Skip to main content October 2016 Update – Storm Resources Ltd. Investor Presentation | Shale Experts
Loading...

October 2016 Update – Storm Resources Ltd.

Storm Resources Ltd. · Oct 31, 2016 · 30 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. October 2016 Update – Storm Resources Ltd. – slide 1
    OCTOBER 2016 UPDATE 1
  2. October 2016 Update – Storm Resources Ltd. – slide 2
    INTRODUCTION Started Sept 2010, fourth Storm since Nov 1998 history of per share growth in prodn & asset value 120 MM shares + 7 MM options, TSX-V symbol SRX officer + director ownership 13% (16% FD) Market cap 570 MM (4.75/sh)…
  3. October 2016 Update – Storm Resources Ltd. – slide 3
    PRODUCTION 5 hzs turned on in 2016 to maintain 13,000 Boe/d prodn per share +48% annually since Q2/13 (3 years) 3
  4. October 2016 Update – Storm Resources Ltd. – slide 4
    FUNDS FLOW funds flow per share flat since Q2/15; prodn per share growth has been offset by decline in commodity prices 4
  5. October 2016 Update – Storm Resources Ltd. – slide 5
    CASH COSTS PER BOE focused on reducing cash costs in all price environments H1/16 cash costs decreased 16% from 2015 transportation is excluded from controllable cash costs as sales price for volumes shipped on the Alliance…
  6. October 2016 Update – Storm Resources Ltd. – slide 6
    COST OF RESERVE ADDITIONS all-in reflects entire capital investment program significant improvement in 2015 2015 3 Year PDP 6.53/boe 14.18/boe 1P 3.38 9.70 2P 0.50 7.82 2015 1P & 2P reflects FDC changes 6
  7. October 2016 Update – Storm Resources Ltd. – slide 7
    MAJOR AREAS large shale gas resource in HRB, Umbach Montney needs higher nat gas price 109,000 net acres 12,850 Boe/d* growth driven by developing Montney at Umbach (liquids rich nat gas) Horn River Basin 78,000 net acres 0 Boe/d…
  8. October 2016 Update – Storm Resources Ltd. – slide 8
    UMBACH AREA (North East British Columbia) 1% H2S requires sour gas plant Montney liquids rich gas (McMahon or Stoddart GPs) 155 net sections access to 3 sales 109,000 net acres gas pipelines from 1,200 1,300 btu/scf McMahon GP Q2/16…
  9. October 2016 Update – Storm Resources Ltd. – slide 9
    UMBACH ACTIVITY two step-outs in 2016 current field compression 80 mmcf/d raw (Q3/16 throughput 69 mmcf/d) 3rd facility adds 35 mmcf/d raw in Jan/17 (expandable to 70 mmcf/d for 7 MM) 2015 hzs 2016 hzs 9
  10. October 2016 Update – Storm Resources Ltd. – slide 10
    PROCESSING ARRANGEMENT AT UMBACH Reviewed other alternatives; provides highest ROR uses less than 20% of drilling locations at 4 hz/section on 80% of lands Total commitment 65 mmcf/d raw starting Jan 2017 45 mmcf/d for 15 years…
  11. October 2016 Update – Storm Resources Ltd. – slide 11
    UMBACH HORIZONTAL WELL PERFORMANCE 11
  12. October 2016 Update – Storm Resources Ltd. – slide 12
    UMBACH 2014 - 2016 HORIZONTAL WELLS 12
  13. October 2016 Update – Storm Resources Ltd. – slide 13
    UMBACH HORIZONTAL WELL LENGTH 13
  14. October 2016 Update – Storm Resources Ltd. – slide 14
    UMBACH HORIZONTAL FRAC SPACING 14
  15. October 2016 Update – Storm Resources Ltd. – slide 15
    UMBACH HZ COSTS accounting system costs 2016 avg drill & compl 4.1 MM, most recent hzs 3.8 MM drill cost incl pad & roads reductions from pad drilling, mud system, improved logistics, lower service costs DRILLING hzs fracs length cost…
  16. October 2016 Update – Storm Resources Ltd. – slide 16
    UMBACH HZ ECONOMICS recent hzs tracking 7.0 Bcf type curve reasonable ROR at low pricing flat prices, not escalating for comparison, 2015 all- full cycle (excl land) in PDP FD&A 6.53/boe +1,380 K/hz facility + pipelines…
