2 Current Status Dec 2016 Production Overview 2016 average production forecast of 190,000-195,000 boepd (approx. 25% annual growth over 2015 average of 154,400 boepd) 2016 exit production estimate of approximately 210,000 215,000…
3 Historical EP Performance Mar 2016 Production Growth Per Share* Reserves Growth Per Share* 300 5 Production per Thousand Shares Reserves per Share (BOEs) 250 4 200 3 (BOEs) 150 2 100 50 1 0 0 2009 2010 2011…
Largest Canadian Gas Producers; 4 2015 & 2016 Dec 2016 Canadian WCSB Gas Production 2015A & 2016E** 1,700 1,600 2015A Natural Gas (MMcf/d) 1,500 2016E Natural Gas (MMcf/d) 1,400 2017E Natural Gas (MMcf/d) 1,300 1,200…
5 Alberta Deep Basin Sep 2016 R. 9 R. 8 R. 7 R. 6 R. 5 Tourmaline R. 4 R. 3 R. 2has reached R.1W6M R26,W5M production levels of 135,000 boepd from the Deep Basin through Current Production 130,000-135,000 boepd T. 64 drilling…
6 Alberta Deep Basin Shell Deep Basin Assets Oct. 2016 Tourmaline has reached production levels of T65 R9 R7 R5 135,000 boepd from the Deep Basin through Current Production* 130,000 -135,000 boepd drilling 267 hz wells to date. The…
7 Shell Deep Basin Assets Overview Oct 2016 The asset is the original Duvernay Oil Corp. Deep Basin position supplemented with incremental acreage by Shell. (2008-2016) The asset was producing approximately 17,500 boepd in 2008…
8 Top Gas Wells Drilled in Alberta in the Last 12 Months (90 Day Average IP) Sep 2016 CalendarDay Avg Natural Gas Production (Mcf/d) 20,000 Tourmaline had 18 of the top 20 gas wells in Alberta between July 2015 and July 2016, all…
NEBC Montney Gas Condensate and Peace 9 River High Charlie Lake Oil Core Areas Dec 2016 Current Prod. 75,000-80,000 boepd Doe 2-11 plant start-up in April 2017 will add an incremental 12,500 boepd BC Montney In excess of 3,750…
10 Sunrise/Dawson NEBC Montney/Doig Development Dec 2016 Westcoast McMahon Gas Plant Current Prod. 250-270 mmcf/d 4,500-5,000 bopd (cond,ngls) Current Reserves 376.2 mmboe (Jan 1, 2016) Montney Drilling In excess of 2,100…
11 Tourmaline Montney EP Performance Sep 2016 200,000 1.8 180,000 BC/AB Montney Well Performance Montney Production NEBC 1.6 160,000 Average IP 30 Well Rates (2015/16) 1.4 140,000 120,000 1.2 Boe/d 000 Boe/d 100,000 1…
Shell Gundy Ck BC Montney Asset 12 The Creation of a Tourmaline Northern Montney Core Area Oct 2016 One of most attractive Montney sub-play areas in Western Canada with a 300m thick overall section, 4 separate lobes and liquid…
13 Gundy Ck Acquisition/ Northern Montney Complex Oct 2016 Gundy Current Production: 6,214 boepd (July) No of wells drilled: 25 F No of potential locations: 1647 (100% TOU) C G C HH H H D H Liquid content: 30-50…
14 Peace River High Complex Charlie Lake Play Oct 2016 Earring 15-16 R. 10 R. 9 R.BOPD, IP90: 130 7 R. 5 1.7 MMSCF/D Peace River High Charlie Lake Play 1,606 Horizontal Locations* along Regional Play Fairway Mulligan 4-13 Upper…
15 Tourmaline Mid-Stream Assets Dec 2016 The infrastructure skeleton in all three core operated complexes is now complete R. 1W6 R. 15W6 R. 15W5 Gundy Inga 17 Working interest gas plants, 14 of which NE Alberta BC are 100%…
17 Gas Development Location Inventory and Economics Oct 2016 AB Deep Basin Outer Foothills AB Deep Basin B.C. Montney Charlie Lake Vertical Vertical Horizontal Horizontal Horizontal Total Well Costs 3.7 5.25 4.40 2.90 2.7 (Drill,…
