2 Current Status Nov 2017 Production Overview Current production 255,000-265,000 boepd 2017 average production forecast of 240,000-250,000 boepd (approx. 30% annual growth) Current liquid production 42,000 bpd 2017 Exit…
3 Historical EP Performance Mar 2017 Production Growth Per Share* Reserves Growth Per Share* 350 7 Production per Thousand Shares Reserves per Share (BOEs) 300 6 250 5 200 4 (BOEs) 150 3 100 2 50 1 0 0 2009 2010…
4 A History of Full Cycle Profitability Sep 2017 400 6.00 350 * Earnings before taxes (000,000s) 5.00 Earnings before tax ( millions) AECO (CAD/mcf) 300 4.00 250 AECO (/mcf) 200 3.00 150 2.00 100 1.00…
5 Largest Canadian Gas Producers Nov 2017 1,800 2016A Natural Gas (Mmcf/d) 1,600 2017E Natural Gas (Mmcf/d) 1,400 2018E Natural Gas (Mmcf/d) 1,200 Production (Mmcf/d) Tourmaline is currently producing 1,000 between…
6 A Significant Liquids Producer Oct 2017 Tourmaline has doubled liquids production over the past 15 months with strong liquids growth across all three operated complexes. Condensate production will grow from current levels of 12,000…
7 Alberta Deep Basin Nov 2017 T65 R9 R7 R5 Current Production 175,000-180,000 boepd Current Reserves 871.9 mmboe (Jan 1, 2017) T63 Tourmaline Land Base 3,000 gross sections Drilling Inventory 2,819 locations (vertical) TCPL Main…
8 Top August Alberta Gas Wells Oct 2017 Source: NBF, geoSCOUT, Company Reports
9 Alberta Deep Basin 2H 2017 EP Highlights Sep 2017 T65 R7 R5 Kakwa 3 Well Pad 1-20-62-5W6M Tourmaline Lands 55mmcf/d and 270 bbls/d Cond. NE Alberta T63 Tourmaline Gas Plant BC TCPL Main Line Possible Facility Locations…
10 Alberta Deep Basin Liquids Rich Cardium Fairway Aug 2017 The combination of extensive 3D seismic coverage T59 T59 and the lowest cost drilling/completion capability Smoky make the liquids rich Cardium play a significant new…
NEBC Montney Gas Condensate and Peace 11 River High Charlie Lake Oil Core Areas Nov 2017 Current Prod. 90,000-95,000 boepd BC Montney In excess of 4,046 horizontal locations Drilling Inventory* BC Montney Reserves 766.5 mmboe (Jan…
12 NEBC Montney Gas/Condensate Complex Nov 2017 Black Swan Current Prod. 350-360 mmcf/d TOU Land Comp. Station, dehy C-60-A Gas Plant 25 mmcf/d 7,500-8,000 bpd condensate TOU Wells 200 MMCF/D Q4 2018 Current Reserves 766.5…
13 Gundy Ck Montney Development Oct 2017 Drilling Execution Efficiency Black Swan Gundy 2013 - Comp. Station, dehy Current Production: 11,318 boepd (Oct 2017) 25 mmcf/d Current Plan 2014 No of wells drilled by TOU: 23 Days 10 14…
15 Peace River High Complex Charlie Lake Play Nov 2017 Mulligan 8-15 Upper Trcl Pad Q3 2016 R. 11 R. 9 5-14 R. 7Mulligan R. 5 90 day production rates Peace River High Charlie Lake Play 1-21: 285 bopd, 0.3 mmcf/d, 335 boepd Oil…
17 Tourmaline Mid-Stream Assets Sep 2017 The infrastructure skeleton in all three core operated complexes is now complete. This infrastructure is essentially R. 15W6 R. 1W6 all newR.and 15W5in the growth areas of the WCSB. NE…
19 Gas Development Location Inventory and Economics Mar 2017 AB Deep Basin Outer Foothills AB Deep Basin B.C. Montney Charlie Lake Vertical Vertical Horizontal Horizontal Horizontal Total Well Costs 3.3 4.80 4.40 2.90 2.4 (Drill,…
