2 Current Status Aug 2018 Production Overview 2018 average production forecast of 267,500-275,000 boepd 2018 average liquid production of 50,000 bpd 2018 production exit estimate of 290,000-297,500 boepd. Three Major Core Areas…
3 Historical EP Performance Mar 2018 Production Growth Per Share* Reserves Growth Per Share* 350 9 Production per Thousand Shares Reserves per Share (BOEs) 300 8 7 250 6 200 5 (BOEs) 150 4 100 3 2 50 1 0 0 2009…
4 A History of Full Cycle Profitability Aug 2018 400 6.00 * 350 Earnings before taxes (000,000s) 5.00 AECO (CAD/mcf) Earnings before tax ( millions) 300 4.00 250 AECO (/mcf) 200 3.00 150 2.00 100 1.00…
5 Largest Canadian Gas Producers Mar 2018 1,800 2016A Natural Gas (Mmcf/d) 1,600 2017E Natural Gas (Mmcf/d) 1,400 2018E Natural Gas (Mmcf/d) 1,200 Production (Mmcf/d) Tourmaline is currently producing 1,000 between…
6 A Significant Liquids Producer May 2018 Tourmaline has doubled liquids production over the past 15 months with strong liquids growth across all three operated complexes. Condensate production will grow from current levels of 12,000…
7 Balanced Revenue and Cash Flow Streams Through Product, Marketing and Transportation Diversification Aug 2018 2018 BUDGETED REVENUE AECO & Station 2 14% Oil 29% Fixed Price 18% NGL 12% NYMEX Basis 7% NYMEX-Based…
8 Current 5 Year Plan(1) Aug 2018 400,000 350,000 300,000 250,000 Spirit River Boe/d 200,000 NEBC 150,000 Deep Basin 100,000 50,000 - 2016 2017 2018 2019 2020 2021 2022 After-tax After-tax E&P Capital Free Cash…
9 Alberta Deep Basin May 2018 T65 R9 R7 R5 Current Production 180,000-185,000 boepd Current Reserves 984.4 mmboe (Jan 1, 2018) T63 Tourmaline Land Base 1.77 million acres Drilling Inventory 2,322 locations (vertical) TCPL Main…
10 Tourmaline Deep Basin EP Performance Jul 2018 Top Alberta Viking Wells (March to May) Tourmaline consistently drills a significant proportion of the best performing new wells in the Alberta Deep Basin. The Company attributes…
11 Alberta Deep Basin Liquids Rich Cardium Fairway Aug 2018 The combination of extensive 3D seismic coverage T59 T59 and the lowest cost drilling/completion capability Smoky make the liquids rich Cardium play a significant new…
12 NEBC Montney Gas/Condensate Complex May 2018 Black Swan Current Prod. 350-360 mmcf/d TOU Land Comp. Station, dehy C-60-A Gas Plant 25 mmcf/d 7,500-8,500 bpd condensate TOU Wells 200 MMCF/D Q4 2019 Current Reserves 1,079.4…
13 Doe 2-11 Sweetening Facility Aug 2018 The 2-11 facility will allow an additional 17 existing liquid rich Montney turbidite wells to come on-stream in Oct 2018, adding 3,000-3,500 bpd of incremental condensate production.
14 Gundy Ck Montney Development Aug 2018 Gundy Black Swan Current Production: 13,000-15,000 BOEPD Construction of Phase 1 Deep Cut Comp. Station, dehy No of wells drilled by TOU: 28 Gas Plant has commenced in the field, 25 MMCF/D No…
15 Gundy Deep Cut Plant Construction Aug 2018 Gundy Sales Line Right of Way Phase 1 50,000 boepd deep cut facility is on schedule for a Q3 2019 start-up. Phase 1 construction designed to facilitate the potential Phase 2…
16 Tourmaline Long Term NEBC Montney Growth Aug 2018 200,000 Sundown Tourmaline can grow to a 200,000 boepd NEBC Phase One Montney producer within the current 5 year plan Development 175,000 time frame. Gundy Phase Two and…
17 Peace River High Complex Triassic Oil Charlie Lake and Montney Plays Mar 2018 Mulligan 8-15 Upper Trcl Pad Q3 2016 Peace River High Charlie Lake Play 90 day production rates R. 11 R. 9 5-14 R. Mulligan 7 R. 5 Oil Battery…
18 Tourmaline Condensate Production Outlook 2018-2020 Jun 2018 35,000 Current Base 31,500(+) Production totals reflect anticipated Deep Basin Kca (750 bpd) 30,000 total condensate production by the end of the specified period.…
19 Tourmaline Mid-Stream Assets Sep 2017 The infrastructure skeleton in all three core operated complexes is now complete. This infrastructure is essentially R. 15W6 R. 1W6 all newR.and 15W5in the growth areas of the WCSB. NE…
18 Independently Recognized Canadian 2P Reserves May 2018 12 Tourmaline has booked only 14% of 10 Natural Gas (1) existing drilling inventory (2,074 of 8 14,471 locations See Schedule A). TCF 6 4 2 1000 0 800…
