Skip to main content October 2016 Corporate Presentation – Stage Completions Inc | Shale Experts
Loading...

October 2016 Corporate Presentation – Stage Completions Inc

Stage Completions Inc · Oct 31, 2016 · 24 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. October 2016 Corporate Presentation – Stage Completions Inc – slide 1
    Innovating Completion Optimization October 2016
  2. October 2016 Corporate Presentation – Stage Completions Inc – slide 2
    The Trends in Drilling & Completions 120.00 WTI Prices: 2010 -Present 100.00 80.00 Innovation 60.00 Required 40.00 20.00 0.00 2010 2011 2012 2013 2014 2015 2016
  3. October 2016 Corporate Presentation – Stage Completions Inc – slide 3
    Drilling and Completion Trends in the Montney Increased Frac Stages 2010: Average 10 stages 2016: Average 26 Stages Increased Fluid Pumped 2010: 2,500 cubic meters 2016: 15,000 cubic meters Source: Raymond James, Jeremy…
  4. October 2016 Corporate Presentation – Stage Completions Inc – slide 4
    Drilling and Completion Trends in the Montney Increased Completed Length 2010: 1,250 meters 2016: 2,000 meters Increased Total Proppant Placed 2010: 750 tonnes 2016: 2,500 tonnes Source: Raymond James, Jeremy McCrea 4
  5. October 2016 Corporate Presentation – Stage Completions Inc – slide 5
    Drilling and Completion Trends in the Montney Movement to Slickwater 2010: 20% of wells using Slickwater 2016: 70% of wells using Slickwater Source: Raymond James, Jeremy McCrea 5
  6. October 2016 Corporate Presentation – Stage Completions Inc – slide 6
    The Drivers Behind the Changing Trends The Goal Superior Capital Efficiencies The Requirements Higher Productivity and EURs The Solution Increased Stimulated Rock Volume Higher Pump Pinpoint Longer Laterals Tighter…
  7. October 2016 Corporate Presentation – Stage Completions Inc – slide 7
    The Challenges
  8. October 2016 Corporate Presentation – Stage Completions Inc – slide 8
    Water Management and Social Impact Water Management Issues o Slickwater becoming dominate completion o Water to inflate coil tubing o Potable water requirement for certain completion styles o Ability to access adequate water for…
  9. October 2016 Corporate Presentation – Stage Completions Inc – slide 9
    Current Systems Not Meeting all Design-Change Demands Based on 4.5-in (114.3-mm) Casing Plug & Perf Sliding Sleeve Ball-Drop (Clustered Stages) (Coil Tubing) Unlimited stages Yes Yes No Reduced pumping friction pressure Yes No No Can…
  10. October 2016 Corporate Presentation – Stage Completions Inc – slide 10
    Risks and Limitations of Current Systems Sliding Sleeve with Coil Plug and Perf Ball-Drop Pump rate limitations due to friction Significant time required to place Screenouts can potentially lead to pressure plugs and perforate while…
  11. October 2016 Corporate Presentation – Stage Completions Inc – slide 11
    The Innovation
  12. October 2016 Corporate Presentation – Stage Completions Inc – slide 12
    Stage Completions Inc. Stage Completions Inc. is a downhole technology company focused on providing innovative completion solutions 90% privately held, 10% to be acquired by Blackbird Energy Inc. (TSX-V: BBI) Three main product lines…
  13. October 2016 Corporate Presentation – Stage Completions Inc – slide 13
    Production and Operational Advantages o Optimize every fracture treatment / Accurately place every fracture treatment Pinpoint fracturing o Maximize stimulated reservoir volume Longer Laterals o 216 stages currently available (700…
  14. October 2016 Corporate Presentation – Stage Completions Inc – slide 14
    Stages Advantages o Large bore access allows clean outs from heel to toe with no restrictions in coil or tubing size o Collets can be removed at any point in time allowing full drift of liner o Without retrieval, Stage system has…
  15. October 2016 Corporate Presentation – Stage Completions Inc – slide 15
    Discussing Costs and Savings
  16. October 2016 Corporate Presentation – Stage Completions Inc – slide 16
    The Cost and Savings Discussion Compared to Ball Drop o Costs comparable to ball drop but with significant operational advantages Compared to Plug and Perf o No coil tubing unit to drill out plugs, no drill bits and accessories o…
  17. October 2016 Corporate Presentation – Stage Completions Inc – slide 17
    Stages Deployment
  18. October 2016 Corporate Presentation – Stage Completions Inc – slide 18
    Quality Assurance Ability to land collets at between Blackbird 06-14-70-7W6M Pump Down 1 m3/min and 5 m3/min Continuous completion Over 100 surface tests Varied pressures, temperatures and rates 100% success Two wells…
  19. October 2016 Corporate Presentation – Stage Completions Inc – slide 19
    Innovation Being Deployed Largest Sliding Sleeve Completion in Elmworth /Pipestone Corridor
  20. October 2016 Corporate Presentation – Stage Completions Inc – slide 20
    Blackbirds 02/2-20 Montney Well Blackbird is implementing the largest sliding sleeve completion in the Elmworth / Pipestone Corridor 71-76 Stage sleeves 4,000 tonnes of proppant (2.0 tonnes per linear meter) 2,150 meter…
  21. October 2016 Corporate Presentation – Stage Completions Inc – slide 21
    Roll Out Achievement The Montney The Permian The Eagle Ford The Uinta The Bakken The Cardium China Successfully Being Deployed in Cased and Open Hole Applications 21
  22. October 2016 Corporate Presentation – Stage Completions Inc – slide 22
    The Stage Advantage
  23. October 2016 Corporate Presentation – Stage Completions Inc – slide 23
    Stage Checks All The Boxes Based on 4.5-in (114.3-mm) SC Bowhead II Plug & Perf (five Sliding Sleeve Ball-Drop Casing clusters/stage) (Coil Tubing) Unlimited stages Yes Yes Yes No Reduced pumping friction pressure Yes Yes No No Can use…
  24. October 2016 Corporate Presentation – Stage Completions Inc – slide 24
    Disruptive Completions Technology Higher Tonnages High Utility of Capital Higher Rates Stages Bowhead II Increased EURs Longer laterals Improved Water Management More Stages 24

From the store

Browse maps, data & reports in the Shale Experts store