Tourmaline Oil Corp. Investor Day 1. INTRODUCTION 1
EP Growth Plan (Original Business Plan) Sept 2008 This is essentially the same business plan that was executed for Duvernay Oil Corp. (2001-2008) Primary growth mechanism will be a conventional EP Program (including Resource…
The Ever Changing EP Landscape Jan 2017 The size, style, and life cycle of EP start-ups have changed considerably over the past 10 years. BKP/DDV started life as event/well driven microcaps TOU required scale rapidly, target was…
Historical EP Performance Feb 2017 Production Growth Per Share* Reserves Growth Per Share* 350 7 Production per Thousand Shares Reserves per Share (BOEs) 300 6 250 5 200 4 (BOEs) 150 3 100 2 50 1 0 0 2009 2010 2011…
TOU Positioning and Peer Group Analysis: TOU vs Canadian E&P Average Production per Share Growth Production Per Share Growth 50% 350 45% 300 Production per Thousand Shares (BOE) 40% 35% 250 30% 200 CAGR % 25%…
Largest Canadian Gas Producers; 2015 & 2016 Feb 2017 Canadian WCSB Gas Production 2015A & 2016E** 1,700 1,600 2015A Natural Gas (MMcf/d) 1,500 2016E Natural Gas (MMcf/d) 1,400 2017E Natural Gas (MMcf/d) 1,300 1,200 Production…
Current Status Feb 2017 Production Overview 2017 average production forecast of 240,000-260,000 boepd (approx. 30% annual growth, range accounts for firm service interruptions) 2017 liquids production in excess of 40,000 bpd (oil,…
Alberta Deep Basin Feb 2017 T65 R9 R7 R5 Current Production 155,000 -160,000 boepd Current Reserves 871.9 mmboe (Jan 1, 2017) T63 Tourmaline Land Base 3,000 gross sections Drilling Inventory 2,760 locations (vertical) TCPL Main…
Sunrise/Dawson NEBC Montney/Doig Development Feb 2017 Westcoast McMahon Gas Plant Current Prod. 250-270 mmcf/d 4,500-5,000 bopd (cond,ngls) Current Reserves 394.4 mmboe (Jan 1, 2017) Montney Drilling In excess of 2,100 horizontal…
Gundy Ck Acquisition/ Northern Montney Complex Oct 2016 Gundy Current Production: 6,214 boepd (July) No of wells drilled: 25 No of potential locations: 1647 (100% TOU) Liquid content: 30-50 bbls/mmcf Northern Montney Complex post Gundy…
Peace River High Complex Charlie Lake Play Feb 2017 Earring 15-16 R. 10 R. 9 R.BOPD, IP90: 130 7 R. 5 1.7 MMSCF/D Peace River High Charlie Lake Play 1,596 Horizontal Locations* along Regional Play Fairway Mulligan 4-13 Upper Trcl…
Significant Recent EP Highlights Feb 2017 Deep Basin Minehead 16-15 Notikewin hz has averaged 29.7 mmcfpd over initial 60 days, cum gas prod of 2.20 bcf Kakwa 12-35 Falher C hz has averaged 20.5 mmcfpd over initial 50 days, 26…
Tourmaline Mid-Stream Assets Feb 2017 The infrastructure skeleton in all three core operated complexes is now complete R. 15W6 R. 1W6 R. 15W5 Gundy Inga 17 Working interest gas plants, 14 of which NE Alberta BC are 100% owned and…
Gas Development Location Inventory and Economics Feb 2017 AB Deep Basin Outer Foothills AB Deep Basin B.C. Montney Charlie Lake Vertical Vertical Horizontal Horizontal Horizontal Total Well Costs 3.7 5.25 4.40 2.90 2.7 (Drill, Case,…
Capital Cost Reduction Overview Dec 2016 Tourmaline drill and complete capital costs have been reduced by 30% since Q1 2015. A further 15% reduction was achieved with the 2H 2016 EP program. The Company estimates that 60-65% of…
The EP Life Cycle Select EP focus Major Infrastructure buildout Full areas delineation Full development of Development/ Acquire drilling phase delineated assets Harvest in core assets/land Asset Continue delineation drilling areas…