20 Completed Well Costs and EUR By N. American Play Type Aug 2017 Well Costs (CAD) Vs. EUR by Play Type 25 0.47/mcf Completed Well Cost CDN EUR (Bcfe) 20.5 Bcfe 0.69/mcf 20 17.9 Bcfe 15 0.70/mcf 12.3 MM 12.5 Bcfe…
21 Tourmaline vs Natural Gas Peers Cash Costs Per BOE July 2017 Tourmaline Vs. Natural Gas Weighted Peers Cash Costs in USD* per BOE (Q1/17) Operating Transportation G&A Interest 12.00 10.26 10.00 1.45 8.00 7.15 1.54 Costs…
22 The TOU Engineering Execution Machine Sep 2017 Drill & Complete Costs 8.00 Tourmaline has the lowest completed per stage (Equipping not included) well costs in the overall Montney play in 7.00 Western Canada and the Alberta…
Continuously Improving Well Performance 23 and Recoverable Reserves Oct 2017 2,000 1,750 Deep Basin 1,500 EUR 934 Mboe 1,250 47% EUR Increase Since 2012 IP 30 1,812 boe/d Boe/d 1,000 750 IP 90 1,334 boe/d 500 250 IP 365 700…
25 2018 Guidance Nov 2017 2018(1) Production Boe/d 270,000 - 280,000 Cash Flow - MM(i) 1,362 CFPS - Diluted(i) 5.04 E&P Capital Program - MM 1,082 Free Cash Flow - MM(ii) 251 Exit Net Debt - MM(i) 1,558 Debt to CF…
26 Current 5 Year Plan(1) Nov 2017 400,000 350,000 300,000 250,000 Spirit River Boe/d 200,000 NEBC 150,000 Deep Basin 100,000 50,000 - 2016 2017 2018 2019 2020 2021 2022 Annual After-tax After-tax E&P Capital Free…
27 2018 Natural Gas Transportation and Marketing Overview October 2017 2018 Natural Gas Portfolio Diversification 19% 10% 2018 Exit: 440 mmcf/d of gas will be to US/Other Markets 2019 Exit: 540 mmcf/d of gas will be to…
28 2H 2016 Highlights/2017 Outlook Nov 2017 Tourmaline now a senior with production exceeding the 250,000 boepd milestone. (30%+ annual growth) The Company reserves are now 1.75 billion boe (Jan 1, 2017). (60%+ annual growth)…
APPENDIX
30 Natural Gas Flows From Western Canada
31 Shell Acquisition Overview Oct 2016 A major step towards the ongoing plan to become Canadas and one of North Americas largest, most efficient, lowest cost and profitable natural gas producers. The acquisition provides a…
32 Underlying Natural Gas Fundamentals are Strong. Mar 2016 Supply/Demand fundamentals support a strong natural gas price recovery, the warm 2015/2016 winter has temporarily deferred this rally, to 2H 2016/Q1 2017. Natural Gas…
33 2017 EP Highlights, New Opportunities Feb 2017 R. 11W6 R. 1W6 R. 15W5 Lower Charlie Lake Regional Play 60 day IP of 344 bopd, 1.29 NE Alberta Inga mmcfpd. BC Montney 15 wells on-stream. Gundy Gas/Cond T85 Minimum 284…
34 2H 2017 Significant EP Activity, Step-Out Wells Aug/Sept 2017 Five-six horizontal follow-ups to the Anderson-Lambert-Hinton Cardium gas condensate discovery during the 2H 2017. 16-25 discovery well has now produced 2.3 bcf of…
35 Historical Drilling Performance and Cost Improvements Mar 2017 South Deep Basin Peace River High Average Drill Days Average Drill Cost Average Drill Days Average Drill Cost 3.0 35 57% 49% 20 41% 36% 5.0 2.5 30 Decrease…
36 Historical Completions Performance Improvements Deep Basin - Completions Peace River High - Completions 3,000 3,500 47% 3,000 72% 2,500 Decrease Since 2012 Decrease Since 2012 2,500 2,000 2,000 000 000 1,500 1,500…
