Skip to main content August 2017 Investor Presentation – Solaris Oilfield Infrastructure, Inc. | Shale Experts
Loading...

August 2017 Investor Presentation – Solaris Oilfield Infrastructure, Inc.

Solaris Oilfield Infrastructure, Inc. · Aug 2, 2017 · 13 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. August 2017 Investor Presentation – Solaris Oilfield Infrastructure, Inc. – slide 1
    Investor Presentation August 2017
  2. August 2017 Investor Presentation – Solaris Oilfield Infrastructure, Inc. – slide 2
    Market Summary Ticker SOI Exchange New York Stock Exchange Share Price (1) 12.57 Diluted Shares Outstanding (2) 43.7 million Market Capitalization 550 million (1) As of August 2, 2017. (2) Includes Class A and Class B…
  3. August 2017 Investor Presentation – Solaris Oilfield Infrastructure, Inc. – slide 3
    Summary of August 2nd Press Release and Todays Prepared Remarks New Transloading Logistics Services Natural expansion through supply chain Long-term contract with major operator underpins launch of strategic expansion; increases…
  4. August 2017 Investor Presentation – Solaris Oilfield Infrastructure, Inc. – slide 4
    Kingfisher Facility Timeline August 2017 Commence Phase 1 Development and Construction (40 million of capital expenditures) Engineering and site January 2018 First Proppant Delivery preparation Rail-to-truck transloading August 2018…
  5. August 2017 Investor Presentation – Solaris Oilfield Infrastructure, Inc. – slide 5
    Kingfisher Facility Strategic Expansion into Transloading Logistics Development of a New High-Capacity Transload Facility Long-Term Contract with Leading STACK E&P Operator The first independent, high-speed, unit-train capable…
  6. August 2017 Investor Presentation – Solaris Oilfield Infrastructure, Inc. – slide 6
    Growth Driven by Secular Trends Solaris facilitates increased per well and ...Yet uniquely positioned to capitalize on an industry wide proppant consumption levels... oversupplied sand market Innovate logistics solutions that save…
  7. August 2017 Investor Presentation – Solaris Oilfield Infrastructure, Inc. – slide 7
    Leading Independent Provider of Proppant Logistics Solutions Mobile Fleet Active in Key Basins Well Site Systems Marcellus / Utica Mobile Proppant Management Systems addresses System 1 (2%) challenges related to the transportation,…
  8. August 2017 Investor Presentation – Solaris Oilfield Infrastructure, Inc. – slide 8
    Framing Solaris Market Opportunity Market Share Based on U.S. Frac Fleet Size Historical Current…
  9. August 2017 Investor Presentation – Solaris Oilfield Infrastructure, Inc. – slide 9
    Proppant Demand Continues to Increase New U.S. Horizontal Wells(1) Recovering commodity prices have driven increased drilling and completion activity 23.7 20.2 E&P operators have increasingly focused on using larger 16.0 15.8…
  10. August 2017 Investor Presentation – Solaris Oilfield Infrastructure, Inc. – slide 10
    Proppant Logistics are Complex and Prone to Bottlenecks Illustrative 20 Million lb. Completion Requirements 10,000 tons of sand Proppant mined and stored in mine storage (silos or domes) SAND MINE 100 railcars Proppant loaded…
  11. August 2017 Investor Presentation – Solaris Oilfield Infrastructure, Inc. – slide 11
    Bringing Order to Chaos Issues with Traditional Offerings Inadequate on-site inventory and offloading Traditional Rolling capacity Sand Kings Storage Complicated operations and expansive well site footprint Opaque inventory…
  12. August 2017 Investor Presentation – Solaris Oilfield Infrastructure, Inc. – slide 12
    Elegant Solution to a Complicated Problem High Capacity Throughput Simple, modern, fully-integrated control system High volume input and output capacity Mobile and flexible equipment Supply Chain Savings Well Site Savings…
  13. August 2017 Investor Presentation – Solaris Oilfield Infrastructure, Inc. – slide 13
    Scalable, Vertically Integrated Manufacturing Capability Manufacturing Facility Overview Facility Footprint Over 100,000 square feet of covered manufacturing facility on 10.8 acre lot in Early, Texas Centrally located to Permian,…

From the store

Browse maps, data & reports in the Shale Experts store