Shell Acquisition Overview Oct 2016 A major step towards the ongoing plan to become Canadas and one of North Americas largest, most efficient, lowest cost and profitable natural gas producers. The acquisition provides a significant…
Agenda Investors Day 1. Introduction..................................................................................................................... Mike Rose 2. Reserves…
Tourmaline Oil Corp. Investor Day 2. RESERVES 1
Reserves: A Tourmaline Perspective Feb 2017 TOU Reservoir Engineering Team Historical Reserves Growth and Area Distribution 2016 YE Reserves Summary and Highlights Key Components for a Strong Reserve Report Type Wells A&D…
4 Current Reserve Distribution Feb 2017 R. 11W6 R. 1W6 R. 15W5 Peace River High NE Alberta 125 BC Inga Total Natural Gas Reserve Base of 8.93 108.8 TCF, one of the largest in Canada. 100 Gundy T85 Peace River High 75…
2016 Year-End Reserves Feb 2017 PDP 2P Undeveloped 6
2016 Year-End Reserve Highlights Feb 2017 P+P Reserves of 1.75 Bboe - growth of 64% (706 mmboe) before production, including acquisitions Since the beginning in 2008: - growth of 58% (638 mmboe) net of production, including…
2016 Year-End Reserve Highlights Feb 2017 P+P BT-NPV10 growth of 54%, up to 12.7B from 8.3B PDP BT-NPV10 growth of 40%, up to 4.0B from 2.8B 2016 F&D including FDC change of 1.49/boe F&D LOWER than previous year FD&A slightly…
2016 Year-End Reserve Highlights Feb 2017 FDC increased 42% up to 6.4B (undisc.), with the addition of 596 net locations (623 gross 97% WI avg) FDC/Well DECREASED 10% to 4.0 mm/Well as a result of continuing D&C efficiencies 2P…
Reserves Price Forecast Comparison Feb 2017 Time normalized comparison charts Front-End price increase 2016-YE vs 2015-YE Year 2 price cross-over for Gas Year 3 price cross-over for Oil Ultimately, effect on BT-NPV10 for…
Recipe for a Strong TP+P Reserve Report Feb 2017 Growing sentiment in Investment Community that undeveloped reserves are becoming less and less valid, and hence are being discounted more heavily and in some cases even dismissed in…
Deep Basin Edson WLRC HZ TYPE WELL Feb 2017 EDSON: WLRC HZ (5.5 BCF) AVG (mscfd) TYPE WELL WELL COUNT 20,000 60 Statistical Sample = 53 HZ EUR = 5.5 BCF raw Solid Economics = 942 mboe sales 18,000 = 5.65 BCFe sales HIGH IP = 12…
NEBC Doe Upper MNTN HZ TYPE WELL Feb 2017 NE BC - DOE: Upper MNTN HZ (5.6 BCF) AVG (mscfd) TYPE WELL WELL COUNT 20,000 60 n (exponent) = 1.00 Statistical Sample = 49 HZ EUR = 5.6 BCF raw Solid Economics 18,000 = 1,018 mboe sales…
Gundy MNTN HZ Type Wells Feb 2017 Acquisition in Gundy added 383 net HZ to our 2P undeveloped inventory, with an average BT-NPV10 of 4.1 MM. The total overall Gundy inventory, including unbooked locations is estimated at 1,671 net HZ…
A&D Metrics Feb 2017 Tourmaline focuses on a number of key components when evaluating assets for Acquisition: 1. Reserves volumes/value F&D consistent with TOU area/corporate Development well economics rank well with existing…
Tourmaline Oil Corp. Investor Day 3. ENGINEERING & WELL OPERATIONS 1
TOU Wells Drilled Cumulative Wells Drilled 2000 1800 Cumulative TOU Wells Drilled 894 Wells Drilled Since the Start of TOU as of February 15th 2017 1600 1400 1200 1000 800 600 400 200 0 2009 2010 2011 2012 2013 2014…
Technology and Innovation Utilize latest technology in down hole motors and tools The Right Equipment Use rig walking systems to reduce cycle times and Tourmaline currently operates one of create most value from pad sites the…
Historical Drilling Performance South Deep Basin Development Average Drill Days Average Drill Cost 35 4.5 30 57% 4.0 49% Decrease Since 2013 Decrease Since 2013 3.5 25 3.0 20 2.5 Days MM 15 2.0 1.5 10 1.0 5 0.5…
