December 2017 Investor Presentation – Arc Resources Ltd.

Arc Resources Ltd. · Dec 1, 2017 · 84 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. December 2017 Investor Presentation – Arc Resources Ltd. – slide 1
  2. December 2017 Investor Presentation – Arc Resources Ltd. – slide 2
    Why Invest in ARC? A Differentiated Investment Financial Discipline High-quality Asset Portfolio Proven Execution and Development Model Operational and Organizational Excellence ? Sector-leading balance sheet ? Disciplined…
  3. December 2017 Investor Presentation – Arc Resources Ltd. – slide 3
    Corporate Profile Corporate Summary Production (Q3 2017) 129,526 boe/day Reserves (2P Gross ? YE 2016) (1) 737 MMboe Reserve Life Index (2P) (1)(2) 16.4 years Monthly Dividend $0.05 per share Annualized Returns since Inception (3)…
  4. December 2017 Investor Presentation – Arc Resources Ltd. – slide 4
    Q3 2017 Financial and Operating Highlights Financial Results ? Net income of $48.5 million ($0.14 per share) ? Funds from operations of $163.8 million ($0.46 per share) ? Strong financial position with net debt to annualized funds…
  5. December 2017 Investor Presentation – Arc Resources Ltd. – slide 5
    Our Plan 2017 Reduced the dividend Sold Saskatchewan assets Eliminated DRIP and SDP plans 118,000 boe per day 2018 Sustain Montney businesses Progress Sunrise Phase II Advance Attachie piloting activities 130,000 to…
  6. December 2017 Investor Presentation – Arc Resources Ltd. – slide 6
    2017 and 2018 Guidance Focused on Profitability and Long-term Value Creation 2017 Revised Guidance (1) 2017 YTD 2018 Guidance Production Crude oil (bbl/d) 25,000 - 27,000 24,291 25,000 - 27,000 Condensate (bbl/d) 5,000 - 5,500 5,199…
  7. December 2017 Investor Presentation – Arc Resources Ltd. – slide 7
    ARC?s History and Future In the past 20 years, ARC has successfully achieved the following: 20-year History Has Set the Stage for Another 20+ Years of Value Creation $6.1 Billion of Distributions / Dividends & 13% Annualized Total…
  8. December 2017 Investor Presentation – Arc Resources Ltd. – slide 8
    Consistent and Sustainable Strategy Delivering on Our Strategy of Risk-managed Value Creation Net Debt to Funds from Operations 1,600 Net Debt Funds From Operations ?Net Debt to Funds from Operations 1,200 :2 800 E 400 0 2.0…
  9. December 2017 Investor Presentation – Arc Resources Ltd. – slide 9
  10. December 2017 Investor Presentation – Arc Resources Ltd. – slide 10
    Operations DRIP/SDP Equity Proceeds Net A&D Proceeds ARC?s Funding Model ? Objective is to fully fund ARC?s dividend and sustaining capital with funds from operations over the long term ? ARC will continue to review non-core…
  11. December 2017 Investor Presentation – Arc Resources Ltd. – slide 11
    Physical Marketing Strategy Ensuring Market Access at Optimal Netback Pricing Guiding Principles ? Proactively planning for future development opportunities ? Keep abreast of changing infrastructure environment Market Access ?…
  12. December 2017 Investor Presentation – Arc Resources Ltd. – slide 12
    49% 12% 38% 1% ARC?s Crude Oil & Condensate Production Mix Crude Oil & Condensate Marketing ? Continued focus on Montney assets has resulted in ARC?s production mix being primarily light and medium crude oil grades and condensate…
  13. December 2017 Investor Presentation – Arc Resources Ltd. – slide 13
    ARC Continues to Physically and Financially Diversify to Downstream Markets to Achieve Optimal Pricing ? Secured firm transportation pipeline agreements to support existing production and future development out beyond 2020 ? ARC\'s…
  14. December 2017 Investor Presentation – Arc Resources Ltd. – slide 14
    % of Total Production (1) Indicative 2017 YTD pricing and exchange rate of Cdn$/US$1.2524. (2) Transportation costs assume firm transportation rate as per current tariff and exclude fuel and applicable carbon and motor fuel tax. (3)…
  15. December 2017 Investor Presentation – Arc Resources Ltd. – slide 15
