Skip to main content June 2018 Corporate Presentation – Paramount Resources Ltd. | Shale Experts
Loading...

June 2018 Corporate Presentation – Paramount Resources Ltd.

Paramount Resources Ltd. · Jun 1, 2018 · 29 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 1
    Corporate Presentation June 2018
  2. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 2
    Corporate Overview Founded in 1976; IPO in 1978; TSX: POU Market Cap: 2.2 Bln (133.7 MM shares 16.50/sh) Insider ownership: 46% Net Debt at March 31, 2018 706 MM (1) Total land position 3.1 million net acres including: 378,000 net…
  3. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 3
    Highlights Transaction Highlights April 2016 sold Musreau Plant 565 MM August 2016 sold Musreau Asset 2.1 Bln December 2016 sold royalty on Cavalier Oil Sands Asset 100 MM May 2017 closed the sale of Valhalla assets for cash of 150…
  4. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 4
    Higher Sales & Stronger Balance Sheet Organically grew legacy Paramount production from 11,000 Boe/d following the Musreau sale to 37,000 Boe/d in October 2017 through the Karr development program Returned to pre-disposition…
  5. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 5
    Strategic Transactions 487 MM acquisition; funded with cash on hand High quality Wapiti Montney acreage, liquids-rich Montney and Duvernay at Kaybob and lower decline, long-life assets in Central Alberta (including 183,000 net…
  6. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 6
    Diversified Montney and Duvernay Assets Location Breakeven Breakeven 2021 Wellhead Production Stage of Asset Description Inventory WTI Oil NYMEX Gas Potential (Gross) Development (1) (2) (2) P+P Total (1) US/Bbl () US/MMbtu ()…
  7. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 7
    Grande Prairie Snapshot Operational Highlights 2018 Program: Drill two five-well pads at Karr; complete 1 pad Drill 23 wells; complete 6 wells at Wapiti Q1 2018 Sales: 28,398 Boe/d (51% liquids) Asset Summary Three Montney assets…
  8. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 8
    Karr Montney Asset Detail (1) Operational Highlights Wells on the 1-2 pad are drilled and awaiting completion; expected to produce Q3 2018 Wells on the 4-24 pad expected to rig release Q2 2018 and will be completed Q1 2019; expected…
  9. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 9
    Karr Montney P+P Type-Well (1) Karr West Unit Lateral Length = 3,000m Wellhead IP30 Boe/d 2,112 Proppant Loading = 1,565 lb/ft (2.3 t/m) Stages = 75 Wellhead IP30 Condensate % 67 Total Sales Gas Bcf 4.8 Total Sales Condensate…
  10. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 10
    Wapiti Montney Asset Detail (1) Operational Highlights 9-3 pad drilling has begun (total 11 wells in 2018) Additional 12 wells to be drilled from 5-3 pad Third party gas plant and infrastructure under construction with scheduled Q2…
  11. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 11
    Wapiti Montney P+P Type-Well (1) Wapiti Unit Wellhead IP30 Boe/d 2,159 Wellhead IP30 % 56 Condensate Total Sales Gas Bcf 4.9 Total Sales MBbl 500 Condensate Total Sales Volume MBoe 1,408 DCET (multi-well pad) MM…
  12. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 12
    Kaybob Snapshot (1) Operational Highlights 6 of 17 planned Montney wells have been drilled and put on production 9 of 15 planned Duvernay wells are rig released and expected to be on production in Q3 2018 Evaluating gas re-routing…
  13. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 13
    Kaybob Duvernay Asset Details (1) Operational Highlights Kaybob Smoky 10-35 pad: 4 wells drilled, expected to be brought on production Q3 2018 Kaybob South 7-22 pad: 5 wells rig released; expected to be on production Q3 2018 Special…
  14. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 14
    Kaybob Duvernay P+P Type-Well (1) Kaybob Smoky Unit Lateral Length = 2,700m Wellhead IP30 Boe/d 1,877 Proppant Loading = 2,000 lb/ft (3.0 t/m) Wellhead IP30 Condensate % 69 Total Sales Gas Bcf 2.2 Total Sales Condensate MBbl…
  15. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 15
    Kaybob Montney Oil Development (1) Operational Highlights 2018 activity: Six of the 17 Montney horizontal wells planned are completed and on production New well design incorporates a higher number of frac stages and increased…
  16. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 16
    (1) Kaybob Montney Oil P+P Type Well Kaybob Montney Unit Wellhead IP30 Boe/d 545 Wellhead IP30 Oil % 80 Total Sales Gas Bcf 0.6 Total Sales Oil/Condensate MBbl 154 Total Sales Volume MBoe 261 DCET (multi-well pad) MM 3.0…
  17. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 17
    Central Alberta & Other Snapshot (1) Operational Highlights 2018 Program: 1 hz Duvernay well rig released at Willesden Green 3 hz Glauconite wells planned at Leafland New well at 02/13-5-39-5W5 had a peak rate of 532 Bbl/d (total…
  18. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 18
    (1) Willesden Green Operational Highlights Horizontal well at 4-21 pad is rig released and expected to be completed and brought on production Q3 2018 Asset Potential Duvernay Shale Play 59,686 acres of land (100% WI) Drilled…
  19. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 19
    2018 Guidance 2018 Capex 600 million (excluding acquisitions & divestitures) Plan to drill 70 development wells and complete 42 of those wells 42 well completions represent 11% of PRLs P+P undeveloped locations (1) Drilling services…
  20. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 20
    Midstream & Marketing Strategy Midstream Portfolio Positioned for Growth Karr 06-18 Takeaway capacity secured to manage Montney and Duvernay growth plan through 2021 Owned and operated infrastructure coupled with 3rd party midstream…
  21. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 21
    Revenue/Boe(1) and AECO Revenue WTI NYMEX AECO BASIS PROPANE BUTANE ETHANE FX C/Boe US/Bbl US/mmbtu C/GJ US/mmbtu US/Bbl US/Bbl US/Bbl 2018 Budget 50.00 3.00 2.37 (1.00) 0.8000 21.88 35.31 12.28 29.55 May 7 2018 Strip 67.30 2.84…
  22. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 22
    Strategic and Long-Term Investments (1) Please refer to the heading Reserves and Other Information in the Advisories Appendix. (2) Publicly disclosed by competitor. 23
  23. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 23
    The New Paramount Intermediate E&P company with an extensive portfolio of liquids-rich unconventional plays and the financial strength to exploit those opportunities Significantly Expanded Reserves: 149 MMBoe PDP, 376 MMBoe Proved,…
  24. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 24
    Appendix: Additional Information
  25. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 25
    Performance (1) As evaluated by McDaniel & Associates Consultants Ltd. as of December 31, 2017. 26
  26. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 26
    Paramount Completion Evolution Technology and Fluid: Open Hole Packers and Energized Oil Lateral Length and Stage Spacing: Up to 1,600m and 100m (16 stages) Proppant Loading and Proppant Type: Up to 0.6 t/m (400 lbs/ft) and uniform…
  27. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 27
    Focus Assets Btax Breakeven 10% (1) (1) Breakeven analysis discounted at 10 percent before tax, based on internal type well assumptions using constant costs, FX rate of 0.80 US/C and AECO basis of US1.00/MMbtu. Breakeven gas prices…
  28. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 28
    Advisories Appendix
  29. June 2018 Corporate Presentation – Paramount Resources Ltd. – slide 29

From the store

Browse maps, data & reports in the Shale Experts store