Skip to main content August 2018 Enercom Conference – Plains All American Pipeline, L.P. Investor Presentation | Shale Experts
Loading...

August 2018 Enercom Conference – Plains All American Pipeline, L.P.

Plains All American Pipeline, L.P. · Aug 20, 2018 · 8 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. August 2018 Enercom Conference – Plains All American Pipeline, L.P. – slide 1
    The Oil & Gas Conference August 20, 2018 www.plainsallamerican.com NYSE: PAA & PAGP Denver, CO1
  2. August 2018 Enercom Conference – Plains All American Pipeline, L.P. – slide 2
    Over Past 20+ Years, PAA Has Developed One of the Largest and Most Integrated Midstream Systems in North America PAAs Crude Oil Value Chain Legend Plains Current Profile Volumes Handled(1): 5.2 mmb/d Transportation 1.2 mmb/d…
  3. August 2018 Enercom Conference – Plains All American Pipeline, L.P. – slide 3
    PAAs Permian System Unmatched Interconnectivity, Capabilities & Market Access PAAs Strategic Advantage Cushing 1. Flow Assurance 2. Long-haul & Intra-basin Memphis Market Optionality 3. Quality control from well Permian Basin head to…
  4. August 2018 Enercom Conference – Plains All American Pipeline, L.P. – slide 4
    PAAs Permian Gathering & Intra-basin Crude & Condensate Footprint Interconnectivity: Connectivity to each key liquidity point & long haul pipeline within the Basin COLORADO CITY Quality Control: Well head to MIDLAND end market…
  5. August 2018 Enercom Conference – Plains All American Pipeline, L.P. – slide 5
    PAA Permian Production Outlook Under Infrastructure Constrained Scenario mb/d 8,000 Permian Basin Oil Production Growth Scenario Illustration YE 2023 6,400mb/d 7,000 Delayed production growth due to Unconstrained Case infrastructure…
  6. August 2018 Enercom Conference – Plains All American Pipeline, L.P. – slide 6
    Potential Challenges to 2018/2019 Production Outlook Key variables to monitor Tight market Labor Monitoring: quality and availability of labor Oil: PAA expects capacity constraints for next 12-15 months Take-away NGL: sufficient…
  7. August 2018 Enercom Conference – Plains All American Pipeline, L.P. – slide 7
    Permian Basin Growth is Filling Existing Pipeline Capacity and Driving Demand for Greenfield Projects Mb/d Nameplate Capacity vs. Production 8,000 7,000 PAA/ExxonMobil EPIC 6,000 Gray Oak 5,000 Cactus II Announced/Under…
  8. August 2018 Enercom Conference – Plains All American Pipeline, L.P. – slide 8
    Permian Basin Takeaway Situation Overview Midstream Industry has responded to need for additional takeaway out of the Permian basin 3.0 mmb/d of takeaway capacity currently under construction or awaiting FID Majority of the capacity…

From the store

Browse maps, data & reports in the Shale Experts store