Skip to main content November 2019 Corporate Presentation – Cequence Energy Ltd. | Shale Experts
Loading...

November 2019 Corporate Presentation – Cequence Energy Ltd.

Cequence Energy Ltd. · Nov 15, 2019 · 19 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 1
    Cequence Energy Ltd. November 15, 2019 TSX:CQE 1
  2. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 2
    10.0 million pre-payment of the 60.0 million Repaid Term Loan RECAPITALIZE Amended the Term Loan AND Extend maturity by 1 year to Oct 3, 2023 IMPROVED Fix interest rate at 5% eliminating escalation to Improve BALANCE 10% when…
  3. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 3
    (000s, except per share, ratios, production and per unit references) Common shares outstanding at September 30, 2019 41,784 Closing share price November 15, 2019 0.18 CORPORATE 52 week share price trading range - September 30, 2019…
  4. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 4
    Investing in higher return commodities Dunvegan oil 100% CQE inventory Oil Encouraging third party oil activity in other Montney benches WHY INVEST IN CEQUENCE Large gas reserve with significant upside 112 MMboe of proved plus…
  5. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 5
    All 3 Pools have similar OOIP/section ranges of 6-15 MMBOE Simonette & Karr on primary solution gas drive Kaybob South operator has initiated a pilot secondary recovery waterflood scheme 06-06 1st Hz producer converted to injector…
  6. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 6
    Dunvegan 2018 YE Bookings (1) (2) PUD Probable Unbooked Locations Q4 2018 Rig Releases Drill Ready Locations 04-08 vertical 100% WI lands 50% CQE IP30: 45 BOPD 5-7 facility 2,000 bbls/d 15-04 740 Hp 16-02 Compressor 10-04…
  7. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 7
    SIMONETTE DUNVEGAN Strong Well Results LIGHT OIL Actual well costs 4-4.5 MM/well: Target 2,000 m laterals, 40-50 frac stages (Tighter frac spacing) 09-11, 15-04, 12-14 each paid out in under one year PERFORMANCE Oil moving through 50%…
  8. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 8
    Capital Sensitivity Internal CQE 2,000 m well model 60 WTI US/bbl, 5 US/Edmonton differential, 0.75 CAD/US exchange 1.50 CAD/GJ AECO MRF Alberta Crown Royalties DUNVEGAN OIL SENSITIVITIES TO CAPITAL AND COMMODITY PRICE Price…
  9. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 9
    SIMONETTE MONTNEY 100/11-16-061-27W5M 07-15 Lwr Mont Producer Nordegg Historical Upper CQE Hz Montney placement 15-13 Lwr Mont 3rd Party Lwr Mont Feb 19 cal day oil Test Spud Aug 16/19 rate: 672 bbl/d CQE Montney: 140m…
  10. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 10
    100/11-16-061-27W5M Nordegg MONTNEY OIL Upper AND LIQUIDS Montney DISTRIBUTION Lower Montney Paleozoic Most Industry activity is in the liquid rich gas phase Oil is expanding in multiple benches continuing up into…
  11. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 11
    100/11-16-061-27W5M Nordegg Upper Montney LOWER MONTNEY OIL AND LIQUIDS DISTRIBUTION Lower Montney Paleozoic Lower Montney activity is typically less mature than other Montney benches Oil has been a significant…
  12. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 12
    Cequence Alliance Meter Station Capacity 120 MMcf/d Pembina Lator Truck Terminal CQE 9-10 Field Compressor Alliance/Aux Sable Deep Cut Plant SIMONETTE EGRESS Proposed Pembina Simonette Terminal Chicago, Illinois NGTL…
  13. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 13
    East West 60 WTI, 1.50/GJ CDN, 5/bbl diff Montney (1) Montney Costs (Drill, Complete, Equip) (MM) 8.0 8.0 Drilling Results IP30 Production Rate (MMcf/d) 8.5 4.0 Reserves (MBOE) 1,650 1,050 LARGE ORGIP (Bcf) 8.5 4.3 RECOGNIZED…
  14. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 14
    Capital Sensitivity Internal CQE East & West models 60 WTI US/bbl, 5 US/Edmonton differential, 0.75 CAD/US exchange 1.50 CAD/GJ AECO UPPER MONTNEY ECONOMIC SENSITIVITIES TORQUE TO GAS PRICES ABOVE 2.00 CAD/GJ Price Sensitivity…
  15. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 15
    Contract Type Volume Price (Cdn) GAS GJ/d HEDGING 2019 October 1, 2019 October 31, 2019 Swap 5,000 1.37/GJ AECO 2019/20 Nov 1, 2019 March 31, 2020 Swap 5,000 2.11/GJ AECO & OIL bbl/d MARKETING 2019 October 1, 2019 December 31,…
  16. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 16
    Developing highly commercial Dunvegan oil - 100% CQE lands 112 MMboe recognized proved and probable Montney reserves(1) with WHY INVEST IN torque to improving gas prices CEQUENCE Emerging upside oil opportunities in other Montney…
  17. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 17
    APPENDIX 18
  18. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 18
    Todd Brown CEO MANAGEMENT Management Allan Mowbray VP Finance and CFO AND BOARD Dave Robinson VP Ex and Chief Geologist Team Chris Soby VP Land and Corporate Development Erin Thorson Controller Don Archibald Chairman Peter…
  19. November 2019 Corporate Presentation – Cequence Energy Ltd. – slide 19
    www.cequence-energy.com Contacts: Todd Brown Allan Mowbray 1400, 215 9th Ave S.W. Calgary AB T2P 1K3 CEO VP Finance and CFO Phone: 403-229-3050 Fax: 403-229-0603 tbrowncequence-energy.com amowbraycequence-energy.com TSX:CQE TSX:CQE 21

From the store

Browse maps, data & reports in the Shale Experts store