BONTERRA ENERGY CORP. FEB 2018 POSITIONED FOR SUCCESS
FOCUS ON FUNDAMENTALS SUSTAINABLE YIELD Low Corporate Decline 22% Corporate Decline All-in costs (royalties, operating costs, G&A, and interest Low Cost Producer expense) of approximately 21 per boe DISCIPLINED GROWTH Light…
CURRENT SNAPSHOT Common shares 33.3 mm outstanding Insider ownership 12% Current monthly dividend 0.10 per share Current annualized yield(1) 8.0% Oil and liquids weighting 71% Oil & Liquids Reserve life index (2P) 20 years…
PEMBINA CARDIUM OVERVIEW Majority of Bonterra land covers areas with large original-oil-in-place, offering significant potential to increase recovery factors resulting in sizable increases in reserves and production. ORIGINAL OIL IN…
CONCENTRATED ASSET BASE CARDIUM LANDS Average working interest 76% Cynthia Bonterra operates 88.5% of its total West Keystone production Pembina Reserve life index (P+P) 20 years Carnwood Blue Rapids Rose Creek Reserves…
PRODUCTION FORECAST Vertical Wells Horizontal Wells 2018 Capital Program 16,000 14,000 12,000 10,000 BOE/d 8,000 22% Corporate Decline Rate 6,000 4,000 2,000 0 Jan-17 Apr-17 Jul-17 Oct-17 Jan-18 Apr-18…
SHAREHOLDER VALUE Production per Share Production Profile (boe per share) 30% Natural Gas 0.109 0.119 0.124 0.147 0.150 0.140 0.140 70% Oil/NGLs 13,195 12,656 12,650 12,190 2010 2011 2012 2013 2014 2015 2016…
SHAREHOLDER VALUE Reserves per Share Reserves Profile (boe per share) (Proved plus Probable) (Proved plus Probable) 29% Natural Gas 2.09 2.13 2.28 2.47 2.50 2.78 2.85 71% Oil/NGLs 94,905 90,621 80,248 2010 2011…
HIGH QUALITY RESERVE BASE Grand Total Reserves 95 Million boe 10% NPV Total 1.36 billion Probable Probable 22% Proved 23% Developed Proved Producing Developed Proved Producing 43% Undeveloped 54% Proved Undeveloped 23% 35%…
LOW-COST RESERVE ADDITIONS IMPROVING CAPITAL EFFICIENCIES FD&A Costs per BOE, Incl. FDC 1P FD&A 2P FD&A 25.00 22.67 Bonterra is getting more efficient at replacing its reserve base 20.00 18.90 42% reduction in 1P FD&A from…
COMMITMENT TO COST CONTROL DECLINING ALL-IN COSTS PER BOE 30.00 All-In costs less than 20.00 per boe 27.01 25.24 25.21 25.00 30% reduction in All-In costs from 2012 to 2016 19.00 18.98 20.00 30% reduction in Operating Costs…
DRILLING & COMPLETION INNOVATION Total Drill, Complete, Equip & Tie-In Cost Per Well 1 mile horizontal 3,500 3,000 2,500 D&C COST MM Forecast 2,000 1,500 1,000 500 0 2012 2013 2014 2015 2016 2017 Drill…
AVERAGE BNE CARDIUM ECONOMICS BNE TYPE CURVE PREDICTABLE AND REPEATABLE 300.00 250.00 Reserves per well (MBOE) 165 200.00 IP (1 month) (boe/d) 255 BOE/D 150.00 IP (12 months) (boe/d) 125 100.00 50.00 - 1 2 3 4 5 6 7 8 9…
CARDIUM LOCATIONS SIGNIFICANT CARDIUM INVENTORY Total Inventory * Booked Locations 2018 Drill Program Area Name Avg WI% Gross Net Gross Net Gross Net ROSE CREEK 97.2% 240 233 32 30 8 8 KEYSTONE 94.8% 175 166 94 91 2 2 CARNWOOD…
CARNWOOD AREA Drilled Potential Drilling locations Sections: 41 gross (37 net); Locations (6 to 8 wells per section): 206 gross (190 net) 17
PEMBINA CARDIUM DEVELOPMENT HORIZONTAL WATERFLOOD PILOT Primary vs. Waterflood Horizontal Production Horizontal Primary Horizontal Waterflood 1000 Start of injection 100 BOPD Based on production and numerical reservoir…
CASH FLOW SENSITIVITIES Per Annum Cash Flow Sensitivity Analysis(1) (estimate for 2017) Cash Flow Per Share(2) Change of Canadian 1.00 per barrel of oil and NGLs 2,774,000 0.09 Change of Canadian 0.10 per MCF of natural gas 872,000…