    Environmental, Social & Governance Performance ARC?s Leadership Culture Is Reflected in Its ESG Practices Recognitions and Rankings: ? MSCI Global Sustainability Index ? Jantzi Social Index ? CDP Participant for eight consecutive…
  16. December 2017 Investor Presentation – Arc Resources Ltd. – slide 16
  17. December 2017 Investor Presentation – Arc Resources Ltd. – slide 17
    2018 Budget of $690 Million Capital Budget Focuses on Overall Capital Efficiency and Profitability and Delivers Production of 130,000 to 134,000 boe per day Attachie $45MM ? 2 wells Advance towards commercialization with…
  18. December 2017 Investor Presentation – Arc Resources Ltd. – slide 18
    2018 Guidance Focused on Profitability and Long-term Value Creation $690 million Invest to drill 64 gross Allowing ARC to: While managing operating costs at $6.50 ? $6.90/boe Maintain Balance Sheet Strength Facilitate an Orderly…
  19. December 2017 Investor Presentation – Arc Resources Ltd. – slide 19
    Focused Asset Base Investing in Optionality in the Montney and Cardium BC AB Blueberry Red Creek Attachie Septimus Tower SunsetParkland Sunrise Dawson Pouce Coupe Ante Creek Northeast Sundown British Columbia Northern…
  20. December 2017 Investor Presentation – Arc Resources Ltd. – slide 20
    Proven Development Model Inventory at All Stages Allows for Self-funding and Full-cycle Returns across Portfolio Growth for Future Phase Development Phase Free Cash Flow Phase ? Exploration ? Appraisal / Piloting ? Geographic…
  21. December 2017 Investor Presentation – Arc Resources Ltd. – slide 21
    Oil and Liquids Dry Gas Blueberry Red Creek Attachie Septimus Tower Parkland Sunset Sunrise Sundown Dawson Pouce Coupe Ante Creek 1,000m 2,000m 3,000m 1,000m 2,000m Montney Erosional Edge Lower Montney 10 kPa/m…
  22. December 2017 Investor Presentation – Arc Resources Ltd. – slide 22
    Multiple Layers to Develop Significant Future Delineation Opportunities Attachie Septimus Sunrise Tower Parkland Dawson Pouce Coupe Montney A Montney B Montney C Montney D Montney E Existing Horizontal Wells, Development…
  23. December 2017 Investor Presentation – Arc Resources Ltd. – slide 23
    Increased Liquids Potential in the Lower Montney Strategic Appraisal Program from 2017 Has Unlocked a Tremendous Resource (1) (1) Only Lower Montney wells are displayed. 2017 Lower Montney Appraisal Program Area Drilling in 2017…
  24. December 2017 Investor Presentation – Arc Resources Ltd. – slide 24
    NE BC Montney Reserves and Risked Resources NE BC Montney TPIIP: 101.5 Tcf of Shale Gas and 10.5 Billion Barrels of Oil ? Independent Resources Evaluation conducted by GLJ effective December 31, 2016. ? Contingent Resource and…
  25. December 2017 Investor Presentation – Arc Resources Ltd. – slide 25
    Dawson Parkland / Tower Sunrise / Sunset Attachie Other Montney Number of Locations Total HZ Wells Drilled to YE2016 2P Booked Undeveloped Locations Development Pending ECR Booked Locations Development Unclarified ECR Booked Locations…
  26. December 2017 Investor Presentation – Arc Resources Ltd. – slide 26
    Montney Development Economics Strong Rates of Return Across the Montney Portfolio (1) IRR (half-cycle after-tax rate of return) run at US$50/bbl WTI and Cdn$2.50/GJ AECO flat pricing. (2) Breakeven prices are US$ per barrel WTI or Cdn$…
  27. December 2017 Investor Presentation – Arc Resources Ltd. – slide 27
    ? Significant drilling results and large inventory of future drilling locations provides support for favourable economics at Dawson Phase III, Sunrise Phase II, and Dawson Phase IV ? Sunrise Phase II economics have improved due to…
  28. December 2017 Investor Presentation – Arc Resources Ltd. – slide 28
    ARC Tower Oil Single Well Economics Capital/Well Cdn$4.8MM Canadian 2P Finding & Development Cdn$7.91/boe ARC Sunrise Gas Single Well Economics Capital/Well Cdn$5.2MM Canadian 2P Finding & Development Cdn$0.45/Mcfe Permian Oil…