18 Completed Well Costs and EUR By N. American Play Type Aug 2016 Drilling 3 Completed Well Cost CDN EUR (Bcfe) Montney Wells 25 22.5Bcfe 20 19.2 Bcfe 17.7 Bcfe 15 13.7 MM 12.0 MM 10 8.4 8.7 MM 8.7 MM MM 8.1 Bcfe…
19 Tourmaline vs US Gas Weighted Peers Cash Costs Per BOE Aug 2016 Operating Transportation G&A Interest 12.00 10.80 10.00 1.62 1.81 8.00 Costs Per BOE 6.00 5.05 0.45 5.39 0.36 4.00 1.60 2.00 2.64 1.98 -…
20 Capital Cost Reduction Overview July 2016 Tourmaline drill and complete capital costs have been reduced by 30% since Q1 2015. A further 15% reduction is targeted with the 2H 2016 EP program. The Company estimates that 60-65% of…
22 2017/18 Guidance Dec 2016 2017(1) 2018(1) Pro Forma(2) Pro Forma(2) Production Boe/d 250,000 - 260,000 310,000 - 320,000 Cash Flow - MM(i) 1,440 1,871 CFPS - Diluted(i) 5.34 6.87 E&P Capital Program - MM 1,331 1,791…
23 Underlying Natural Gas Fundamentals are Strong. Mar 2016 Supply/Demand fundamentals support a strong natural gas price recovery, the warm 2015/2016 winter has temporarily deferred this rally, to 2H 2016/Q1 2017. Natural Gas…
24 Natural Gas Flows From Western Canada
25 2H 2016 Highlights/2017 Outlook Dec 2016 Tourmaline now a senior with 2017 production in excess 250,000 boepd. (30%+ annual growth) The Company will exceed 1.6 billion boe in reserves in 2016. (50%+ annual growth) Completed…
APPENDIX
27 Shell Acquisition Overview Oct 2016 A major step towards the ongoing plan to become Canadas and one of North Americas largest, most efficient, lowest cost and profitable natural gas producers. The acquisition provides a…
28 Tourmaline Vs. US Shale Plays (1) Apr 2016 Tourmaline Tourmaline Marcellus Shale Marcellus Shale Utica Alberta Deep Basin (2) B.C. Montney (2) Liquids Rich Drill, Case, Complete 3.6MM 2.5MM 8.2MM 8.2MM 12.8MM Costs…
29 Marcellus & Utica Rig Count vs Production Analysis Apr 2016 180 25 70 Rigs required to keep Appalachia Aggregate Gas 160 Production Flat at 19.8 Bcf/d(1)(2) 20 140 120 15 100 Rig Count Bcf/d 80 10 60 40…
30 Hedging Summary 2017 Nov 2016 2017 Gas Hedges Volume Weighted Avg Price mcf/d /mcf(1) 231,044 Total price protected volumes Fixed Price Hedges (mcf/d) AECO (CDN) 86,300 2.65 196,000 Production volumes committed Fixed Nymex (US)…
32 EP Growth Plan (Original Business Plan) Sept 2008 This is essentially the same business plan that was executed for Duvernay Oil Corp. (2001-2008) Primary growth mechanism will be a conventional EP Program (including Resource…
33 Western Canadian Sedimentary Basin Selected Exploration & Production Opportunities NORTHWEST TERRITORIES Alta. Deep Basin Peace River High Charlie Lk. Oil. Alta./NEBC B.C. ALBERTA Resource Plays Peace River High…
34 Alberta Deep Basin Overview Aug 2016 The Alberta Deep Basin is the largest gas producing sub-basin in Western Canada, with current production of 3.2-3.3 bcf/day. The Alberta Deep Basin and the BC/Ab Montney are Canadas two…
35 Alberta Deep Basin: Wilrich Regional Resource Play Apr 2016 R. 9 R. 8 R. 7 R. 6 R. 5 R. 4 R. 3 R. 2 R.1W6M R26,W5M T. 64 T. 64 Kakwa 4-29 Kakwa 13-12/5-12 30 day IP T.20.2 63 mmcfpd 30 day IP 19.2 mmcfpd T. 63 Tourmaline…
