BUILDING OUR FUTURE IN THE MONTNEY Location, Location, Location Corporate Presentation January, 2018
ABOUT CREW (TSX: CR) Liquids-focused, NE BC Montney producer Large, contiguous land base with a massive resource 16 billion boe with only 2% of the resource booked as reserves Access to diversified markets with operated and growing…
THE WORLD NEEDS MORE ENERGY Demand set to outstrip supply Global LNG(1) Post-2020 limited supply with increased demand = significant growth opportunities An additional 100 million tonnes per annum (mmtpa) of LNG or 16.5 Bcf/d…
MAXIMIZING RETURNS FROM OUR RESOURCE It starts with the rock Build a material prospective land position at a low cost Define the resource and convert the prospective land to resource Convert the resource into reserves and…
SIGNIFICANT PROSPECTIVE LAND POSITION BUILT And for low cost 280,000 acres for net 285/acre Montney (2007) Montney (2010) Montney (2017) Value Production Land Date Area Divested (mm) (boe/d) (acres) Apr 2010 Edson Cardium 126…
CONVERTING PROSPECTIVE LAND TO RESOURCE Montney is a siltstone, not a shale Montney Attributes: Exceptionally thick: up to 1,000 feet Permeability 20-80x greater than comparable resource plays in North America Excellent fracability…
CREW MONTNEY STRATIGRAPHIC STACK 2 HZ Wells 4 HZ Wells 3 HZ Wells 77 HZ Wells 77 HZ Wells 10 HZ Wells West Portage Groundbirch Attachie West Septimus Septimus Tower Doig Upper Montney 9 1 AA 1 23 7 2 A 42 48 3 B 2 9 3…
CONVERTING RESOURCE TO PRODUCTION & RESERVES And do it for low cost Forecast 350.0 323.9 30,000 P+P Reserves(2) (MMBOE) Montney Production(1) (BOE/D) 300.0 25,000 246.5 250.0 Liquids mmbbls Natural Gas boepd 20,000 Gas mboe 201.9…
PROOF OF CONCEPT WITH SEPTIMUS Achieved free cash flow model 85 MM Free cash flow forecast 16 19(2) Long-range growth plan forecasts free cash flow equivalent to Septimus multiplied by 5 (16/17 actuals & 18/19 forecast) 100 90…
WEST SEPTIMUS: CONDENSATE RICH Plant expansion to 120 mmcf/d plus high condensate rates accelerates free cash flow generation Higher liquids weighting contributes to a better return on 7000 2x Initial Condensate Ratios vs.…
ULTRA CONDENSATE-RICH AREA New focus at Greater Septimus Focus on ultra-condensate rich development in 18 Condensate ratios of 75-250 bbls/mmcf in area Ultra Condensate-Rich 68% ROR at flat 1.50/GJ AECO & US60/bbl Crew 6-24 Pad Crew…
GROUNDBIRCH Delineation area with long-term upside Higher liquids content than Septimus at 40 bbls W. Septimus facility 120 mmcf/d capacity Recent Landsale / mmcf, 60% condensate 2.1MM / section Large pay thickness (500 ft. Upper…
ATTACHIE Pilot wells successful July 2017 Landsale 21 Sections 77MM 3.7 MM / Section Over-pressured 1.5 - 1.8x with liquids-rich natural gas B13-26-84-24W6 Large pay thickness (1,000 Upper + Lower Montney) Crew 10-22 10.5…
SEPTIMUS 5X MODEL Inventory of 5,465 identified drilling locations(1) supports processing capacity + growth Future Growth Supported by Operated Infrastructure 1x Septimus: 60 mmcf/d 104 identified locations & 6 wells per year to…
CONTINUE DE-RISKING AND HIGH GRADING PORTFOLIO WITH STAGED INFRASTRUCTURE BUILDOUT 275 mmcf/d takeaway capacity with 325 mmcf/d of processing Transportation TCPL/Nova: 60 mmcf/d firm increasing to 120 mmcf/d (Jun 19) Spectra: 30…
REALIZED IMPACT OF GAS MARKET DIVERSITY Ideally positioned with access to 3 major export pipelines 3.50 Commencement of Alliance Pipeline service and initiation of diversified contract portfolio 3.00 Natural Gas Prices (C/MCF)…
CONTROLLING COSTS & MAXIMIZING NETBACKS Montney assets continue to generate attractive netbacks Rolling One Year (to Q3 17) Rolling One Year (to Q3 17) Operating Netbacks (Pre-Hedging) for Operating Costs Among Montney-Focused Peers…
TRACK RECORD OF PROFITABILITY SUPPORTED BY LOW COSTS 2016 PDP FD&A Costs 2016 Cash Costs (US/boe) (US/boe, net of royalties) 60 30 Canadian Co's Canadian Co's US Co's US Co's 50 Median 25 Median 40 20 30 15 20 10…
TOP QUARTILE CAPITAL EFFICIENCIES DRIVE STRONG RECYCLE RATIOS 3-Year Proved Developed FD&A Costs 3-Year Proved Developed Recycle Ratio (US/boe, net of royalties) (US/boe, net of royalties, including hedging) 60 3.5x Canadian Co's…
VALUE / PROFITABILITY DISCONNECT 14.0x US Co's Revenue - PDP FD&A Costs - Cash Costs = CXO Canadian Co's 12.0x Full Cycle Profitability Increasing valuation 10.0x IBR PE PXD AREX CHK EV/DACF 2018 XEC COG EGN EOG APA…
KEY MONTNEY BUILDING BLOCKS ARE IN PLACE 16+ billion boe TPIIP with 5,465 identified locations(1) on 280,000 net acres Massive Montney Resource Only 13% of Upper Montney land has reserves assigned Condensate, Light Oil & Focus on…
Contact Info: 23 Dale O. Shwed, President & CEO John G. Leach, Senior Vice President & CFO Suite 800, 250 - 5th Street SW Calgary, Alberta T2P 0R4 Telephone: (403) 266-2088 Email: investorcrewenergy.com www.crewenergy.com 23
APPENDIX www.crewenergy.com 24
HEDGING SUMMARY Hedging Summary as of Jan 4, 2018 Volume Period Derivative Reference Price Natural Gas 2,500 GJ/Day 2018 Swap AECO C2.62/GJ 17,500 mmbtu/Day 2018 Swap Chicago C3.64/mmbtu 5,000 mmbtu/Day 2018 Swap NYMEX US3.05/mmbtu Oil…