  29. December 2017 Investor Presentation – Arc Resources Ltd. – slide 29
    Competing Continentally (1) Financial data from company reports. (2) Assumes exchange rate of Cdn$/US$1.3343 and US royalty rate of 25%. (3) Permian average includes: CPE, FANG, LPI, PE, PXD, RSPP. (4) Assumes exchange rate of…
  30. December 2017 Investor Presentation – Arc Resources Ltd. – slide 30
    Building Sustainable Businesses in the Montney Businesses Sustain Production and Generate Free Cash Flow at Low Reinvestment Rates 0 30,000 60,000 90,000 120,000 150,000 2009 Non-core Dispositions 2010 2011 2012 2013 2015 2015…
  31. December 2017 Investor Presentation – Arc Resources Ltd. – slide 31
    Montney Cash Flow Models ? ARC is investing in three infrastructure growth projects to grow production by ~40,000 to 50,000 boe/day over a 2.5-year period Next Three Growth Projects Will Contribute Significant Free Cash Flow Field…
  32. December 2017 Investor Presentation – Arc Resources Ltd. – slide 32
    ARC?s Strong Pipeline of Projects Depth of Portfolio Will Support Profitable Development in the Montney and the Cardium 2017 Montney Capital Efficiencies: ? Sustaining: ~$9,000/boe/day ? Gas Development: ~$6,500 to $9,000/boe/day ?…
  33. December 2017 Investor Presentation – Arc Resources Ltd. – slide 33
  34. December 2017 Investor Presentation – Arc Resources Ltd. – slide 34
    Production Profile Non-Montney Crude Oil & Liquids (bbl/day) Montney Crude Oil & Liquids (bbl/day) Non-Montney Natural Gas (boe/day) Montney Natural Gas (boe/day) Montney Assets Deliver Profitable Growth and Value Quality Assets and…
  35. December 2017 Investor Presentation – Arc Resources Ltd. – slide 35
    Three-Year FD&A Costs (2014 - 2016) (1)(2)(3) ($/boe) (1) Three-Year 2P FD&A Costs (2014 ? 2016) includes future development capital. Source: Peters & Co. ?E&P Overview Tables? March 27, 2017. (2) See ARC?s press release issued on…
  36. December 2017 Investor Presentation – Arc Resources Ltd. – slide 36
    Completion $/Tonne Completion Cost per Tonne in NE BC 0 400 800 1,200 1,600 2014 2015 2016 $/Lateral Foot Drilled Drilling Cost per Lateral Foot in NE BC 40% Reduction Continuous Improvement in Cost Structure ? Load-leveling…
  37. December 2017 Investor Presentation – Arc Resources Ltd. – slide 37
    Significant Reduction in Drilling Times ? Utilizing state of the art technology to improve performance and to increase efficiencies Applying Learnings across Portfolio for Reduced Drill Times and Cost Savings 0 1,000 2,000 3,000…
  38. December 2017 Investor Presentation – Arc Resources Ltd. – slide 38
    Montney Exploitation Approach Improves Efficiencies ARC Has Advanced Its Understanding of the Full-stack Development Potential for All Project Areas in Order to Execute Efficiently (1) Represents Sunrise full-stack model. Spacing and…
  39. December 2017 Investor Presentation – Arc Resources Ltd. – slide 39
    Investing in Learnings Applying Learnings across ARC?s Portfolio of Assets Integrating Learnings at All Stages of Development Further Our Understanding of the Asset Establish Project Sequencing Determine Well Designs…
  40. December 2017 Investor Presentation – Arc Resources Ltd. – slide 40
  41. December 2017 Investor Presentation – Arc Resources Ltd. – slide 41
    Key Projects Update Advancing Projects across ARC?s Portfolio Key Projects Update Sunrise ? FEED investments and initial earthwork at Sunrise Phase II; repatriate third-party volumes in 2019 ? Piloting fifth layer of development…
  42. December 2017 Investor Presentation – Arc Resources Ltd. – slide 42
    Sunrise/Sunset ? Asset Details Confidence in Predictability of Results Supports Magnitude of Resource and Next Stage of Development (1) Sunrise Phase II Gas Plant expansion includes 120 MMcf/day of incremental natural gas production…
  43. December 2017 Investor Presentation – Arc Resources Ltd. – slide 43