Alberta Deep Basin: 36 Notikewin/Falher Hz Program Apr 2016 R. 9 R. 8 R. 7 R. 6 R. 5 R. 4 R. 3 R. 2 R.1W6M R26,W5M KakwaT. 649-17 Kakwa 1-7 T. 64 30 day IP 21.8 mmcfpd 30 day IP 16.4 mmcfpd T. 63 T. 63 T. 62 Wild R 3-9…
37 Banshee Alberta Gas Plant Simple, easy to construct dew point plants tied to the main TCPL sales system Total cost (2 phases) of 80M, capacity of 130 mmcfpd with enhanced liquids recovery capability
38 Tourmaline vs Canadian Gas Weighted Peers Cash Costs per BOE (Q2/16) Aug 2016 Operating Transportation G&A Interest 14.00 12.26 12.00 2.18 10.00 1.38 Costs Per BOE 8.00 2.56 6.52 6.00 0.58 0.47 2.06 4.00…
39 Current Reserve Distribution Mar 2016 R. 15W6 R. 1W6 R. 15W5 Peace River High NE Alberta Total Natural Gas Reserve Base of 5.69 100 Inga 84.3 BC TCF, the second largest in Canada. 75 Peace River High T85 mmboe Charlie…
2015/Q1 2016 Acquisition Activity 40 Sweet Spot Consolidation Strategy Apr 2016 R. 15W6 R. 15W6 R.R. 1W6 1W6 R. 15W5 R. 15W5 2015 Acquisition activities will focus on adding new lands and incremental locations in the highest…
41 2015 New EP Opportunities Apr 2016 Tourmaline has multiple new plays and opportunities arising from the ongoing EP program. R. 15W6 R. 1W6 R. 15W5 All of these new opportunities will access existing Tourmaline infrastructure NE…
42 2017/2018 New EP Project Inventory: Significant Growth Upside Apr 2016 2017 Base Case Volume Contribution 2H 2017/2018 Incremental Production Project from the New EP Projects Volume Potential (Upside Case) BC Montney Turbidite…
43 Tourmaline Environmental Performance Tourmaline strives to continually improve all aspects of environmental performance including the impact of its operations on air, land and water. Tourmaline ranks as a top decile performer…
44 North East BC Montney Water Management July 2013 Non-potable water sourced lined reservoir for frac operations (2 non-freshwater wells) Separate water pipeline system to existing and future pads. Frac water pumped to pads…
45 Tourmaline Technology Curve/Future Concepts, Requirements & Opportunities Cost saving via novel frac water sourcing/recycling Alternative hz frac programs/processes Concurrent pairs, delayed flow-backs etc. Novel drilling…
46 2016 Financial/Capital Outlook Aug 2016 EP capital budgets for 2016 and beyond will be less than or equal to cash flow. First half 2016 capital program reduced to 310 million. The Company continues to maintain one of the…
47 Capitalization to Date Insiders Public Total millions of shares Price* millions of shares Price* 2008 Financings Common shares 28.50 5.16 22.00 7.00 301.0 2008 Financings Flow through shares 1.25 10.00 1.25 10.00 25.0 2009…
48 Schedule A DRILLING LOCATIONS This presentation discloses drilling locations in four categories: (i) proved undeveloped locations; (ii) probable undeveloped locations; (iii) unbooked locations; and (iv) an aggregate total of (i),…
49 Schedule A continued Deep Basin Vertical well count : Approximately 2,600 gross prospective sections at approximately 1.5 wells per section minus 10% for areas that are inaccessible or limited by spacing requirements minus…
50 Schedule B Prospective locations are unbooked locations that are not included in inventory. Unbooked locations are internal estimates based on the Company's prospective acreage and an assumption as to the number of wells that can…