Scotia Howard Weil 2017 Energy Conference March 28, 2017 1
Who is Cimarex Market cap... 12.6B Debt/Adj. EBITDA1 2.5x Production (4Q16) 960 MMcfe/d Proved reserves. 2.9 Tcfe % Natural gas 51% % Proved developed 79% R/P Ratio... 8.2x Quarterly dividend of 0.08/share 1 December 31,…
Whats Important Returns drive decisions Balanced portfolio of assets Premier position in the Delaware Basin and Mid-Con region Flexibility through commodity cycles Idea generation and track record of strong execution Strong…
2017 Capital Plans Drilling & Completion Capital (millions) 2017 E&D Capital estimated 1,531 to be 1.1 1.2 billion Up 56% from 2016 level 1,251 Includes D&C capital of 850- 25% 900mm 76% of E&D capital 875 Generates 10-15%…
2017 Drilling & Completion Capital Drilling & Completion Capital 850-900 million 850-900 million 2/3 Permian; 1/3 Mid-Con 330mm of drilling will hold acreage Multiple projects & zones Delaware Basin Wolfcamp delineation & infill…
2017 Well Completions by Quarter 47 31 27 19 20 1Q 2Q 3Q 4Q Wells Drilling & WOC at Permian Basin Mid-Continent 12/31/17 10 10
Completion Evolution Continues Pounds of Sand per Lateral Foot J an. '15 J uly '15 J an. '16 J uly '16 J an. '17 C ulbers on Upper Wolfcamp 1,250 1,650 1,650 2,500 2,500 C ulbers on Lower Wolfcamp 1,250 1,250 1,250 2,400 2,500 R…
Biggest Opportunity - Delaware Basin Wolfcamp 190,000 net acres in the fairway Multiple Wolfcamp Targets Culberson/White City Area 100,000+ net acres Upper & Lower Wolfcamp JDA with Chevron Reeves County 62,000 net acres Upper…
Culberson Area Wolfcamp Details 100,000+ net 100,000+ netacres; acresJDA with Chevron in Culberson County 2013 main objectives 21 Lower Wolfcamp long Drilling to hold acreage laterals producing Wolfcamp C & D 21 Upper Wolfcamp…
Long Lateral Performance Culberson Lower Wolfcamp Sixteen 10,000-foot laterals 700 Cumulative Production Average 30-day peak IP of (MBOE) 115% 2,316 BOE/d (25% oil; 45% 600 Increase gas; 30% NGL) Flying Ebony 500 Average 30-day…
Improving Upper Wolfcamp Completion Design Culberson County Seven 10,000-ft. laterals Cumulative Production (MBOE) 18% Increase completed to date 600 Wells with new frac have 1,650+ lb/ft of sand 500 30-day peak IP of 2,097 BOE/d…
Culberson County Upper Wolfcamp Pilot 250 Extrapolated Average Cumulative Production per well Similar per-well results with (MBOE) 200 6 or 8 wells per section Next step: tighter spacing 150 12 wells per section Stack/Stagger…
Reeves County Focus Area Targeting Upper Wolfcamp 14 long laterals producing Average 30-day peak IP of 1,645 Cabinet State BOE/d (50% oil; 28% gas; 22% NGL) Best wells to date 10k-ft: Big Timber has avg. 30-day peak IP of 3,309…
Bigger Completion Improves Avalon Results Lea County 13,700 net acres 250 Cumulative Production Current inventory of 250 (MBOE) 119% Increase locations Includes Avalon and Leonard 200 Assumes 8 wells per section Plans to test 12…
Mid-Continent Overview Meramec and Woodford Stacked Targets Meramec: 116,500 net prospective acres 90,000 derisked Woodford: 136,500 net undeveloped acres (88% HBP) Meramec play outline Woodford play outline Cana core…
Meramec: The Big Picture 24-5,000-ft laterals have avg. Peterson 30-day peak IP of 1,417 BOE/d 34% oil; 43% gas; 23% NGL Nine 10,000-ft laterals have avg. 30-day peak IP of 2,057 BOE/d Sims 43% oil; 37% gas; 20% NGL Oil yield…
