Skip to main content May 2019 Investor Presentation – Calima Energy Inc. | Shale Experts
Loading...

May 2019 Investor Presentation – Calima Energy Inc.

Calima Energy Inc. · May 30, 2019 · 50 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. May 2019 Investor Presentation – Calima Energy Inc. – slide 1
    I N V E S TO R P R E S E N TAT I O N M AY 2 0 1 9
  2. May 2019 Investor Presentation – Calima Energy Inc. – slide 2
    Disclaimer This presentation has been prepared by Calima Energy Limited (Company), based This presentation is presented for informational purposes only. It is not intended on information available as at the date of this presentation. The…
  3. May 2019 Investor Presentation – Calima Energy Inc. – slide 3
    Introduction C A P I TA L S T R U C T U R E Listed on the ASX (CE1 AU), Calima Ordinary Shares 1,444 M Management Perf. Equity(1) 55.5 M Energy is a Canadian energy junior Market Capitalisation(2) 40 M with 72,000 acres of Montney…
  4. May 2019 Investor Presentation – Calima Energy Inc. – slide 4
    Company Snapshot Predicted a northern extension to the liquids rich Montney fairway in NE BC in 2014 Built a 72,000-acre land position and drilled three wells in 2019 to validate the prediction Assembling the building blocks for future…
  5. May 2019 Investor Presentation – Calima Energy Inc. – slide 5
    Western Canada POISED FOR GROWTH THROUGH LNG Strong demand for condensate in Western Canada - pricing close to WTI International Energy Agency predicts global natural gas consumption to grow by 45% over the next 25 years Montney gas…
  6. May 2019 Investor Presentation – Calima Energy Inc. – slide 6
    Calima B U I L D I N G B L O C K S T O VA L U E On going discussions to connect to nearby infrastructure in an Assembling the building blocks of a world-class existing field via a 20 km pipeline. development project with minimal…
  7. May 2019 Investor Presentation – Calima Energy Inc. – slide 7
    Well Performance A D J A C E N T O P E R AT O R P R O V I D E S A N A L O G U E F O R C A L I M A Saguaro Resources has drilled more than 60 wells in the acreage immediately adjacent to Calima (1) (2) Saguaro results provide a direct…
  8. May 2019 Investor Presentation – Calima Energy Inc. – slide 8
    Drilling Operations Calima-1 - Vertical pilot hole, logged and cored (230m entire Montney) Calima-2 - 2,500 m horizontal future producer Calima-3 2,500 m horizontal future producer 92 stage frac, 30m spacing, 1.5t/m proppant…
  9. May 2019 Investor Presentation – Calima Energy Inc. – slide 9
    Drilling Results PROVED EXTENSION OF THE LIQUIDS RICH MONTNEY Objective CALIMA 1. Stratigraphy 2. Reservoir Quality 3. Condensate 4. Hydrocarbon Sat. 5. Illus. Gas-In-Place 6. Production Rate (1) 7. Cond/Gas Ratio (2) 8. Type…
  10. May 2019 Investor Presentation – Calima Energy Inc. – slide 10
    Reserves Report 2018 McDANIEL & ASSOCIATES BEST ESTIMATE U P D AT E A N D U P G R A D E S D U E J U N E 2 0 1 9 GROSS UNRISKED PROSPECTIVE RESOURCES (1) McDaniel & Associates have been commissioned to update the March 2018 reserves…
  11. May 2019 Investor Presentation – Calima Energy Inc. – slide 11
    Economics SINGLE WELL KEY ASSUMPTIONS Estimated Ultimate Recovery(1) (per well) Natural Gas 7.19 bcf Condensate 280,000 bbl Natural Gas Liquids 120,000 bbl TOTAL 1,598,400 boe Well Cost (2) CAD Drilling 2,000,000 Completion…
  12. May 2019 Investor Presentation – Calima Energy Inc. – slide 12
    Development concept Conceptual Tie into adjacent field infrastructure(2020) Development Tie into Brookfield NorthRiver (2020) Condensate A tie-in pipeline to adjacent field infrastructure could Calima Pad-4 (2037) Delivery to…
  13. May 2019 Investor Presentation – Calima Energy Inc. – slide 13
    Create Built a 72,000 acre Montney land position in NE BC 1 Drilled 3 wells to prove extension of liquids rich Montney fairway Well performance matches or exceeds adjacent Operators Initial rate 1,600 boepd Build ROADMAP Well results…
  14. May 2019 Investor Presentation – Calima Energy Inc. – slide 14
    Conclusion Drilling programme met or exceeded expectation and will result in an updated reserve report June 2019. The building blocks for an 10,000 boepd development plan can be put in place with limited additional investment…
  15. May 2019 Investor Presentation – Calima Energy Inc. – slide 15
    I N V E S TO R P R E S E N TAT I O N APPENDICES M AY 2 0 1 9
  16. May 2019 Investor Presentation – Calima Energy Inc. – slide 16