Historical Drilling Performance Peace River High Development Average Drill Days Average Drill Cost 20 3.0 18 41% 2.5 36% Decrease Since 2013 16 Decrease Since 2013 14 2.0 12 Days MM 10 1.5 8 1.0 6 4 0.5 2 0…
Historical Drilling Performance NEBC Development Average Drill Days 4 Average Drill Cost 20 18 55% 16 Decrease Since 2013 3 57% Decrease Since 2013 14 12 MM 2 10 Days 8 6 1 4 2 0 - 2013 2014 2015 2016 2017…
Deep Basin Drilling Cost Projections 6,000,000 5,000,000 3 potential cost scenarios based on various service price recoveries 4,000,000 3,000,000 2,000,000 1,000,000 - 14/15 Cost 15/16 Cost 16/17 Cost 17/18 (25%…
Peace River High Oil Drilling Cost Projections 3,000,000 2,500,000 3 potential cost scenarios based on various service price recoveries 2,000,000 1,500,000 1,000,000 500,000 - 14/15 Cost 15/16 Cost 16/17 Cost 17/18…
NEBC Basin Drilling Cost Projections 3,000,000 2,500,000 3 potential cost scenarios based on various service price recoveries 2,000,000 1,500,000 1,000,000 500,000 - 14/15 Cost 15/16 Cost 16/17 Cost 17/18 (25% Service…
Historical Completions Performance Deep Basin - Completions Peace River High - Completions 3,000 3,500 2,500 47% 3,000 72% Decrease Since 2012 2,500 Decrease Since 2012 2,000 2,000 000 000 1,500 1,500 1,000 1,000 500…
Stimulation Metrics 2016-2017 Stage count Sand 29 1,600 28 1,400 28 1,200 Number of Stages 27 27 1,000 Tonnage 26 800 25 25 600 400 24 200 23 0 PRH NEBC DB PRH NEBC DB Average Hz Length and Measured Depth…
Manufacturing Approach to Well Design and Stimulation Well design is standardized in each core development area lending to repeatability of operational execution Open hole stimulation systems are utilized in each core area. TOU…
Well Construction Progression in South Deep Basin from 2012 to 2017 South Deep Basin Cost Evolution 2012 to 2017 8,000 8,000 53% 7,000 7,000 2013, 6,888 2012, 6,779 Decrease Since 2012 6,000 6,000 2014, 5,828 2015, 5,329…
Well Construction Progression in NEBC South Montney from 2012 to 2017 South Montney Cost Evolution 2012 to 2017 6,000 6,000 2013, 5,678 2014, 5,335 5,000 5,000 2012, 4,465 49% 2015, 4,131 Decrease Since 2012 4,000 4,000…
Well Construction Progression in Peace River High Oil from 2012 to 2017 Peace River High Cost Evolution 2012 to 2017 6,000 6,000 2012, 5,238 5,000 5,000 2013, 4,436 54% 4,000 2014, 4,029 Decrease Since 2012 4,000 2015, 3,473…
Tourmaline Water Management Objective Strategy Use Tourmaline produced and flowback water Security of Supply Divert fresh water to storage at times of abundance Secure long term fresh water diversion licenses Pipeline…
Alberta Deep Basin Water Management 100% of all water flowed back from completion operations is recycled 43% of all water sourced for stimulation operations is recycled 135,000m3 of fresh water storage across the asset base TOU has…
BC Water Management 100% of all water flowed back from completion operations is recycled 90% of all water sourced for stimulation operations is recycled 187,000m3 of produced water storage capacity 3 produced water ponds South…
Natural Gas substitution in operations Raw Natural Gas cost (Feb 2017) 0.10/DLE (Diesel Equivalent Liter) vs 0.69/L rack price for marked diesel 12 Drilling Rigs and all BC completion operations use a combination of NG/Diesel…
Key Contractors to Tourmaline Drilling Completion 20
Alberta Deep Basin Development Pad Edson 4 to 6 well Pad development across TOU Deep Basin lands will save up to 500M per well drilled vs drilling conventional 1 to 2 well pads 21