22 Gas Development Location Inventory and Economics Mar 2018 AB Deep Basin Outer Foothills AB Deep Basin B.C. Montney Charlie Lake Vertical Vertical Horizontal Horizontal Horizontal Total Well Costs 2.55 3.70 3.85 3.05 2.10 (Drill,…
23 The TOU Engineering Execution Machine Sep 2017 Drill & Complete Costs 8.00 Tourmaline has the lowest completed per stage (Equipping not included) well costs in the overall Montney play in 7.00 Western Canada and the Alberta…
25 2018 Guidance Aug 2018 2018(1) Production Boe/d 267,500 - 275,000 Cash Flow(i) - MM 1,343 CFPS - Diluted(i) 4.94 E&P Capital Program(ii) - MM (net of non-core dispositions) 1,082 Free Cash Flow(iii) - MM 232 Exit…
26 2018 Natural Gas Transportation and Marketing Overview Aug 2018 2018 Natural Gas Portfolio Diversification 2018 Exit: 440 mmcf/d of gas will be to US/Other Markets 2019 Exit: 540 mmcf/d of gas will be to US/Other Markets…
27 2017 Highlights/2018 Outlook Mar 2018 Tourmaline now a Senior with production exceeding 270,000 boepd. Tourmaline is currently the second largest producer of Canadian natural gas and is a top ten Canadian liquids producer…
APPENDIX
29 Natural Gas Flows From Western Canada
30 Completed Well Costs and EUR By N. American Play Type Aug 2017 Well Costs (CAD) Vs. EUR by Play Type 25 0.47/mcf Completed Well Cost CDN EUR (Bcfe) 20.5 Bcfe 0.69/mcf 20 17.9 Bcfe 15 0.70/mcf 12.3 MM 12.5 Bcfe…
31 Tourmaline vs Natural Gas Peers Cash Costs Per BOE July 2017 Tourmaline Vs. Natural Gas Weighted Peers Cash Costs in USD* per BOE (Q1/17) Operating Transportation G&A Interest 12.00 10.26 10.00 1.45 8.00 7.15 1.54 Costs…
32 Gundy Horizontal Well Performance Aug 2018
33 Historical Drilling Performance and Cost Improvements Mar 2017 South Deep Basin Peace River High Average Drill Days Average Drill Cost Average Drill Days Average Drill Cost 3.0 35 57% 49% 20 41% 36% 5.0 2.5 30 Decrease…
34 Historical Completions Performance Improvements Deep Basin - Completions Peace River High - Completions 3,000 3,500 47% 3,000 72% 2,500 Decrease Since 2012 Decrease Since 2012 2,500 2,000 2,000 000 000 1,500…
36 EP Growth Plan (Original Business Plan) Sept 2008 This is essentially the same business plan that was executed for Duvernay Oil Corp. (2001-2008) Primary growth mechanism will be a conventional EP Program (including Resource…
37 Banshee Alberta Gas Plant Simple, easy to construct dew point plants tied to the main TCPL sales system Total cost (2 phases) of 80M, capacity of 130 mmcfpd with enhanced liquids recovery capability
39 Tourmaline Environmental Performance Tourmaline strives to continually improve all aspects of environmental performance including the impact of its operations on air, land and water. Tourmaline ranks as a top decile performer…
40 GHG Emissions Peer Comparison Jul 2018 Tourmaline has the lowest GHG emissions intensity (CO2/boe) among Canadian Senior E&P peers Canadian E&P GHG Emissions 2016 25,000,000 0.080 0.070 20,000,000 0.060 (tonnes…
41 BC Water Management 100% of all water flowed back from completion operations is recycled 90% of all water sourced for stimulation operations is recycled 187,000m3 of produced water storage capacity 3 produced water ponds…
42 Natural Gas Substitution in Operations Raw Natural Gas cost (Feb 2017) 0.10/DLE (Diesel Equivalent Liter) vs 0.69/L rack price for marked diesel 12 Drilling Rigs and all BC completion operations use a combination of NG/Diesel…
43 Tourmaline Technology Curve/Future Concepts, Requirements & Opportunities Cost saving via novel frac water sourcing/recycling Alternative hz frac programs/processes Concurrent pairs, delayed flow-backs etc. Novel drilling…
44 Schedule A DRILLING LOCATIONS Estimated Drilling Inventory This presentation discloses drilling locations in four categories: (i) proved undeveloped locations; (ii) probable undeveloped locations; (iii) unbooked locations; and…
45 Schedule A continued Deep Basin Vertical well count : Approximately 2,767 gross prospective sections at approximately 1.5 wells per section minus 10% for areas that are inaccessible or limited by spacing requirements minus…