Led By Experienced Management Team Each member of the senior management team has more than 30 years of energy industry experience Randy Foutch has founded four successful exploration and production companies and operated through a…
Prior Investments Creating Value Multi-zone, contiguous acreage position enabling development efficiencies In the first nine months of 2016 completed lateral length of 10,000 driving higher rates of return Data powering the…
FY-17E Budget Expectations 530 MM 2017 Capital Budget 2017 Drilling & Completions 450 Operating 4 Hz rigs 80 1 Drilling and completing 70 Hz wells 85% targeting the UWC & MWC 95% average working interest Hz wells average 10,000…
Consistent Production Growth Anticipate 2017 production growth of 15% 25,000 20,000 Estimate Production1,2 (MBOE) 4Q 15,000 1Q-3Q 2016 Actual 10,000 5,000 0 2011 2012 2013 2014 2015 2016E 2017E Actual…
Capitalizing on Contiguous Acreage Position 141,459 gross/124,958 net acres1 Contiguous acreage position with 4,500 gross feet of prospective zones Centralized infrastructure in multiple production corridors and ability to drill…
Multiple Targeted Horizons Identified Primary targets Hz Wells Drilled Thickness OOIP1 Secondary targets Landing Points Clearfork Upper/Middle Spraberry Lower 4,500 gross ft. of prospective zones Spraberry 2 415 90 2-3…
Drilling Efficiencies Drive Lower Well Costs LPI Drilled Lateral Footage per Rig per Year 2017E 175 2016 166 2015 125 2014 88 2013 76 0 20 40 60 80 100 120 140 160 180 200 Thousand Lateral Feet Drilled per Rig per Year…
Drilling & Completion Costs 10,000 D&C Capital Savings 1 10 9 8.2 Efficiency gains partially 8 offset recent increases in D&C Capital Per Well ( MM) 1.4 7 service costs 6.4 6 1.0 5 D&C capital includes: 4 Pad…
Laredos Technology Workflow Actions Results Predicted Well Role of Interference Technology & Performance Optimized Completions Ranked Zones Integration Analysis Optimized Well Spacing Ranked Wells Frac Modeling Optimized…
Evolving Beyond the Earth Model Enhanced analysis of key production drivers 2015 2016 2017 12-18 months project duration 6-12 months project duration 2-4 weeks project duration 50% of LPI acreage 80% of LPI acreage 100% of LPI +…
Hydraulic Fracture Test Site (HFTS) 23 MM high-profile, joint-industry project led by In-Progress Laredo and the Gas Technology Institute (GTI) Key Initiatives Complete Slant Well Fracture & Proppant Analysis Laredos Project…
Earth Model and Completion Optimization Benefits Wells utilizing the Earth Model and optimized completions have performed at an average of 139% of Oil Type Curve1 4,500 72 4,000 64 39% uplift vs Oil Type Curve 3,500 through Earth…
Multivariate Earth Model Enhancing Production Upper Wolfcamp Middle Wolfcamp 350 300 Cumulative Production (MBOE) Cumulative Production (MBOE) 300 250 250 200 200 1.1 MMBOE 150 1.0 MMBOE 150 100 100 28 wells avg. 1,826…
Latest Optimization Tests Significantly Exceeding Type Curve Initial two wells utilizing the multivariate Earth Model and optimized drilling and completions with 2,400 lb/ft sand are yielding results significantly greater than type…
Prior Investment in Infrastructure Providing Tangible Benefits 6.0 MM total realized benefits in 3Q-161 25 MM total estimated benefits for FY-161 195 horizontal wells served by production corridors with potential for 2,500 more2…
Corridor Financial Benefits 1.6 MM benefit over life of each 10,000 corridor well, with 25% of the benefit received in the first six months1 Water Oil Gas 3Q-16 Benefits 2016 Benefits LMS Service Actual ( MM) Estimated (…
Peer-Leading Unit LOE1 3Q-15 9 3Q-16 9 8 8 7 7 Peer Average LOE (/BOE) LOE (/BOE) 6 6 5 5 Peer Average 4 4 3 3 2 2 LPI Peers Production corridor assets reduced unit LOE 0.52/BOE in 3Q-16 1 Peers…
Medallion-Midland Basin Crude Oil System Medallion - Midland Basin System1 600 miles with 325,000 net acres dedicated to system 2 MM acres either under AMI or supporting firm commitments System Deliverability: Colorado City: 125…
Medallion-Midland Basin: The Premier Pipeline in the Permian Current Oil Production per Square Mile (Bbl/d) Medallions Delivered Volumes 0 200 400 600 800 1,000 1,200+ 140 0.48/Bbl EBITDA net to LPI in 3Q-16 120 Volumes…
Strong Financial Position 800 MM of liquidity1 No term debt due until 2022 950 million of notes callable at Laredos option in 2017 Top-tier, multi-year hedge position Debt Maturity Summary 1,000 800 5.625% Debt ( MM) 600…
Top-Tier, Multi-Year Hedge Position Oil Hedges Natural Gas Hedges 100% 100% 90% 90% 80% 80% Hedging 70% 70% program % Natural Gas Hedged1 provides price % Oil Hedged1 60% 60% 50% 50% protection 40% 40% while…
EBITDA Reconciliation LPI Adjusted EBITDA 3Q-16 (in thousands, unaudited) Net income 9,485 Plus: Depletion, depreciation and amortization 35,158 Non-cash stock-based compensation, net of amounts capitalized 9,651 Accretion of…