Peace River High Development Pad Easily accessible locations aid in logistics of the Peace River High operations 22
Peace River High Well Servicing Preparation for stimulation with service rig 23
South Montney Development Pad Six well pad in the South Montney being stimulated 24
Significantly Reduced Surface Impact of Pad Drilling South Montney 6 well Montney pad at Sunrise-Dawson NEBC. IP of 12,500 boepd, equivalent to a small intermediate company initially with minimal surface/agricultural impact. 25
Tourmaline Oil Corp. Investor Day 4. LAND 1
Core Operating Areas Feb 2017 R. 11W6 R. 1W6 R. 15W5 Inga BC Montney Gas/Cond Gundy T85 Mulligan/Earring Acre Net Summary Gross Acres Acres Sunrise-Dawson Deep Basin 1,940,598 1,594,769 Peace River High Charlie Lk Oil BC…
Land Picture Challenges and Opportunities Feb 2017 Regulatory Evolving Political Regimes Regulatory Change Environmental Hurdles Expiries 98% of TOU Landbase Tenure Maintained in 2016 Liabilities Greater emphasis on historical…
Tourmaline Total Land and Peer Comparison Feb 2017 Western Canadian Gross Land Positions (Acres) R. 11W6 R. 1W6 R. 15W5 Inga BC Montney Gundy Gas/Cond 14,356,557 T85 Mulligan/Earring Sunrise- Dawson Peace River High…
Buying Strategic Land Synergies Feb 2017 Gundy/Deep Basin Alberta Deep Basin November 2016 Significant value creation through February 2016 309,120 Acres accretive synergetic acquisitions. 80,320 Acres 2016 Mapan Buying land…
Yearly Core Operating Areas Lookback Feb 2017 TOU Lands 2010 NE Alberta Inga TOU Lands 2011 BC Gundy TOU Lands 2012 TOU Lands 2013 TOU Lands 2014 Montney Mulligan/Earring TOU Lands 2015 Gas/Cond Sunrise-Dawson TOU Lands…
Montney Land and Corporate Acquisitions Feb 2017 Tourmaline and the Development of N.E. Tourmaline Montney N.E. BC Acquisitions B.C. Montney play. First Acquisition 25 Sections from the (/Acres) 3,500 purchase of Pienza 3,000…
Montney Land and Corporate Acquisitions Feb 2017 Transaction EV/boe/d EV/P+P Acquirer Target Transaction Value Land acres Price per Acre Type % Gas Date (C/boe/d) (C/boe) 1-Jan-17 Undisclosed Kelt (Karr) 100 MM 16,480 6,067 Asset…
Recent Permian Transactions Feb 2017 Cost of Resource Cost of Resource Cost Production /Acre Locations Implied (/boe) (/boe) Date Purchaser Seller (US MM) Net Acres (boe/d) /Boe/d /Acre Adj. Added Loc/Section 1 mmboe/location 0.8…
Acquisitions Montney Vs Two Premiere USA Shale Plays (Marcellus and Permian) Feb 2017 CDN Montney Deals Vs Two USA Shale Plays (CAD/Acre)(1) 45,000 40,000 35,000 30,000 CAD / Acres 25,000 20,000 15,000 10,000…
Deep Basin Land and Corporate Acquisitions Feb 2017 Transaction Transaction EV/boe/d EV/P+P Date Acquiror Target Type Value % Gas (C/boe/d) (C/boe) Shell (Deep Basin & October 2016 Tourmaline Asset 1,369 85% 55,091 2.89 Montney)…
Shell Acquisition Overview Feb 2017 The asset is the original Duvernay Oil Corp. Deep Basin R. 11W6 R. 1W6 R. 15W5 position supplemented with incremental acreage by Shell. Inga BC Montney Gas/Cond (2008-2016) Gundy T85 The…
Alberta Deep Basin Shell Deep Basin Assets Oct. 2016 T65 R7 R5 Shell Acquisition 13-16-057-25-W5M 3 well Pad Spudding 3rd Pad on Shell Deep Basin portion of asset T63 TCPL Main Line Complete drilling 5 wells on 100% Shell…
Gundy Ck Acquisition/ Northern Montney Complex Oct. 2016 Northern Montney Complex post Gundy Transaction Blackswan A-a054-D Upper 6.7 mmcf/d; 130 bbls/d IP30 Spudding the 1st well on a 9 well pad A-78-A to be fully completed end of…