    Sunrise ? Multi-Layer Development Testing Four-layer Development in Upper Montney ? Strong Reservoir, Low Capital and Plant Costs ? Type curves are internal estimates based on analog wells and reservoir modeling. ? Assumed cycle time…
  44. December 2017 Investor Presentation – Arc Resources Ltd. – slide 44
    0 2,000 4,000 6,000 8,000 0 10 20 30 40 50 60 Cumulative Gas (MMcf) Months on Production Sunrise ? Proven Performance Results in Upper Montney Horizon Validate Type Curves ? Type curves are internal estimates based on analog…
  45. December 2017 Investor Presentation – Arc Resources Ltd. – slide 45
    Sunrise Phase II Expansion Significant Natural Gas Resource Base with High Well Deliverability and Strong Full-cycle Economics Sunrise Phase I 60 MMcf/day sales capacity Phase II sales and processing capacity increased to 180…
  46. December 2017 Investor Presentation – Arc Resources Ltd. – slide 46
    Dawson ? Asset Details Poised for Next Stage of Development at Dawson Phase IV (1) Dawson Phase III Gas Plant was started up in June 2017. The facility has 90 MMcf/day of gas processing and 7,500 bbl/day of liquids-handling capacity.…
  47. December 2017 Investor Presentation – Arc Resources Ltd. – slide 47
    Dawson ? Development Potential Significant Upside Remaining in Both Upper and Lower Montney Lower Montney 2P Reserves Booked as at December 31, 2016 Upper Montney Development Plan ARC Identified Drilling Locations ARC Wells ARC…
  48. December 2017 Investor Presentation – Arc Resources Ltd. – slide 48
    0 2,000 4,000 6,000 8,000 0 6 12 18 24 30 36 Production Rate (Mcf/day) Months on Production 24 to 32 bbl/MMcf * 5 bbl/MMcf Dawson ? Phase I & II vs. Phase III & IV New Area Development for Phase III ? Increased Liquids Content…
  49. December 2017 Investor Presentation – Arc Resources Ltd. – slide 49
    0 400 800 1,200 1,600 1 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Production Rate (boe/day) Months on Production Dawson-Parkland ? 2018 Lower Montney Development Key Metrics High Liquids Ratio…
  50. December 2017 Investor Presentation – Arc Resources Ltd. – slide 50
    Dawson-Parkland ? 2017 Lower Montney Results Strong Results from 2017 Lower Montney Appraisal Program Setting the Stage for 2018 Development Activities 0 250 500 750 1,000 1,250 1,500 0 50 100 150 200 250 300 Cumulative Gas…
  51. December 2017 Investor Presentation – Arc Resources Ltd. – slide 51
    Dawson Phase IV Sanctioning Leveraging Pre-investment in Dawson Phase III for Superior Capital Efficiencies in Dawson Phase IV Dawson Phase III Sanctioning Checklist Inventory High confidence Well Execution No concerns Facility…
  52. December 2017 Investor Presentation – Arc Resources Ltd. – slide 52
    (100) (50) 0 50 100 150 200 250 2010 2011 2012 2013 2014 2015 2016 MMcfe/day $ millions Dawson ? Sustainable Cash Flow Model Low Reinvestment Ratio to Maintain Significant Free Cash Flow $3.91 $3.48 $2.28 $3.00 $4.19 $2.62…
  53. December 2017 Investor Presentation – Arc Resources Ltd. – slide 53
    Parkland/Tower ? Asset Details Building a Profitable Business Parkland Tower Net Production (boe/day) ? Q3 2017 9,870 19,170 Liquids (bbl/day) 2,460 10,130 Gas (MMcf/day) 44 54 Land (Montney Net Sections) 37 57 Working Interest…
  54. December 2017 Investor Presentation – Arc Resources Ltd. – slide 54
    0 1,500 3,000 4,500 6,000 0 5 10 15 20 25 30 35 40 Gas Production Rate (Mcf/day) Months on Production Parkland ? 2018 Upper Montney Development Liquids-rich Natural Gas Wells to Complement Tower Development Key Metrics 2018 Type…
  55. December 2017 Investor Presentation – Arc Resources Ltd. – slide 55
    Tower ? Strong Oil Production Industry-leading Oil Well Asset ? Type curves are internal estimates based on analog wells and reservoir modeling. ? Assumed cycle time (from spud to on-production): five months. ? Lateral length of 1,750…
  56. December 2017 Investor Presentation – Arc Resources Ltd. – slide 56