  17. October 2016 Update – Storm Resources Ltd. – slide 17
    UMBACH LANDS DELINEATED TO DATE Montney productive across the area; encouraging results on adjacent lands 33% of lands delineated 20% with 2P 6% with producing hzs 17
  18. October 2016 Update – Storm Resources Ltd. – slide 18
    GUIDANCE (updated Sep 7/16) updated to accelerate 2017 growth (improving nat gas price) guidance contingent on nat gas price recent drill & complete cost 10% below budget (2017 uses 4.1 MM/hz) 18
  19. October 2016 Update – Storm Resources Ltd. – slide 19
    PROCESSING & TRANSPORTATION Firm processing 72 mmcf/d sales (80 mmcf/d raw) 15 mmcf/d raw Stoddart, 65 mmcf/d raw McMahon 85% of forecast 2017 nat gas sales Firm transport increases to 96 mmcf/d in 2018 looking to add more capacity to…
  20. October 2016 Update – Storm Resources Ltd. – slide 20
    AECO CHICAGO DIFF Cdn demand flat (lower TCPL toll may increase) weaker near term AECO price with continuing prodn growth (wider diff increases exports to other markets) 20% of NGTL receipts from NE BC (growing) Storm has 55 mmcf/d on…
  21. October 2016 Update – Storm Resources Ltd. – slide 21
    BC NAT GAS FLOWS TCPL expansions at Towerbirch (2018) & North Montney () move nat gas out of BC, more to AECO 21
  22. October 2016 Update – Storm Resources Ltd. – slide 22
    AECO - BC STATION 2 DIFF AECO - Stn 2 diff back to historical levels (wider in 2015 with less volume to Alliance & TCPL) growing BC prodn increases Stn 2 price risk 22
  23. October 2016 Update – Storm Resources Ltd. – slide 23
    HEDGING (Oct 7/16) Hedge up to 50% of current prodn as insurance to support growth; growth volumes are not hedged target 50% of current prodn hedged 1 to 12 months forward target 25% of current prodn hedged 13 to 24 months forward may…
  24. October 2016 Update – Storm Resources Ltd. – slide 24
    SUMMARY Operations going well, hz rates improving, costs decreasing Montney at Umbach is higher quality, liquids rich asset Capital investment contingent on commodity pricing; nat gas price low in 2016 and growth deferred to 2017 2016…
  25. October 2016 Update – Storm Resources Ltd. – slide 25
    STORM RESOURCES LTD. CONTACT INFO For further information please contact: Brian Lavergne, President and Chief Executive Officer Donald McLean, Chief Financial Officer Carol Knudsen, Manager Corporate Affairs Address: 200, 640 5th…
  26. October 2016 Update – Storm Resources Ltd. – slide 26
    Discovered Petroleum Initially in Place (DPIIP) is defined in the COGEH handbook as the quantity of hydrocarbons that is estimated to be in place within a known accumulation. Discovered Petroleum Initially in Place is divided into…
  27. October 2016 Update – Storm Resources Ltd. – slide 27
    APPENDIX
  28. October 2016 Update – Storm Resources Ltd. – slide 28
    NAT GAS PRICING USING 2017 FWD STRIP 2017 FWD STRIP (Aug 5/16) Sell in Chicago NYMEX US3.15/mmbtu NYMEX US3.15/mmbtu NYMEX - Chicago diff - US0.01/mmbtu NYMEX - Chicago diff -US0.01/mmbtu Chicago price Cdn3.93/GJ FX 1.32 Alliance…
  29. October 2016 Update – Storm Resources Ltd. – slide 29
    HORN RIVER BASIN HRB (NE BC) Shale gas from Muskwa, Otter Park, Evie shales 81,000 net acres, 100% WI 123 net sections Drilled 2 hzs & 2 verticals to validate commerciality 1 producing hz, 1 standing hz
  30. October 2016 Update – Storm Resources Ltd. – slide 30
    US NATURAL GAS PRICE US storage overhang vs 5 yr avg is getting fixed quickly as a result of growing demand Sabine LNG T1 & T2 2016 1.4 Bcf/d Electric +2.1 Bcf/d YTD Jul/16 v Jul/15 (EIA) T3 Q2/17 +0.7 Bcf/d Industrial +0.4 Bcf/d YTD…

From the store

Browse maps, data & reports in the Shale Experts store