    Disclaimer This presentation has been prepared by Calima Energy Limited (Company), based This presentation is presented for informational purposes only. It is not intended on information available as at the date of this presentation. The…
  17. May 2019 Investor Presentation – Calima Energy Inc. – slide 17
    A PPE N DIX O N E - D R ILLING R ES ULTS
  18. May 2019 Investor Presentation – Calima Energy Inc. – slide 18
    2019 Drilling Horizontal NW Upper Horizontal SE Upper Core Interval Calima-3 Calima-2 Calima-1 Drilled 1 x vertical well and 2 x horizontal well Collected core and wireline logs over the whole Montney section…
  19. May 2019 Investor Presentation – Calima Energy Inc. – slide 19
    Calima-1 Vertical Well Demonstrated that the Montney geology across the Calima Lands is very similar to Saguaros Presence of gas and condensate confirmed by laboratory analysis of core samples Porosity and hydrocarbon saturation…
  20. May 2019 Investor Presentation – Calima Energy Inc. – slide 20
    Drilling Performance Time vs Depth Relationship with CWL Energy provides operations support CWL has experience with most other Operators in the region Permitting Stakeholder relationships. Site construction Calima-2…
  21. May 2019 Investor Presentation – Calima Energy Inc. – slide 21
    Production Testing Calima - 2 Results Maximum gas rate 10.2 mmcf/d Maximum liquid rate 151 bbl/d at gas rate of 8.4 mmcf/d In analysing the results Michael Morgan, Director of Analytics at GLJ Petroleum Consultants in Calgary…
  22. May 2019 Investor Presentation – Calima Energy Inc. – slide 22
    Log Analysis Peer Group Comparison Log analysis of peer group wells highlights the superior reservoir parameters encountered at Calima-1 at all Montney intervals specifically Porosity and Hydrocarbon Saturation Porosity is a…
  23. May 2019 Investor Presentation – Calima Energy Inc. – slide 23
    Condensate Gas Ratio Calima - 2 Calima-2 Variation In Condensate Gas Ratio(1) While Testing After the initial clean out period the condensate gas ratio (CGR) climbed steadily This is in-line with other wells in the area where…
  24. May 2019 Investor Presentation – Calima Energy Inc. – slide 24
    Oil Saturation Core Analysis Calima-1 Core analysis shows that the Calima-1 well has higher oil saturations than cores collected from adjacent wells (1) Oil saturations of up to 59% (Upper Montney) and 64% (Middle Montney) were…
  25. May 2019 Investor Presentation – Calima Energy Inc. – slide 25
    Calima2: Peer IP 30 and CGR Results IP30 Gas vs Condensate Gas Ratio Calima-2 Test Results Wells within 50 km of Calima sourced from IHS Accumap Public domain data from wells within a 50 km radius of Calima show variation in…
  26. May 2019 Investor Presentation – Calima Energy Inc. – slide 26
    Calima3: Off To A Strong Start Cumulative Production Calima-2 & 3 Test Results Calima-3 started flowing at a faster rate than Calima-2 Sand blockages were cleared using coiled tubing in the normal manner Warm weather resulted…
  27. May 2019 Investor Presentation – Calima Energy Inc. – slide 27
    Gas Analysis The adjacent Operator report that liquids recovered at the well-head account for approximately half of the total recovered liquids. These well-head liquids are dominated by Condensate/light oil (C5+) A comparable amount…
  28. May 2019 Investor Presentation – Calima Energy Inc. – slide 28
    Original Mapping Liquids Yield Regional Mapping (2014) Calimas original sweet spot mapping in 2014 predicted liquids potential in the north, beyond the known limits of the Montney play Calima built a land position in the north…
  29. May 2019 Investor Presentation – Calima Energy Inc. – slide 29
    Gas Analysis (1) (2) (3) Matches offset operator Exceeds offset operator Calimas 2019 drilling (1 x vertical, 2x horizontal) demonstrated that the prospectivity encountered by Saguaro extends into the Calima Lands…
  30. May 2019 Investor Presentation – Calima Energy Inc. – slide 30
    A PPE N DI X TWO - 2 0 1 8 R ES E RV E AUD ITO RS R E PO RT
  31. May 2019 Investor Presentation – Calima Energy Inc. – slide 31
    Resource Audit B Y M C D A N I E L & A S S O C I AT E S ( 1 ) Calima Lands Calima Lands McDaniel estimates based on 400 locations Gross Net using 70% of available drainage area Natural Gas (Tcf) 2.16 1.69 Assumes a two layer…
  32. May 2019 Investor Presentation – Calima Energy Inc. – slide 32
    A PPE N DI X TH R E E CO N CEPTUA L D E V ELOPMENT M O D EL
  33. May 2019 Investor Presentation – Calima Energy Inc. – slide 33