Alberta Deep Basin Edson/Minehead Asset Acquisition Feb 2017 R7 R5 What We Said T65 Bought 4,500-5,000 boe/d T63 Plan to grow to 7,500 boe/d TCPL Main Line T61 48 mmboe in new 2P reserves Fir Musreau Leland Fully developed…
Tourmaline Oil Corp. Investor Day 5. GEOLOGY 1
Outline Feb 2017 Tourmaline Staff Organizational chart of the Exploration team Development Tourmaline 3 core areas Active rigs 2016 well results TOU infrastructure/ midstream assets New EP Opportunities Permeability Play…
Core Operating Areas Feb 2017 R. 11W6 R. 1W6 R. 15W5 NE Alberta Inga BC Montney Gundy Gas/Cond T85 AB Deep Basin Sunrise-Dawson Mulligan/Earring Peace River High PRH Oil Charlie Lk Oil T75 Sundown Spirit River NEBC MNTN…
3 Core De-risked Plays Feb 2017 R. 11W6 R. 1W6 R. 15W5 Top Alberta Other Oil Wells (Sept-Nov 2016) 80,000 Inga Gas Montney TOU Lands BOE (CTD) Gas/Cond 60,000 Liquids Gundy TOU Top AB Gas Wells T85 TOU Top Oil Wells 40,000…
Tourmaline Mid-Stream Assets Feb 2017 The infrastructure skeleton in all three core operated complexes is now complete R. 15W6 R. 1W6 R. 15W5 Gundy Inga 17 Working interest gas plants, 14 of which NE Alberta BC are 100% owned and…
Resource Play Permeability Spectrum Conventional Tight Gas Hybrid Pure Shale Sandstone Alberta Deep Basin/ Silt/Sand/Shale Plays Hoadley Plays Montney Duvernay/ Horn River/US Shale Plays Permeability 10-1000 md 0.01-1 md…
H New EP Opportunities Feb 2017 R13 R11 R9 R7 R5 R3 R1W6 R23 R21 R19 R17 R15 R13 R11 R9 R25 T87 T87 T85 Peace River High T85 T83 Lower Charlie Lake T83 Montney T81 Discovered 2015 T81 150-300 Locations…
Brazeau Viking Feb 2017 R. 17 R. 16 R. 15 R. 14 R. 13W5 A A T. 47 Legend Tourmaline Lands Tourmaline Viking HZ 2016 A A A A Pool Location Tourmaline Viking HZ 2017 A A Inventory: 30 Tourmaline Viking HZ 2015 A A A A A…
Boe (CTD) TOU/Exshaw Lower Charlie Lake TOU/Exshaw Upper Charlie Lake 0 10,000 30,000 40,000 50,000 60,000 70,000 80,000 20,000 Exshaw 16-14-077-08W6 Boulder 08-08-047-14W5 Tourmaline 04-13-083-08W6 Exshaw…
Montney Turbidite Feb 2017 BC AB A05-05 and D05-05 were drilled based on gas response from offset verticals and successful drills in the Sundown area. NEBC Montney Turbidte Play End of Test Rates: 29 HZ wells drilled A05-05…
Is Exploration Over Feb 2017 Worldwide oil and gas discoveries in 2016 dropped below 1940s levels 2016 offshore liquids discoveries of 2.3 billion boe were 90% below 2010 levels Reserve replacement by Majors in 2016 approached only…
H Tourmaline Deep Exploration Opportunities Feb 2017 R13 R11 R9 R7 R5 R3 R1W6 R23 R21 R19 R17 R15 R13 R11 R9 R25 T87 N.E. B.C and Spirit River T87 T85 Mulligan/Earring T85 Halfway, Doig, Belloy MontneySunrise-Dawson…
Exploration Summary Feb 2017 Tourmaline Staff Tourmaline has a balance of experienced and youthful geotechnical staff By running lean with minimal reporting each geoscientist takes ownership of his/her own areas Development…
Schedule A DRILLING LOCATIONS Estimated Drilling Inventory This news release discloses drilling locations in four categories: (i) proved undeveloped locations; (ii) probable undeveloped locations; (iii) unbooked locations; and (iv) an…
Schedule A continued Deep Basin Vertical well count : Approximately 2,746 gross prospective sections at approximately 1.5 wells per section minus 10% for areas that are inaccessible or limited by spacing requirements minus approximately…
Schedule B Prospective locations are unbooked locations that are not included in inventory. Unbooked locations are internal estimates based on the Company's prospective acreage and an assumption as to the number of wells that can be…