CLR Production and Reserve Growth STACK/SCOOP 35% of Production STACK/SCOOP 40% of Reserves 250,000 1,400 STACK / NW Cana STACK / NW Cana 219K 215K SCOOP 1,226 SCOOP 7% 1,200 Bakken 7% 200,000 Bakken Legacy Legacy 1,000 34% Boe Per…
CLR STACK OverPressured Meramec Results Exceptional and Repeatable First well announced August, 2015 Normally Pressured 15 wells completed FIRST WELL/AUG 2015 OverPressured 300 sq. miles derisked 2782 Boepd 930 psi (76% oil) Tested…
Impressive Performance from Wells Producing 90 days CLR STACK OverPressured Meramec Results Data as of August 1, 2016 Cum. Current Current OverPressured Normally Pressured Production Rate Flowing 221 MBoe (70% Oil) Name Days (Mboe)…
Outstanding Economics from OverPressured Oil Window CLR Meramec Type Curve and Economics(1) Single Well Economics Type Curve 10,000 1,700 MBoe EUR 40 100% +100% ROR 80% 70% ROR 30 Well Count 1,000 Boe per day 60%…
STACK Meramec Quickly Expanding Through StepOuts and Density Testing OverPressured Normally Pressured 37 industry rigs currently drilling 11 CLR rigs Blurton 6 Meramec, 5 Woodford Bernhardt 18 CLR wells WOC 9 true industry density…
CLR Density Pilots Underway OverPressured Oil Window 1 Mile Blurton Density Ludwig Unit Aerial 1,320 2,090 660 660 495 440 550 Upper Meramec 705 1,320 1,155 1,155 990 Middle Meramec Lower Meramec Osage/Sycamore 1 Mile 1…
SCOOP Woodford Condensate Enhanced Completions have Uplifted Production 40% Widespread, Repeatable Results 26 wells with 90 days of production 15% increase in EUR to 2,000 MBoe per well 100% ROR for incremental capital of…
SCOOP Condensate Window CLR Enhanced Completion Type Curve and Economics(1) Single Well Economics 10,000 Type Curve 40 100% 30 80% Well Count Boe per day 60% ROR 45% ROR 1,000 20 40% 10 20% 0% 100 0 2 3 4 Gas…
SCOOP Woodford Oil Enhanced Completions have Uplifted Production 30% 22 enhanced completions outperform legacy offsets Oil Window Enhanced Completions 30% increase in EUR to 1.3 MMBoe per well (62% oil) for 9,800foot lateral 32%…
SCOOP Woodford Condensate Density Results Poteet 10Well Density: 166 Mmcfe Per Day IP (7% Oil) 28 Bcf/384 Mbo cumulative production 47 Mmcfe per day production (7day average) Poteet 10 wells Poteet Daily Production(1) 10 New…
Sustainable Drilling Efficiencies Realized Through Pad Drilling 0 Poteet Average 1Q'15 Honeycutt Average 2Q'15 5,000 Efficiency gains from 1st to 4th PAD: Vanarkel Average 3Q15 Measured Depth (FT) Newy Average 4Q15 39%…
SCOOP Springer Oil Asset Waiting for Higher Prices/Enhanced Completions/2 mile Laterals Historical results in line with 940 MBoe type curve 10,000 90 SCOOP Type Curve (Norm. to 4,500 LL) 80 Act. Production (Norm. to 4,500 LL) 70…
CLR Production Expense and Cash G&A Comparison 20 18 CLR Lowest Among Select Peers 16 (As of 2Q 2016) PurePlay 14 Permian Peers 12 /Boe Group 10.82 11.09 10.47 10 average 8+ 8.93 9.35 9.60 8 7.16 6 5.32 5.76 4.94 5.30 4…
World Class Resource Plays Uncovered in Mature Basin For the young people in the audience: Embrace technology STACK Think out of the box MERGE Next discovery may be right in your CANA backyard SCOOP 22