Meramec Long Lateral Performance 47% uplift after 180 days 300 Cumulative Production Nine 10,000-ft laterals have 30- (MBOE) day peak IP of 2,057 BOE/d 250 43% oil; 37% gas; 20% NGL Oil yields range from 37 to 523 200 Bbl/MMcf 47%…
Meramec Spacing Pilots Stacked/Staggered Pilot Meramec Eight total wells Four Meramec wells Osage Stacked/staggered spacing Testing 10 wells per section Four Woodford wells Testing nine wells per section Woodford Flowing back 16…
Woodford Shale Activity Cana-Woodford Activity Map Long history of activity Participated in 880 gross wells since 2007 Eastern core infill underway Operated Well Non-operated Well Six sections; two operated 47 gross (22 net)…
Woodford Increased Density Spacing Pilots Testing 16 & 20 wells per 16 wells/section 264 20 wells/section section Woodford 80 Eight well test 4 wells tests 16 wells/section 330 5 wells testing 20 wells/section Two rigs…
Woodford: Completion Evolution Continues Cumulative Production Armacost section developed using larger completion 2,400 Per Well Average (MMcfe) Per well production in-line with earlier sections 2,000 Tighter spacing means more…
Well-positioned for 2017 and Beyond Diverse asset portfolio with solid returns Strong financial position Debt to total cap of 39% 653 million of cash on the balance sheet at 12/31/16 Investment grade rating with stable outlook at…
Appendix 28 28
2017 Guidance 2017 Production, Unit Expense and Capital Guidance F irs t Quarter F ull-Year P roduc tion T otal E quivalent (B cfe/d) 1.01 - 1.05 1.06 - 1.110 % Gas 47% 45% C apital E xpenditures 1.1 - 1.2 billion E xpens es…
Hedges 2017 2018 Average First Second Third Fourth First Oil: Quarter Quarter Quarter Quarter Quarter WTI Oil Collars (1) Volume (Bbl/d) 20,000 20,000 16,000 11,000 6,000 14,602 Wtd Avg Floor Purchased (put) 43.08 43.08 45.09 46.27…
Hedge Strategy Hedged Volumes as of 12/31/16 Target volume is 50% of oil MMcfe/d and 50% of gas production 350 Methodical approach 300 Five quarter duration Bias toward costless collars 250 Downside protection 200 Some upside price…
Permian Region Provides Multiple Opportunities Multiple projects/multiple zones Wolfcamp shale (oil & gas) Bone Spring sands (oil) Avalon Shale (oil window) 2016 Focus Wolfcamp Long Laterals Meeting acreage obligations 34
Culberson County Tim Tam Infill Development First Lower Wolfcamp Infill Five 10,000-foot laterals Testing six wells per two-section unit Staggered well pattern Flowing back D Barbaro Lower Wolfcamp Tim Tam 878 878…
Non-GAAP Reconciliation Reconciliation of Net Income to EBITDA and Adjusted EBITDA1 ( in Millions) 2013 2014 2015 2016 Net income (loss) 565 507 (2,409) (431) Income tax expense (benefit) 329 299 (1,373) (227) Interest expense,…
Non-GAAP Reconciliation Reconciliation of cash flow from operations1 Debt/Cap Calculation2 Three months Dec. 31, Ended Dec. 31, 2016 2016 2015 (in millions) (in millions) Long-term debt (principal) 1,500 Net cash provided by…
Upsized Frac Improves Second Bone Spring Results White City 5,000-ft lateral 200 Cumulative Production (MBOE) Focus Area 180 160 140 70% Increase 120 100 80 60 15 stages from nine 100 locations identified 40 First 7,000…