2016 Highlights Grew production 11% in 2016 and funded drilling program with operating cash flow Increased proved developed reserves organically by approximately 40% at a PD F&D cost of 5.12 per BOE Reduced LOE 37% during 2016…
Prior Investments Creating Value Multi-zone, contiguous acreage position enabling development efficiencies 2016 average completed lateral length of 10,000 driving higher rates of return Data powering the multivariate Earth Model…
Capitalizing on Contiguous Acreage Position 141,303 gross/124,654 net acres1 The company has identified 2,000 locations that support lateral lengths of 10,000+ feet on its contiguous acreage The expected average lateral length for…
Multiple Targeted Horizons Identified Primary targets Hz Wells Drilled Thickness OOIP1 Secondary targets Landing Points Clearfork Upper/Middle Spraberry Lower 4,500 gross ft. of prospective zones Spraberry 2 415 90 2-3…
Earth Model and Completion Optimization Benefits Wells utilizing the Earth Model and optimized completions have performed at an average of 136% of 1.3 MMBOE Type Curve1 350 36% Uplift vs 1.3 MMBOE 300 Type Curve through Earth Model…
Multivariate Earth Model Enhancing Production Upper Wolfcamp Middle Wolfcamp 350 350 Cumulative Production (MBOE) Cumulative Production (MBOE) 300 300 250 250 1.3 MMBOE 1.3 MMBOE 200 200 (New Reference Curve (New Reference…
Latest Optimization Tests Significantly Exceeding Type Curve 200 Outperformance of 35% to 1.3 MMBOE 180 type curve is expected to increase as the impacts of managed pressure 1.3 MMBOE Average Cumulative Production (MBOE) 160 35%…
New UWC & MWC 1.3 MMBOE Cumulative Production Type Curve 1.3 MMBOE Cumulative Production Type Curve 600 Cumulative Production (MBOE) 500 400 1.3 MMBOE (New Reference Curve 300 as of 2/15/17) 200 100 0 12 Months 24 Months…
2017 Budget Expectations 2017 Capital Budget 1 530 MM 2017 Drilling & Completions 450 MM Operating 4 Hz rigs 80 MM Drilling and completing 70 Hz wells 85% targeting the UWC & MWC 95% average working interest Hz wells average…
Consistent Production Growth Anticipate 2017 production growth of 15% 60 50 Production1,2 (MBOE/d) 40 30 20 10 0 2011 2012 2013 2014 2015 2016 2017E Actual Estimate 1 Production numbers prior to 2014 have…
Prior Investment in Infrastructure Providing Tangible Benefits 5.5 MM total realized benefits from infield infrastructure in 4Q-161 24 MM total benefits for FY-161 195 horizontal wells served by production corridors with…
Corridor Financial Benefits 1.3 MM benefit over life of each 10,000 corridor well, with 25% of the benefit received in the first six months1 Water Oil Gas 2016 Benefits 2017 Benefits LMS Service Actual ( MM) Estimated ( MM)1…
Significant Benefits through Water Infrastructure Investments Water infrastructure consists of: 78 miles of total water gathering pipelines Recycling plant capable of processing 30,000 BWPD Linked water storage assets with 5 MMBW…
Water Infrastructure Capital and LOE Savings 11.3 MMBW (61%) of total 2016 produced water was gathered on pipe Expected to increase to 75% in 2017 6.3 MMBW (34%) of total 2016 produced water was recycled by LMS Expected to increase…
LMS Crude Gathering System Benefits 44 miles of crude oil gathering lines 7.4 MMBO (64%) of gross operated production in 2016 was gathered on pipe Eliminated 41,000 truckloads of oil in 2016 Reduces time from production to sales…
Medallion-Midland Basin System Medallion - Midland Basin System1 YE-15 YE-16 Throughput (MBOPD) 67.6 134.3 Miles of Pipeline 460 6502 System Deliverability 125 550 (MBOPD) of AMI or Firm 1.8 MM 2.0 MM Commitment Acres of…
Medallion-Midland Basin System Scale Majority of system is large-diameter pipe to multiple delivery points 16-inch line to Midland delivery point with 200,000 BOPD capacity 12-inch line to Colorado City delivery point with 150,000…
Medallion-Midland Basin: The Premier Pipeline in the Permian Current Oil Production per Square Mile (Bbl/d) Medallions Delivered Volumes 160 0 200 400 600 800 1,000 1,200+ 0.54/Bbl EBITDA net to LPI in 4Q-161 140 Volumes (MBOPD)…
Maintaining Strong Financial Position Historical Oil Price and Net Debt to Adjusted EBITDA 75 6.0 Net Debt to TTM Adj. EBITDA Proactively maintaining leverage ratio despite a 33% drop in WTI prices from 4Q-14 to 4Q-16 5.0 WTI…
Disciplined Hedging Program Oil Hedges Natural Gas Hedges 100% 100% 90% 90% 80% 80% Hedging 70% 70% program % Natural Gas Hedged1 provides price % Oil Hedged1 60% 60% 50% 50% protection 40% 40% while retaining…
YE-16 Proved Reserves Reserves 200 24.9 0.5 Total Proved Reserves (MMBOE) 167.1 34.1 (18.1) PUD 150 16% 125.7 100 PDP 84% 50 0 YE 2015 Revisions1 Additions Acquisition Production YE 2016 Grew proved developed…
Oil, Natural Gas & Natural Gas Liquids Hedges OIL1 2017 2018 Puts: Hedged volume (Bbls) 1,049,375 1,049,375 Weighted average price (/Bbl) 60.00 60.00 Swaps: Hedged volume (Bbls) 2,007,500 1,095,000 Weighted average price (/Bbl)…
Hydraulic Fracture Test Site (HFTS) 23.1 MM high-profile, joint-industry project led In-Progress by Laredo and the Gas Technology Institute (GTI) Key Initiatives Complete Slant Well Fracture & Proppant Analysis Laredos Project…
Drilling & Completion Costs 10 10,000 D&C Capital Savings 1 Efficiency gains partially 9 offset recent increases in 1,800 lb/ft D&C Capital Per Well ( MM) 8 service costs 7 D&C capital includes: 6 1 MM for 1,800 lb/ft sand…