2016 Highlights Driven by Prior Investments Multizone, contiguous acreage position enabling development efficiencies 2016 average completed lateral length of 10,000 driving higher rates of return Data powering the multivariate Earth…
New UWC & MWC 1.3 MMBOE Cumulative Production Type Curve 1.3 MMBOE Cumulative Production Type Curve 600 Cumulative Production (MBOE) 500 400 1.3 MMBOE (New Reference Curve 300 as of 2/15/17) 200 100 0 12 Months 24…
YE16 Proved Reserves Reserves 200 24.9 0.5 Total Proved Reserves (MMBOE) 167.1 34.1 ( ) PUD 18.1 150 16% 125.7 100 PDP 84% 50 0 YE 2015 Revisions Additions Acquisition Production YE 2016 Minimizing PUD…
Capitalizing on Contiguous Acreage Position 141,303 gross/124,654 net acres1 The company has identified 2,000 locations that support lateral lengths of 10,000+ feet on its contiguous acreage The expected average lateral length for…
Drilling Efficiencies Drive Lower Well Costs Drilled Lateral Footage per Rig per Year 2017E 175 2016 166 2015 125 2014 88 2013 76 0 20 40 60 80 100 120 140 160 180 200 Thousand Lateral Feet Drilled per Rig per Year…
Economic Benefits of Longer Laterals Proved Developed Finding & Development Costs 12 9.70 10 PD F&D (/BOE) 8 7.56 6.26 6 4 2 0 3x 5,000' wells 2x 7,500' wells 1x 15,000' well Rate of Return (%) 60% 50% Rate of…
Laredos Technology Workflow Actions Results Predicted Well Role of Interference Technology & Performance Optimized Completions Ranked Zones Integration Analysis Optimized Well Spacing Ranked Wells Frac Modeling Optimized…
Evolving Beyond the Earth Model 2015 2016 2017 Project duration 1218 months 612 months 24 weeks LPI acreage coverage 50% 80% 100% & offset acreage zones 2 4 5 Focus Seismic Inversion Expanded attributes Improved data Completions…
Earth Model and Completion Optimization Benefits Wells utilizing the Earth Model and optimized completions have performed at an average of 136% of 1.3 MMBOE Type Curve1 350 36% Uplift vs 1.3 MMBOE 300 Type Curve through Earth…
Multivariate Earth Model Enhancing Production Upper Wolfcamp Middle Wolfcamp 350 350 Cumulative Production (MBOE) Cumulative Production (MBOE) 300 300 250 250 1.3 MMBOE 1.3 MMBOE 200 200 (New Reference Curve (New Reference…
Latest Optimization Tests Significantly Exceeding Type Curve 200 Outperformance of 35% to 1.3 MMBOE 180 type curve is expected to increase as the impacts of managed pressure 1.3 MMBOE Average Cumulative Production (MBOE) 160…
2017 Budget Expectations 2017 Capital Budget 1 530 MM 2017 Drilling & Completions 450 Operating 4 Hz rigs 80 Drilling and completing 70 Hz wells 85% targeting the UWC & MWC 95% average working interest Hz wells average 10,000…
Consistent Production Growth Anticipate 2017 production growth of 15% 60 50 Production1,2 (MBOE/d) 40 30 20 10 0 2011 2012 2013 2014 2015 2016 2017E Actual Estimate 1 Production numbers prior to 2014 have…
Prior Investment in Infrastructure Providing Tangible Benefits 5.5 MM total realized benefits in 4Q161 24 MM total benefits for FY161 195 horizontal wells served by production corridors with potential for 2,500 more2 In 4Q16,…
Corridor Financial Benefits 1.3 MM benefit over life of each 10,000 corridor well, with 25% of the benefit received in the first six months1 Water Oil Gas 2016 Benefits 2017 Benefits LMS Service Actual ( MM) Estimated (…
Significant Benefits through Water Infrastructure Investments Water infrastructure consists of: 78 miles of total water gathering pipelines Recycling plant capable of processing 30,000 BWPD Linked water storage assets with 5 MMBW…
Produced Water Takeaway Capital and LOE Savings 11.3 MMBW (61%) of total 2016 produced water was gathered on pipe Expected to increase to 75% in 2017 6.3 MMBW (34%) of total 2016 produced water was recycled by LMS Expected to…
MedallionMidland Basin System Medallion Midland Basin System1 YE15 YE16 Throughput (MBOPD) 67.6 134.3 Miles of Pipeline 460 6502 System Deliverability 125 550 (MBOPD) of AMI or Firm 1.8 MM 2.0 MM Commitment Acres of…
MedallionMidland Basin: The Premier Pipeline in the Permian Current Oil Production per Square Mile (Bbl/d) Medallions Delivered Volumes 160 0 200 400 600 800 1,000 1,200+ 140 0.54/Bbl EBITDA net to LPI in 4Q161 Volumes (MBOPD)…
Maintaining Strong Financial Position Historical Oil Price and Net Debt to Adjusted EBITDA 75 6.0 Net Debt to TTM Adj. EBITDA Proactively maintaining leverage ratio despite a 33% drop in WTI prices from 4Q14 to 4Q16 5.0 WTI…
Disciplined Hedging Program Oil Hedges Natural Gas Hedges 100% 100% 90% 90% 80% 80% Hedging 70% 70% program % Natural Gas Hedged1 provides price % Oil Hedged1 60% 60% 50% 50% protection 40% 40% while…
2017 Guidance 1Q17 2Q17 Production (MBOE/d)... 52 54 55 58 Product % of total production: Crude oil.. 44% 46% 45% 47% Natural gas liquids...... 27% 28% * Natural gas.... 27% 28% * Price Realizations (prehedge): Crude oil (% of…
Appendix
Oil, Natural Gas & Natural Gas Liquids Hedges OIL1 2017 2018 Puts: Hedged volume (Bbls) 1,049,375 1,049,375 Weighted average price (/Bbl) 60.00 60.00 Swaps: Hedged volume (Bbls) 2,007,500 1,095,000 Weighted average price (/Bbl)…
Hydraulic Fracture Test Site (HFTS) 23.1 MM highprofile, jointindustry project led InProgress by Laredo and the Gas Technology Institute (GTI) Key Initiatives 3 Complete Slant Well Fracture & Proppant Analysis Laredos Project…
Drilling & Completion Costs 10 10,000 D&C Capital Savings1 Efficiency gains partially 9 offset recent increases in 1,800 lb/ft D&C Capital Per Well ( MM) 8 service costs 7 D&C capital includes: 6 1 MM for 1,800 lb/ft…
2014 TwoStream to ThreeStream Conversions 1Q14 2Q14 3Q14 4Q14 FY14 Production (2Stream) MBOE 2,434 2,607 3,033 3,655 11,729 Production BOE/D 27,041 28,653 32,970 39,722 32,134 % oil 58% 58% 59% 60% 59% Production (3Stream) MBOE…