Skip to main content Enercom The Oil and Gas Conference – Sundance Energy Australia Limited Investor Presentation | Shale Experts
Loading...

Enercom The Oil and Gas Conference – Sundance Energy Australia Limited

Sundance Energy Australia Limited · Aug 15, 2017 · 18 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 1
    EnerCom Conference August 2017 1 www.sundanceenergy.net
  2. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 2
    Executive Summary 43,800 acre core position in the western Eagle Ford Dimmit Position McMullen/Live Oak/Atascosa Position Targeting: Eagle Ford Targeting: Eagle Ford Net acres: 19,000 Net acres: 24,800 Gross operated wells…
  3. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 3
    Evolution In The Eagle Ford Building Critical Mass 2013 2014 2015 Oil Window Oil Window Oil Window Volatile Oil & Volatile Oil & Volatile Oil & Condensate Window Condensate Window Condensate Window Dry Gas Window Dry Gas Window…
  4. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 4
    Sundance Overview Company Strategy Pure play Eagle Ford aggregator Eagle Ford position has grown to 43,800 net acres since entering basin in 2013 Continue upgrading inventory by aggregating assets with returns in the top half of…
  5. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 5
    2017 Development Plan 12 of 14 net wells in McMullen Area 12.0 50.0 45.0 10.0 40.0 35.0 Capex millions Drilling completed for 2017 8.0 30.0 Net Wells 6.0 25.0 Teal-Hoskins and Liberstat pad completions finished with…
  6. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 6
    2017 Development Plan 14 net well IPs drive production growth 10,000 8,000 Q2 increased to 6,600 boe/d. 6,000 boe/d 4,000 Q3 production growth driven by 6 net well IPs in July 2017 2,000 Production mix 70% oil/12%…
  7. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 7
    2017 Development Plan YTD well results significantly outperforming type curves Atascosa 2016 - 2017 - CUM OIL Performance Dimmit 2016 - 2017 - CUM OIL Performance 15 10 12 8 Normalized CUM OIL , bo/ft Normalized CUM OIL ,…
  8. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 8
    2017 Development Plan YTD well results significantly outperforming type curves McMullen AREA 4 TC 2017 Drilling - CUM OIL Performance McMullen AREA 3 N-S TC 2017 Drilling - CUM OIL Performance 18 8 Early results show a similar…
  9. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 9
    2017 Development Plan Cost structure 35.00 30.23 29.77 30.00 24.27 25.00 F&D cost increase due to higher costs on new frac design per boe modeled against recoveries from old designs 20.00 15.00 10.00 Production growth…
  10. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 10
    Overview of Vitol Revenue Advance Facility Key Benefits / Features 30MM revenue advance repaid through delivery of oil production Addresses near-term liquidity constraints, allowing for execution of 2017 business plan Principal…
  11. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 11
    Balance Sheet & Hedges Net Debt millions 30 million net proceeds from Vitol Revenue Revolver debt 67.0 Advance entered in July 2017 Term debt 125.0 Total Long Term Debt 192.0 Borrowing base re-affirmed after sale of OK assets with…
  12. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 12
    Asset Overview McMullen, Atascosa and Live Oak Counties Proven track-record of improving results Eagle Ford producing wells Sundance acreage 277 gross (233 net) remaining locations with 35 net SEA Non-Op acreage remaining refrac…
  13. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 13
    Asset Overview Dimmit County Upside in Large Contiguous Position Eagle Ford producing wells 260 gross (228 net) remaining locations with proven stagger stack development SEA acreage Shook EFS 11H 14 EGFD PDP wells IP: 742 boe/d…
  14. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 14
    Eagle Ford Inventory Analysis Remaining Drilling Locations(1) SEA Drilling Inventory 180 60 160 149 Gross 126 Net 50 132 Gross 140 128 Gross 128 Gross Net Present Value 10% Discount Break-Even Price (/bbl) 116 Net 107…
  15. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 15
    Summary 2017 Drilling program complete with 4 McMullen completions set for Q4 17 2017 Dimmit / McMullen results proving up economics on large scale inventory Enhanced completion designs resulting in some of our best wells to date…
  16. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 16
    Executive summary Management team Eric McCrady, Managing Director & CEO Eric was appointed CEO in April 2011 and Managing Director of the Board in November 2011. He served as CFO from June 2010 until becoming CEO. Eric has over 15…
  17. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 17
    Board of Directors Mike Hannell, Chairman 45 years experience in upstream and downstream petroleum industry. Previously held senior positions with Santos Ltd and Mobil Oil. Eric McCrady, Managing Director & CEO Previously CFO of…
  18. Enercom The Oil and Gas Conference – Sundance Energy Australia Limited – slide 18
    Hedge Summary HEDGE CONTRACTS (1) PRICING OIL Boe Bbl Per Day Floor Ceiling 2017 867,942 5,673 Bbls of oil hedged for 2017 49.26 53.55 2018 1,186,060 3,249 Bbls of oil hedged for 2018 49.55 54.40 2019 636,000 1,742 Bbls of oil…

From the store

Browse maps, data & reports in the Shale Experts store