Restructing Process Completed – Greenfields Petroleum Corporation

Greenfields Petroleum Corporation · Sep 29, 2016 · 20 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. Restructing Process Completed – Greenfields Petroleum Corporation – slide 1
    Greenfields Petroleum Corporation Restructuring Process Completed Back to Work September 2016 TSX.V: GNF & GNF.DB
  2. Restructing Process Completed – Greenfields Petroleum Corporation – slide 2
    Bahar Acquisition and Restructuring Greenfields acquired the remaining 2/3 interests in Bahar Project on August 9th 2016. Greenfields restructured corporation on August 18, 2016. Settled subordinated senior debt 25MM Settled…
  3. Restructing Process Completed – Greenfields Petroleum Corporation – slide 3
    Bahar ERDPSA Offshore Shallow Water Caspian Sea, Azerbaijan The Neighborhood of Big Oil and Gas Billion Barrel and Multi TCF Fields Neft Dashlary Field 1,200 MMBO Gum-Deniz Field CUM 212 MMBO REM 329 MMBO(1) Guneshli Field…
  4. Restructing Process Completed – Greenfields Petroleum Corporation – slide 4
    Bahar ERDPSA closer look Contractor Parties Bahar Energy Limited (BEL) (80 %) BAKU wholly owned subsidiary of Greenfield Petroleum Corporation SOCAR Oil Affiliate (20%) 2016 August Gross Production 4,450 BOE/d Bahar Reserves…
  5. Restructing Process Completed – Greenfields Petroleum Corporation – slide 5
    Transportation Systems GAS Sold to SOCAR Gas Export Take or Pay Contract Realization: US3.96/mcf OIL All volumes sold to SOCAR Marketing pipeline shipped to Novarossiysk (or Supsa) liftings every 6 to 10 days…
  6. Restructing Process Completed – Greenfields Petroleum Corporation – slide 6
    Bahar Energy Limited (BEL) Reserves (GLJ 12/31/2015) Greenfields Proved Proved Total Total Total 2P Total 3P Interest Producing Developed Proved Probable 100% of BEL Oil 0.43 2.5 5.2 4.9 9.8 13.8 (MMbbls) Gas 5.3 90.6 93.7 107 156.3…
  7. Restructing Process Completed – Greenfields Petroleum Corporation – slide 7
    Key Highlights Greenfields alone funded 33.5MM into project (2014 & 2015) during period of partner default Dramatic operating costs reductions 89MM reduced to 20MM (11 per BOE) Reduced personnel & contract services Gum Deniz…
  8. Restructing Process Completed – Greenfields Petroleum Corporation – slide 8
    Bahar Gas Field Revised Structure Map Integrated structure map at top X series Minor tear faulting and crestal grabens 9
  9. Restructing Process Completed – Greenfields Petroleum Corporation – slide 9
    Bahar Gas Well Recompletions Phase 1 (51 recompletions over 5 years) X/Y: 421600 Meters 4445800 4445800 Net Pay - 4700 -4 0 50 5 5 4 65 meters PSG workover rig 50 - 4675 2 - - 45 - 44 7 on Bahar…
  10. Restructing Process Completed – Greenfields Petroleum Corporation – slide 10
    2016 Bahar Gas Well Activities 2016 First Initial Expected IP, Approved AFE Amount , Rig Well Platform Target Flow Operation Jan Feb Mar Apr May Jun Jul Aug S ep Oct Nov Dec MMCFPD US D Units 1 B-149 77 X upper & IXlow 3.6…
  11. Restructing Process Completed – Greenfields Petroleum Corporation – slide 11
    Bahar Field Workovers and Recompletions 2016 MODULAR RIGS for offshore gas platforms Each module weighs less than 4 tons Easily moved with crane Skidmounted draw works; fast installation Double lifting mast, hydraulically raised…
  12. Restructing Process Completed – Greenfields Petroleum Corporation – slide 12
    Gum Island Gum Deniz Oil Field Development Plan New Drill Plan Completed wells (5) Phase 1 (28 Wells) Phase 2 (55 Wells) Phase 3 (288 Wells) 20 Ac spacing Future oil well drilling to start with 1 KM Phase 1 at end of…
  13. Restructing Process Completed – Greenfields Petroleum Corporation – slide 13
    2016 Oil and Gas Well Activities 2016 ERA Proposed Initial ERA Proposed Initial Reserve from Estimated Cum Annual Economic Limit, first target, Production from Total Reserve, Cost Estimate, Rig PLATFORM Well MTD, m PBTD, m Target…
  14. Restructing Process Completed – Greenfields Petroleum Corporation – slide 14
    Next Steps: ReStart Development Maintain reduced operating costs Continue oil and gas recompletions and workovers successful and less expensive expanding program and adding more ESPs double existing production to 10,000 BOE/D…
  15. Restructing Process Completed – Greenfields Petroleum Corporation – slide 15
    Bahar and Gum Deniz Redevelopment (Phase 1) 16
  16. Restructing Process Completed – Greenfields Petroleum Corporation – slide 16
    Bahar Acquisition and Restructuring Greenfields acquired the remaining 2/3 interests in Bahar Energy Limited on August 9th 2016. Consideration of 66MM 6MM cash and forgiveness of 60MM default obligations Greenfields restructured…
  17. Restructing Process Completed – Greenfields Petroleum Corporation – slide 17
    Greenfields Debt Equity Structure 1/3 BEL Interest 3/3 BEL Interest Previous Debt Equity Structure Current Debt Equity Structure (September 2016) Equity 22.1 MM Common shares Equity 157 MM Common shares Major Shareholders Major…
  18. Restructing Process Completed – Greenfields Petroleum Corporation – slide 18
    Greenfields Transaction Summary Net P2 Reserves tripled to 37.5 MBOE Total outstanding debt was reduced from USD84MM to USD44MM maturity was extended to March 2018 Cash available post restructuring of 2MM Available cash to be…
  19. Restructing Process Completed – Greenfields Petroleum Corporation – slide 19
    In Summary, The acquisition of the remaining portion of the Bahar Project allowed Greenfields to triple our reserves, and to reduce the corporations debt obligations by almost half. Going forward with control of the project, and…
  20. Restructing Process Completed – Greenfields Petroleum Corporation – slide 20
    Contact Information Greenfields Petroleum Corporation John Harkins CEO Phone: (832) 2340834 Facsimile: (877) 6446211 John.Harkinsgreenfieldspetroleum.com Wayne Curzadd CFO Phone: (832) 2340835 Facsimile: (877) 6446211…