    0 25 50 75 100 125 150 0 100 200 300 400 500 600 Cumulative Oil & Condensate Production (Mbbl) Days on Production Attachie 4-20 Attachie 13-14 Tower 7-12 West Tower 12-16 East Tower & Attachie ? Integrated Learnings…
  57. December 2017 Investor Presentation – Arc Resources Ltd. – slide 57
    Taking Next Steps Forward at Attachie West Attachie West ? Six pilot wells are on production through third-party facilities ? Building on strong results, an additional five wells will be drilled in Q4 2017, including one Lower…
  58. December 2017 Investor Presentation – Arc Resources Ltd. – slide 58
    Multi-layer Development Potential Journey to Commercial Development Single-well Appraisals 2014 to 2017 Applying Learnings Multi-well Pad 2017 to 2018 Commercial Development 2019 to 2020 Applying Learnings & TCPL North…
  59. December 2017 Investor Presentation – Arc Resources Ltd. – slide 59
    Ante Creek ? Asset Details Significant Cash Flow with Substantial Growth Opportunities Net Production (boe/day) ? Q3 2017 15,760 Liquids (bbl/day) 7,370 Gas (MMcf/day) 50 Production Split % (Liquids / Gas) 47% / 53% Land (Montney…
  60. December 2017 Investor Presentation – Arc Resources Ltd. – slide 60
    Ante Creek ? New Well Design New Well Design Is Delivering Upside Key Metrics 2018 Type Curve DCET Capex/Well ($ millions) 4.0 Internal 2P Reserves (Mboe) 600 IP (1 month) (boe/day) 490 IP (12 months) (boe/day) 330 Half-cycle…
  61. December 2017 Investor Presentation – Arc Resources Ltd. – slide 61
    Ante Creek ? Development Potential ? Large land base and down-spacing has resulted in significant drilling inventory ? Continued delineation of Lower Montney prospect in southeast Ante Creek New Well Design Is Delivering Promising…
  62. December 2017 Investor Presentation – Arc Resources Ltd. – slide 62
    Pembina ? Asset Details High Working Interest of Light Oil Production, Competitive Operating Netbacks Net Production (boe/day) ? Q3 2017 10,300 Liquids (bbl/day) 8,340 Gas (MMcf/day) 12 Land (Cardium Net Sections) 219 Working…
  63. December 2017 Investor Presentation – Arc Resources Ltd. – slide 63
  64. December 2017 Investor Presentation – Arc Resources Ltd. – slide 64
    Why Invest in ARC? A Differentiated Investment with Tremendous Opportunity ? Top-tier Assets ? Owned Infrastructure ? Operational Efficiencies ? Market Access ? Balance Sheet Strength ? Full-cycle Returning Projects ? Disciplined…
  65. December 2017 Investor Presentation – Arc Resources Ltd. – slide 65
  66. December 2017 Investor Presentation – Arc Resources Ltd. – slide 66
    Transformation Has Allowed ARC to Manage a Profitable Business through the Cycles Production Split 100% 75% 50% 25% 25% 20% 15% 10% 5% 0% (5%) (10%) 0% Transition to the Montney Montney Growth Production 2017 YTD…
  67. December 2017 Investor Presentation – Arc Resources Ltd. – slide 67
    Reserve Replacement ? Montney assets have been the centerpiece to ARC?s strategy of organic reserves and resource growth and provide continued upside potential ? Finding and development costs of $4.02/boe for proved plus probable…
  68. December 2017 Investor Presentation – Arc Resources Ltd. – slide 68
    0 200 400 600 800 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2P Reserves (MMboe) Natural Gas Liquids Key Reserve Information Reserves at year-end, December 31, 2016 ? Proved Producing 212 MMboe ? Total Proved 426 MMboe…
  69. December 2017 Investor Presentation – Arc Resources Ltd. – slide 69
  70. December 2017 Investor Presentation – Arc Resources Ltd. – slide 70
    Dawson ? Development Potential Additional Development Layer Below Core Acreage Lower Montney Booked Reserves Upper Montney A Booked Reserves ARC Montney Lands ARC Montney Lands with 2P Reserves booked as of YE 2016 ARC Montney…
  71. December 2017 Investor Presentation – Arc Resources Ltd. – slide 71
    Parkland/Tower ? Development Potential Incremental Reserves Potential With Multi-layer Development Upper Montney A Booked Reserves Upper Montney A+ Booked Reserves Lower Montney Booked Reserves ARC Montney Lands ARC Montney Lands…
