Skip to main content January 2017 Investor Presentation – Lonestar Resources Ltd. | Shale Experts
Loading...

January 2017 Investor Presentation – Lonestar Resources Ltd.

Lonestar Resources Ltd. · Jan 31, 2017 · 26 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 1
    Lonestar Resources US, Inc. Investor Presentation January 2017
  2. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 2
    Company Profile Share Price History Current Team In Place Since 2012 15.00 300 Originally funded by Ecofin, UKbased capital group Gradually built a team from Encore, Pioneer, Denbury 12.00 240 Volume ('000 Shares) and…
  3. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 3
    Lonestar Highlights Core Eagle Ford 36,785 net acre Eagle Ford position which is 100% operated with an average WI of 85% Position with Substantial derisked drilling inventory: 143 net potential locations including 54 PUD locations…
  4. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 4
    Experienced Management Team Executive Previous Experience Biography 37 years experience in the oil and gas industry John H. Pinkerton Founder, Chairman and Chief Executive Officer Range Resources Chairman of the Board Built Range…
  5. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 5
    Track Record of Growth Through Technical Excellence Focused on returns every step of the way Acquiring leasehold that allows for extended reach lateral development and achievement of hurdle rate returns Better Aggregate smaller…
  6. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 6
    Asset Overview
  7. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 7
    Company Profile Eagle Ford Shale Play 3Q16 Production Eastern 5.8 MBoe/d NGLs 21% Oil Gas 54% 25% Central Proved Reserves Western 39.9 MMBoe NGLs 19% Gas Oil 24% 57% Engineered Acreage NonEngineered Acreage…
  8. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 8
    Lonestars Inventory of Extended Reach Drilling Locations Engineered Locations by Lateral Length (perforated interval in feet) 10,000 10,000 9,000 9,000 8,000 8,000 7,000 7,000 6,000 6,000 Lateral Length (') 5,000…
  9. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 9
    The Value of Extended Reach Laterals in the Eagle Ford Surface & Facilities Drilling Pad Wellhead Equipment Separation Storage Compression 0.4 MM Gathering 0.4 MM Vertical + Angle Lateral 5,000 + 2,800 7,800 Drilling…
  10. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 10
    All Reserve Location Summary IRR All Locations by Rank 100% 90% 80% 70% 60% IRR% 50% 40% 30% 20% 10% 0% 1 6 11 16 21 26 31 36 41 46 51 56 61 66 71 76 81 86 91 96 101 106 111 116 121 126 131 Location…
  11. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 11
    GeoEngineered Completion Alliance with SLB Integrated Approach to Drilling, Completion, Stimulation & Production of Eagle Ford Laterals Technical Process Application Experience Vertical Pilot Logs Used To Select Geotarget to Optimize…
  12. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 12
    Asset Detail
  13. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 13
    Western Region Summary Overview (as of 9/30/16) Lonestars Properties & Offset Wells Gross Leasehold 15,208 Net Leasehold 13,413 % HBP 90% Engineered Acreage Top EFS 6,000' to 9,250' NonEngineered Acreage Lateral Lengths 5,200'…
  14. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 14
    Technology Advancements Beall Ranch Beall Ranch Locator Map Beall Ranch Eagle Ford Well Costs Per Foot 1,400 Average Well Cost Per Lateral Foot (/ft) 1,200 1,000 800 600 26-28H 32-34H 400 200 20-22H 0 32H34H 26H28H…
  15. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 15
    Technology Advancements Horned Frog Horned Frog Locator Map Horned Frog Eagle Ford Offset 30Day IP 1,600 1,500 E1H A1H Proppant Concentration (/ft) D1H B1H 1,400 1,300 1,200 1,100 1,000 900 800 700 600 0 200 400 600…
  16. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 16
    LaSalle County Performance Update Burns Ranch Burns Ranch Leasehold Acquisitions Burns Ranch Area Summary In 5 different transactions, Lonestar assembled 4,013 net acres on its Burns Ranch LONE has grown its leasehold property at a…
  17. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 17
    Central Region Summary Overview (as of 9/30/16) Lonestars Properties & Offset Wells Gross Leasehold 13,170 Engineered Acreage Net Leasehold 12,481 Cyclone NonEngineered Acreage % HBP 53% Top EFS 6,000' to 9,500' Lateral Lengths…
  18. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 18
    Gonzales County Performance Update Cyclone Cyclone Area Summary Cyclone Leasehold September 30, 2016 Seeking to build on the success of its neighboring Harvey Johnson wells, Lonestar Leased initially leased 1,450 gross acres in…
  19. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 19
    Eastern Region Summary Overview (as of 9/30/16) Lonestars Properties & Offset Wells Gross Leasehold 14,935 Engineered Acreage Net Leasehold 10,891 NonEngineered Acreage % HBP 45% Top EFS 6,500' to 12,000' Lateral Lengths 5,200'…
  20. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 20
    Financial Overview
  21. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 21
    Lonestars Financial Transition December 2015: Lonestar agrees to a joint venture with Schlumberger to improve to Drilling, Completion, Late Stimulation & Production of Eagle Ford Laterals 2015 February 25, 2016: Lonestar announces a…
  22. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 22
    2017 Capital Expenditure Budget Lonestars 2017 capital expenditure plan calls for the drilling of 12 net wells and investing between 62 and 72 million Focus of the 2017 budget will be in Western and Central areas Lonestar has…
  23. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 23
    Lonestar Highlights Core Eagle Ford 36,785 net acre Eagle Ford position which is 100% operated with an average WI of 85% Position with Substantial derisked drilling inventory: 143 net potential locations including 54 PUD locations…
  24. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 24
    Appendix
  25. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 25
    1 RECYCLE RATIO FINDING & DEVELOPMENT COST (/BOE) 10 15 20 25 30 35 40 0 5 0.0x 1.0x 2.0x 3.0x 4.0x 5.0x 6.0x PDCE AR SYRG EQT AR UPL CLR PDCE AREX RRC REI COG UPL REXX LNREF RICE NOG AREX EGN GST…
  26. January 2017 Investor Presentation – Lonestar Resources Ltd. – slide 26
    Lonestars Footprint Across The Eagle Ford Is Significant 14 12 10 Counties With Completions 8 6 4 2 0 27

From the store

Browse maps, data & reports in the Shale Experts store