2 Current Status May 2018 Production Overview 2018 average production forecast of 270,000-280,000 boepd 2018 average liquid production of 50,000 bpd 2018 production exit estimate of 285,000-290,000 boepd. Three Major Core Areas…
3 Historical EP Performance Mar 2018 Production Growth Per Share* Reserves Growth Per Share* 350 9 Production per Thousand Shares Reserves per Share (BOEs) 300 8 7 250 6 200 5 (BOEs) 150 4 100 3 2 50 1 0 0 2009…
4 A History of Full Cycle Profitability May 2018 400 6.00 * 350 Earnings before taxes (000,000s) 5.00 AECO (CAD/mcf) Earnings before tax ( millions) 300 4.00 250 AECO (/mcf) 200 3.00 150 2.00 100 1.00…
5 Largest Canadian Gas Producers Mar 2018 1,800 2016A Natural Gas (Mmcf/d) 1,600 2017E Natural Gas (Mmcf/d) 1,400 2018E Natural Gas (Mmcf/d) 1,200 Production (Mmcf/d) Tourmaline is currently producing 1,000 between…
6 A Significant Liquids Producer May 2018 Tourmaline has doubled liquids production over the past 15 months with strong liquids growth across all three operated complexes. Condensate production will grow from current levels of 12,000…
7 Balanced Revenue and Cash Flow Streams Through Product, Marketing and Transportation Diversification May 2018 2018 BUDGETED REVENUE 19% AECO Oil 27% Fixed Price 16% NGL 11% NYMEX Basis NYMEX-Based Delivery 4%…
8 Current 5 Year Plan(1) May 2018 400,000 350,000 300,000 250,000 Spirit River Boe/d 200,000 NEBC 150,000 Deep Basin 100,000 50,000 - 2016 2017 2018 2019 2020 2021 2022 After-tax After-tax E&P Capital Free Cash…
9 Alberta Deep Basin May 2018 T65 R9 R7 R5 Current Production 180,000-185,000 boepd Current Reserves 984.4 mmboe (Jan 1, 2018) T63 Tourmaline Land Base 1.77 million acres Drilling Inventory 2,322 locations (vertical) TCPL Main…
10 Top 25 New Alberta Gas Wells for October 2017 Dec 2017 Note: Excludes plant condensate & NGLS Source: Peters & Co, GeoSCOUT
11 Alberta Deep Basin Liquids Rich Cardium Fairway Mar 2018 The combination of extensive 3D seismic coverage T59 T59 and the lowest cost drilling/completion capability Smoky make the liquids rich Cardium play a significant new…
12 NEBC Montney Gas/Condensate Complex May 2018 Black Swan Current Prod. 350-360 mmcf/d TOU Land Comp. Station, dehy C-60-A Gas Plant 25 mmcf/d 7,500-8,500 bpd condensate TOU Wells 200 MMCF/D Q4 2018 Current Reserves 1,079.4…
13 Gundy Ck Montney Development Mar 2018 Drilling Execution Efficiency Black Swan Gundy 2013 - Comp. Station, dehy Current Production: 11,000-11,500 25 mmcf/d Current Plan 2014 No of wells drilled by TOU: 26 Days 10 14 14.6 No of…
14 Peace River High Complex Triassic Oil Charlie Lake and Montney Plays Mar 2018 Mulligan 8-15 Upper Trcl Pad Q3 2016 Peace River High Charlie Lake Play 90 day production rates R. 11 R. 9 5-14 R. Mulligan 7 R. 5 Oil Battery…
15 2018/2019 Liquids Growth Projects May 2018 Doe 2-11 Facility provides capacity for additional liquid rich 3,500 bpd Sweetening Facility Montney turbidite condensate production (17 wells (Q4 2018) currently shut-in). NW Spirit…
16 Tourmaline Mid-Stream Assets Sep 2017 The infrastructure skeleton in all three core operated complexes is now complete. This infrastructure is essentially R. 15W6 R. 1W6 all newR.and 15W5in the growth areas of the WCSB. NE…
18 Independently Recognized Canadian 2P Reserves May 2018 12 Tourmaline has booked only 14% of 10 Natural Gas existing drilling inventory (2,074 of 8 14,471 locations See Schedule A). TCF 6 4 2 1000 0 800…
19 Gas Development Location Inventory and Economics Mar 2018 AB Deep Basin Outer Foothills AB Deep Basin B.C. Montney Charlie Lake Vertical Vertical Horizontal Horizontal Horizontal Total Well Costs 2.55 3.70 3.85 3.05 2.10 (Drill,…