37 Tourmaline Vs. US Shale Plays (1) Apr 2016 Tourmaline Tourmaline Marcellus Shale Marcellus Shale Utica Alberta Deep Basin (2) B.C. Montney (2) Liquids Rich Drill, Case, Complete 3.6MM 2.5MM 8.2MM 8.2MM 12.8MM Costs (USD)…
38 Hedging Summary 2018 October 2017 2018 Gas Hedges Volume Weighted Avg Price (Jan Dec 2018) mcf/d /mcf(1) Fixed Price Hedges 253,454 Total fixed hedges(mcf/d) Fixed (CDN) (2) (3) 147,961 2.93 Nymex (less AECO diff) (US) 105,493…
40 EP Growth Plan (Original Business Plan) Sept 2008 This is essentially the same business plan that was executed for Duvernay Oil Corp. (2001-2008) Primary growth mechanism will be a conventional EP Program (including Resource…
41 Alberta Deep Basin Overview Aug 2016 The Alberta Deep Basin is the largest gas producing sub-basin in Western Canada, with current production of 3.2-3.3 bcf/day. The Alberta Deep Basin and the BC/Ab Montney are Canadas two…
42 Alberta Deep Basin: Wilrich Regional Resource Play Apr 2016 R. 9 R. 8 R. 7 R. 6 R. 5 R. 4 R. 3 R. 2 R.1W6M R26,W5M T. 64 T. 64 Kakwa 4-29 Kakwa 13-12/5-12 30 day IP T.20.2 63 mmcfpd 30 day IP 19.2 mmcfpd T. 63 Tourmaline…
Alberta Deep Basin: 43 Notikewin/Falher Hz Program Apr 2016 R. 9 R. 8 R. 7 R. 6 R. 5 R. 4 R. 3 R. 2 R.1W6M R26,W5M KakwaT. 649-17 Kakwa 1-7 T. 64 30 day IP 21.8 mmcfpd 30 day IP 16.4 mmcfpd T. 63 T. 63 T. 62 Wild R 3-9…
44 Banshee Alberta Gas Plant Simple, easy to construct dew point plants tied to the main TCPL sales system Total cost (2 phases) of 80M, capacity of 130 mmcfpd with enhanced liquids recovery capability
45 Tourmaline Environmental Performance Tourmaline strives to continually improve all aspects of environmental performance including the impact of its operations on air, land and water. Tourmaline ranks as a top decile performer…
46 BC Water Management 100% of all water flowed back from completion operations is recycled 90% of all water sourced for stimulation operations is recycled 187,000m3 of produced water storage capacity 3 produced water ponds…
47 Natural Gas Substitution in Operations Raw Natural Gas cost (Feb 2017) 0.10/DLE (Diesel Equivalent Liter) vs 0.69/L rack price for marked diesel 12 Drilling Rigs and all BC completion operations use a combination of NG/Diesel…
48 Tourmaline Technology Curve/Future Concepts, Requirements & Opportunities Cost saving via novel frac water sourcing/recycling Alternative hz frac programs/processes Concurrent pairs, delayed flow-backs etc. Novel drilling…
49 Capitalization to Date Insiders Public Total millions of shares Price* millions of shares Price* 2008 Financings Common shares 28.50 5.16 22.00 7.00 301.0 2008 Financings Flow through shares 1.25 10.00 1.25 10.00 25.0 2009…
50 Schedule A DRILLING LOCATIONS Estimated Drilling Inventory This presentation discloses drilling locations in four categories: (i) proved undeveloped locations; (ii) probable undeveloped locations; (iii) unbooked locations; and…
51 Schedule A continued Deep Basin Vertical well count : Approximately 2,746 gross prospective sections at approximately 1.5 wells per section minus 10% for areas that are inaccessible or limited by spacing requirements minus…