100 Type Curve 50 (11 Wells Avg. 1,595 /ft Sand) 50 (9 Wells…
Integration of Earth Model and Optimized Completions Creating differentiated value through seamless integration Reservoir Characterization & Earth Model Optimized Depletion Pattern Lateral Placement Completions Pressure…
Drilling & Completions Efficiencies Total Drilling Efficiency Average Drilling Days 1,000 30 Rig Accept to Rig Release (Ft/Day) Average Drilling Days Rig Accept to 900 25 800 Average Feet Drilled Rig Release (Days) 700…
Infrastructure Lowers Capital & Operational Costs Infrastructure includes crude gathering/transportation, water gathering, distribution & recycle, natural gas gathering, and centralized gas lift compression 775 wells served by…
Corridor Financial Benefits 1Q-16 Benefits 2016 Benefits LMS Service Actual ( MM) Estimated ( MM)1 LPI Financial Benefits Increased revenues Crude Gathering 2.2 10.3 & 3rd-party income Centralized Gas Lift 0.2 0.9 LOE savings…
Corridors Provide Operating Cost Reductions 140 8 7.58 120 6.90 120 7 108 6.09 Total Net LOE ( MM) Per Unit LOE (/BOE) 6 5.83 100 97 4.88 5 80 4 60 3 40 2 20 1 0 0 FY-14 FY-15 FY-16E 1Q-15 2Q-15 3Q-15 4Q-15…
Medallion-Midland Basin: The Premier Pipeline in the Permian 500 miles with 290,000 net acres dedicated to system 0.49/Bbl 2Q-16E cash flow margin net to LPI YE-16 estimated exit rate of 140,000 - 150,000 Bbl/d 2 MM acres…
Medallion-Midland Basin Crude Oil System Medallions Delivered Volumes 120 100 Volumes (MBOPD) 80 60 40 20 0 1Q-15 2Q-15 3Q-15 4Q-15 1Q-16 2Q-16E Laredo 3rd party Truck offloading Delivery point Throughput on the…
Strong Financial Position 745 million of liquidity1 No term debt due until 2022 950 million of notes callable at Laredos option in 2017 Peer-leading, multi-year hedge position Debt Maturity Summary 1,000 800 5.625% Debt (…
Capitalizing on Proven Results: 2016 Capital Program 420 MM Budget 35 Operating 3 Hz Rigs 27 Now maintaining 3 rigs throughout year 13 Expected average completed lateral length of 9,800 345 Drilling 45 - 49 Hz Development…
Rig Cadence Drives Oil Percentage Number of Gross Hz Completions per Quarter vs. % Oil Production 30 70% Number of Gross Hz Completions per Quarter 60% 20 % Oil Production 50% 46% 10 40% 0 30% 1Q-14 2Q-14 3Q-14…