  72. December 2017 Investor Presentation – Arc Resources Ltd. – slide 72
    ARC Montney Lands Montney Lands with 2P Reserves booked as of YE 2016 ARC Montney Lands with 2P Reserves booked as of YE 2016 ARC Montney Lands with 2P Reserves booked as of YE 2016 Sunrise ? Development Potential Proven Productivity…
  73. December 2017 Investor Presentation – Arc Resources Ltd. – slide 73
    0 100 200 Wells Drilled to YE 2016 Drilling Opportunities at YE 2016 Wells Drilling Inventory Wells Drilled 2P Booked Locations Ante Creek ? Development Potential Large Land Base and Down-spacing = Significant Drilling…
  74. December 2017 Investor Presentation – Arc Resources Ltd. – slide 74
    Q3 & YTD 2017 Operating and Financial Highlights Key Performance Indicators for Q3 and YTD 2017 Three Months Ended Nine Months Ended (Cdn$ millions, except per share and per boe amounts) June 30, 2017 September 30, 2017 September…
  75. December 2017 Investor Presentation – Arc Resources Ltd. – slide 75
    Canadian Benchmarking: 2017E Year-end Net Debt / 2017E Cash Flow (1)(2) 13.1x 15.8x E&P Leverage Analysis ARC Has One of the Strongest Balance Sheets in the Sector US Benchmarking: 2017E Year-end Net Debt / 2017E Cash Flow (1)(3)…
  76. December 2017 Investor Presentation – Arc Resources Ltd. – slide 76
    (50) 0 50 100 150 200 250 2009 2010 2011 2012 2013 2014 2015 2016 2017F 2018F 2019F 2020F 2021F $ millions Realized Gains (Losses) on Risk Management Contracts (1)(2)(3) Crude Oil Natural Gas Foreign Exchange & Power Total…
  77. December 2017 Investor Presentation – Arc Resources Ltd. – slide 77
    Risk Management Contract Positions Summary of Risk Management Contract Positions as at November 9, 2017 (1) Q4 2017 2018 2019 2020 2021 2022 Crude Oil ? WTI (2) US$/bbl bbl/day US$/bbl bbl/day US$/bbl bbl/day US$/bbl bbl/day US$/bbl…
  78. December 2017 Investor Presentation – Arc Resources Ltd. – slide 78
    Definitions of Oil and Gas Reserves and Resources Reserves are estimated remaining quantities of oil and natural gas and related substances anticipated to be recoverable from known accumulations, as of a given date, based on the…
  79. December 2017 Investor Presentation – Arc Resources Ltd. – slide 79
    Definitions of Oil and Gas Reserves and Resources Project Maturity Subclass Development Unclarified as a contingent resources that requires further appraisal to clarify the potential for development and has been assigned a lower chance…
  80. December 2017 Investor Presentation – Arc Resources Ltd. – slide 80
    For further information about ARC Resources Ltd. please visit our website www.arcresources.com Or contact: Investor Relations E-mail: ir@arcresources.com T 403.503.8600 F 403.509.6417 Toll Free 1.888.272.4900 ARC Resources Ltd.…
  81. December 2017 Investor Presentation – Arc Resources Ltd. – slide 81
    ($ millions, except per share amounts) 2017 2016 2015 FINANCIAL Q3 Q2 Q1 Q4 Q3 Q2 Q1 Q4 Sales of crude oil, natural gas, condensate, NGLs and other income 279.2 297.0 309.2 331.8 265.6 234.9 231.2 285.9 Per share, basic 0.79 0.84 0.87…
  82. December 2017 Investor Presentation – Arc Resources Ltd. – slide 82
    Total capital expenditures, including undeveloped land purchases 255.7 165.7 260.4 161.9 122.5 112.6 59.1 154.1 Acquisitions ? 0.1 0.2 14.6 31.6 111.6 15.1 0.3 Dispositions ? ? ? (702.1) (0.3) (3.0) ? (42.2) Total capital…
  83. December 2017 Investor Presentation – Arc Resources Ltd. – slide 83
    DIRECTORS Harold N. Kvisle (1) Chairman Myron M. Stadnyk President and Chief Executive Officer David R. Collyer (2) (3) John P. Dielwart (2) (4) Fred J. Dyment (1) (3) Timothy J. Hearn (1) (5) James C. Houck (4) (6) Kathleen…
  84. December 2017 Investor Presentation – Arc Resources Ltd. – slide 84
    OFFICERS Myron M. Stadnyk President and Chief Executive Officer Terry M. Anderson Senior Vice President and Chief Operating Officer P. Van R. Dafoe Senior Vice President and Chief Financial Officer Bevin M. Wirzba Senior Vice…