Skip to main content August 2016 Corporate Presentation – Nuvista Energy Ltd. | Shale Experts
Loading...

August 2016 Corporate Presentation – Nuvista Energy Ltd.

Nuvista Energy Ltd. · Aug 31, 2016 · 23 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 1
    CORPORATE PRESENTATION August 2016 All amounts in Canadian dollars unless indicated otherwise
  2. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 2
    NuVista Snapshot NuVista Corporate Info (June 30, 2016) TSX Trading Symbol: NVA Market Capitalization: 1.0 billion Basic Shares Outstanding: 156.8 million Bank Revolver Capacity: 200 million Percent Drawn: 45% Net Debt:Cashflow1:…
  3. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 3
    NVA Principles and 2016 Guidance Focused on the Long Term Flexibly Managing the Short Term Maintain Balance Sheet Profitable Growth Tuned Reducing Costs & Strength to Market Environment Improving Performance Net debt/funds flow…
  4. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 4
    The Alberta Condensate-Rich Montney A Sweet Spot in a World Class Play 1. Scalable/Repeatable Deposition on the shelf edge not isolated pockets Gas charged top to bottom Over-pressured low water saturation High Quality 2. Porous…
  5. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 5
    The Alberta Condensate-Rich Montney Industry Drilling and Production Growth Continues Elmworth to Kakwa Montney HZ Activity Update* High level of industry activity continues T70 850 Montney HZ wells licensed and/or drilled to date…
  6. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 6
    2016 Capital Guidance Ability to Adapt to Commodity Price Environment 2015A FY Capex 2016FY Capex March Forecast 2016FY Capex June Forecast (MM) (MM) (MM) DCET & Well Optimization Facilities & Water Mgmt Maintenance Other 6 8 6 11…
  7. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 7
    Funded Growth Plan at Strip and Upside Pricing Capital Expenditures (MM) Production (MBoe/d) 300 Upside Case Strip Case 35 Upside Case Strip Case 273 30 29.0 25.5 3.0 25 22.4 1.0 200 175(2) 180 273 20 10 26.0 40 24.5 22.4 15…
  8. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 8
    Relentless Improvement Efficiency and Well Costs Montney Well Cost (DCET) By Year Average Annual Montney Drilling Curves 12 0 2013 2014 2015 2016 Record Wells 10 1,000 2,000 8 Depth (m) 3,000 (MM) 6 4,000 4 Recent…
  9. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 9
    Relentless Improvement Bilbo Well Performance Bilbo Type Curve Progression Bilbo Well Production-to-Date 400 2013 Type Curve (4.4 Bcf; 35 Bbls/MMcf) 700 2014 Type Curve (4.4 Bcf; 45 Bbls/MMcf) 2015 Type Curve (4.4 bcf, 75 bbl/mmcf)…
  10. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 10
    Relentless Improvement Elmworth Well Performance Elmworth Type Curve Progression Elmworth Well Production-to-Date 400 2013 Type Curve (4.4 Bcf; 35 Bbls/MMcf) 700 2014 Type Curve (4.4 Bcf; 45 Bbls/MMcf) 2015 Type Curve (6 Bcf, 45…
  11. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 11
    Montney Operations Activity Update R8W6 R7W6 R6W6 Activity Highlights 3 New Bilbo IP30's in Q2 T70 Elmworth Currently Drilling with 2 rigs 16 Wells Producing in the Development Block (IP30) 4 Elmworth Extension wells Producing…
  12. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 12
    Elmworth Development Block Volume Ramp In-Progress North Montney Sales Production R9W6 1 R8W6 Rig Drilling 3 Well pad on-stream in September 10 Cumulative-to-Date T69 Sales Gas NGL's C5+ 9 Bbls/MMcf Condensate 9 8 Butane 9…
  13. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 13
    Bilbo Development Block Focus on Efficient Production Additions in 2016 South Montney Sales Production 3 New IP30's Two-well Pad Drilling Cumulative-to-Date 16 T66 Bbls/MMcf Sales Gas NGL's C5+ Condensate 14 4 Butane 5 12…
  14. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 14
    Wapiti Montney Firm Egress Counts Built-in growth with generous capital flexibility in the short term and multiple options for the long term Grande Prairie Proposed 2018 Wapiti Area Gas Plants NuVista (50%) North Compressor…
  15. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 15
    Wapiti Montney Processing Capacity Firm Capacity with TOP flexibility built in All products have virtually 100% FIRM downstream take-away 2016 Montney Production 20,000+ Boe/d 15,000+ Boe/d of Future Growth Capacity in Place 200…
  16. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 16
    Commodity Price Risk Management We are well hedged with under 10% AECO exposure for 2016 Crude Oil Hedge Position 3,500 80.00 3,000 70.00 2,500 60.00 Hedged Volume, Bbl/d 50.00 Floor C WTI price of Price, C/Bbl 2,000…
  17. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 17
    NuVista Operating Results 2016 Guidance Corporate Production (Boe/d) 2016 Actual Production 2016 Prod. Guidance (Boe/d) (Boe/d) Wapiti Montney Other Properties 30,000 25,484 Q1 25,484 24,500 - 25,000 23,355 23,451 25,000 23,215…
  18. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 18
    NuVista Looking Forward Flexibility and Strength in a Volatile Environment Balance sheet comes first Top plays win at any price, wells keep improving Focused capital discipline & reducing unit costs No material unutilized TOP cost…
  19. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 19
    APPENDIX August 2016 21
  20. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 20
    Gold Creek Delineation Continued Encouragement 13-25 Shut-in pending tie-in IP30 Raw Gas C5+ Total Sales C5+ Yield Well (MMcf/d) (Bbls/d) (Boe/d) (Bbl/MMcf) 8-12 On-production 16-19 6.8 377 1,307 56 13-25 1.8 263 543 146 16-1…
  21. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 21
    2015 Year-end Reserves Report 2015 Year-end Reserves Report GLJ Petroleum Consultants Ltd. PDP reserves volume increased 40% before production and dispositions, or 13% after Corporate TP+PA reserves volume increased by 15% Corporate…
  22. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 22
    Condensate Pricing Strong Demand and Premium Price for the Long Term Western Canadian Condensate Pricing Condensate is used in Alberta as a diluent to ship heavy oil on pipelines Condensate in Alberta is typically priced at a…
  23. August 2016 Corporate Presentation – Nuvista Energy Ltd. – slide 23
    Lower Montney Activity NuVista Data Collection In-Progress R9W6 R7W6 R5W6 R3W6 Multiple pilot wells in progress by T70 Pipestone SCL 15-1-69-6W6 industry Early Production Data Tested: 1.9 MMcf/d and 174 bpd C5+ Emerging…