20 The TOU Engineering Execution Machine Sep 2017 Drill & Complete Costs 8.00 Tourmaline has the lowest completed per stage (Equipping not included) well costs in the overall Montney play in 7.00 Western Canada and the Alberta…
Continuously Improving Well Performance 21 and Recoverable Reserves Mar 2018 2,000 Deep Basin EUR 895 mboe 1,500 IP30 1,615 boe/d 41% EUR Increase Since 2012 Boe/d 1,000 IP90 1,197 boe/d 500 IP365 671 boe/d - 1 4 7 10 13…
23 2018 Guidance May 2018 2018(1) Production Boe/d 270,000 - 280,000 Cash Flow(i) - MM 1,343 CFPS - Diluted(i) 4.95 E&P Capital Program(ii) - MM (net of non-core dispositions) 1,082 Free Cash Flow(iii) - MM 232 Exit…
24 2018 Natural Gas Transportation and Marketing Overview May 2018 2018 Natural Gas Portfolio Diversification 2018 Exit: 440 mmcf/d of gas will be to US/Other Markets 2019 Exit: 540 mmcf/d of gas will be to US/Other Markets…
25 2017 Highlights/2018 Outlook Mar 2018 Tourmaline now a Senior with production exceeding 270,000 boepd. Tourmaline is currently the second largest producer of Canadian natural gas and is a top ten Canadian liquids producer…
APPENDIX
27 Natural Gas Flows From Western Canada
28 Completed Well Costs and EUR By N. American Play Type Aug 2017 Well Costs (CAD) Vs. EUR by Play Type 25 0.47/mcf Completed Well Cost CDN EUR (Bcfe) 20.5 Bcfe 0.69/mcf 20 17.9 Bcfe 15 0.70/mcf 12.3 MM 12.5 Bcfe…
29 Tourmaline vs Natural Gas Peers Cash Costs Per BOE July 2017 Tourmaline Vs. Natural Gas Weighted Peers Cash Costs in USD* per BOE (Q1/17) Operating Transportation G&A Interest 12.00 10.26 10.00 1.45 8.00 7.15 1.54 Costs…
30 Historical Drilling Performance and Cost Improvements Mar 2017 South Deep Basin Peace River High Average Drill Days Average Drill Cost Average Drill Days Average Drill Cost 3.0 35 57% 49% 20 41% 36% 5.0 2.5 30 Decrease…
31 Historical Completions Performance Improvements Deep Basin - Completions Peace River High - Completions 3,000 3,500 47% 3,000 72% 2,500 Decrease Since 2012 Decrease Since 2012 2,500 2,000 2,000 000 000 1,500…
33 EP Growth Plan (Original Business Plan) Sept 2008 This is essentially the same business plan that was executed for Duvernay Oil Corp. (2001-2008) Primary growth mechanism will be a conventional EP Program (including Resource…
34 Banshee Alberta Gas Plant Simple, easy to construct dew point plants tied to the main TCPL sales system Total cost (2 phases) of 80M, capacity of 130 mmcfpd with enhanced liquids recovery capability
35 Tourmaline Environmental Performance Tourmaline strives to continually improve all aspects of environmental performance including the impact of its operations on air, land and water. Tourmaline ranks as a top decile performer…
36 BC Water Management 100% of all water flowed back from completion operations is recycled 90% of all water sourced for stimulation operations is recycled 187,000m3 of produced water storage capacity 3 produced water ponds…
37 Natural Gas Substitution in Operations Raw Natural Gas cost (Feb 2017) 0.10/DLE (Diesel Equivalent Liter) vs 0.69/L rack price for marked diesel 12 Drilling Rigs and all BC completion operations use a combination of NG/Diesel…
38 Tourmaline Technology Curve/Future Concepts, Requirements & Opportunities Cost saving via novel frac water sourcing/recycling Alternative hz frac programs/processes Concurrent pairs, delayed flow-backs etc. Novel drilling…
39 Schedule A DRILLING LOCATIONS Estimated Drilling Inventory This presentation discloses drilling locations in four categories: (i) proved undeveloped locations; (ii) probable undeveloped locations; (iii) unbooked locations; and…
40 Schedule A continued Deep Basin Vertical well count : Approximately 2,767 gross prospective sections at approximately 1.5 wells per section minus 10% for areas that are inaccessible or limited by spacing requirements minus…