    Development concept Tie into adjacent field Conceptual infrastructure (2020) Tie into Brookfield Development NorthRiver (2020) Condensate Calima Pad-4 (2037) Delivery to A tie-in pipeline to adjacent field Jedney Calima…
  34. May 2019 Investor Presentation – Calima Energy Inc. – slide 34
    Conceptual Development Assumptions 1 Production Inputs Operating Inputs 1 Production Profile 8 BCF curve max flow of 5700 Mcfd per well T-North Transportation toll 0.24/GJ Condensate ratio 25 bbl/MMcfd Processing costs to Station 2…
  35. May 2019 Investor Presentation – Calima Energy Inc. – slide 35
    Conceptual Development Assumptions 2 Assumptions. Forward looking statements or information are based on a number of factors and assumptions which have been used to develop such statements and information but which may prove to be…
  36. May 2019 Investor Presentation – Calima Energy Inc. – slide 36
    Conceptual Development Assumptions 3 Definitions Certain oil and gas metrics. Finding, development and acquisition costs, finding and development costs, and netbacks do not have standardized meanings or standard methods of…
  37. May 2019 Investor Presentation – Calima Energy Inc. – slide 37
    A PPE N DI X FO UR HISTO RY, B OA R D & M A N AGEM ENT
  38. May 2019 Investor Presentation – Calima Energy Inc. – slide 38
    Calima Board Alan Stein Jonathan Taylor Managing Director Technical Director Dr Stein has more than 30 years experience in the international oil and Mr Taylor has more than 30 years experience in the international oil gas industry.…
  39. May 2019 Investor Presentation – Calima Energy Inc. – slide 39
    Calima Management Mike Dobovich Justin Norris Country Manager (Canada) Montney Sub-Surface Project Leader Mr Norris is a geophysicist with over 20 years of experience in the Mr Dobovich has over 20 years of experience in the oil and…
  40. May 2019 Investor Presentation – Calima Energy Inc. – slide 40
    Calima Historical Pathway 2014-2016 2017 2018 2019 (Q1) Remapping the liquids Fold the farmin deal into Construction of drilling pad Drill one vertical and two potential of the Montney by Azonto Petroleum horizontal wells TMK…
  41. May 2019 Investor Presentation – Calima Energy Inc. – slide 41
    A PPE N DIX F IV E - BACKGROUND
  42. May 2019 Investor Presentation – Calima Energy Inc. – slide 42
    The Montney Today Biggest oil and gas play in Canada which ranks alongside the best of the US plays 4 C5 billion per year upstream investment and active M&A market 2 Estimated remaining reserves as at 2014 - 449 tcf of gas and…
  43. May 2019 Investor Presentation – Calima Energy Inc. – slide 43
    Montney Gas C U R R E N T LY S O L D I N A M E R I C A B U T Montney gas currently sold in North American markets Production at 7bcf/d has outgrown pipeline capacity Montney gas has been priced at a steep discount to Henry Hub…
  44. May 2019 Investor Presentation – Calima Energy Inc. – slide 44
    Shell - LNG Canada C40 billion to be invested by LNG Canada, a LNG Canada, Kitimat BC consortium operated by Shell, in an LNG terminal at Kitimat on the west coast of Canada Biggest ever infrastructure project in Canada 13 mtpa…
  45. May 2019 Investor Presentation – Calima Energy Inc. – slide 45
    Chevron & Woodside - Kitimat LNG Kitimat LNG, Canada, BC The proposed Kitimat LNG project, is a Chevron operated join venture with Woodside Energy to be constructed at Bish Cove, near the town of Kitimat on Canadas West Coast Woodside…
  46. May 2019 Investor Presentation – Calima Energy Inc. – slide 46
    Canadian LNG Projects Summary 145.5mpta (19bcf/d) 37.5mpta (4.9bcf/d) When Shell and Partners announced an FID for their LNG Canada project in October 2018, it was the first greenfield liquefaction project to be sanctioned in…
  47. May 2019 Investor Presentation – Calima Energy Inc. – slide 47
    Canadian LNG Projects Location 47
  48. May 2019 Investor Presentation – Calima Energy Inc. – slide 48
    Next Wave Of LNG Global natural gas consumption is set to grow by 45% over the next 25 years (CERI, 2019) To meet this demand, the Liquified Natural Gas (LNG) narrative is set to garner significantly more attention through 2019 with…
  49. May 2019 Investor Presentation – Calima Energy Inc. – slide 49
    Canadas LNG Opportunity - Shipping Shipping Distances to Asian Markets (Right) Source: sea-distances.org, and Haywood Securities LNG Value Chain Costs as % of Total Costs (Left) and LNG Value LNG Ship Charter Rate Chain Variance…
  50. May 2019 Investor Presentation – Calima Energy Inc. – slide 50
    Notes 50

From the store

Browse maps, data & reports in the Shale Experts store