March 2019 Investor Presentation – Birchcliff Energy Ltd.

Birchcliff Energy Ltd. · Mar 14, 2019 · 62 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 1
    CORPORATE PRESENTATION March 13, 2019
  2. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 2
    PEOPLE, FOCUS & EXECUTION 2
  3. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 3
    Corporate Snapshot & Select Guidance Q4 2018 average production 76,408 boe/d 2018 annual average production 77,096 boe/d 2018 adjusted funds flow (millions / per share) 312.9 / 1.18 per share 2018 net income to common shareholders…
  4. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 4
    FULL YEAR 2018 HIGHLIGHTS Annual average production of 77,096 boe/d, a 13% increase from 67,963 boe/d in 2017 Annual adjusted fund flow of 312.9 million (1.18/basic common share), a 2% decrease from 317.7 million (1.20/basic common…
  5. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 5
    INVESTMENT HIGHLIGHTS Focused assets in the Peace River Arch Area of Alberta on the Montney/Doig Resource Play Essentially 100% working interest; 99% of production is operated Large, contiguous undeveloped land base with an average…
  6. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 6
    STRATEGIC LAND ACQUISITION Key Strategic Attributes 18 gross (15.1 net) Montney sections adjacent to existing BIR infrastructure Potential for 4 Montney intervals (Montney D1, D2, C, Basal Doig/Upper Montney) Strong anticipated…
  7. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 7
    STRATEGIC LAND ACQUISITION CONTD The acquisition provides a rare opportunity to acquire a large contiguous land block in proximity to BIR 3-22 plant as there is currently no open Crown available Extends liquids production fairway in…
  8. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 8
    BIRCHCLIFFS HISTORY A Track Record of Execution
  9. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 9
    KEYS TO SUCCESS Executives Executiveswith withproven proventrack trackrecord, record,continuity continuitysince sinceinception inceptionand andsignificant significantownership ownership Management Highly Highly experienced…
  10. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 10
    PRODUCTION HISTORY 90,000 76,000 80,000 77,096 78,000 Compound per-share production growth of 12% per year since 2005. 70,000 67,963 (14% since PC Gas Plant Phase I Average Production (boe/d) Completion) 60,000 49,236…
  11. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 11
    BIRCHCLIFF CORPORATE DECLINE(1) Long life, low decline asset allows for smaller capital wedge YoY needed to maintain Corporate Production (boe/d) volumes 20% Decline 19% Decline 20052018 2019 2020 (1) Production…
  12. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 12
    CORPORATE RESERVES 1,200,000 7,000 PDP - Reserves 1,100,000 TP - Reserves 2P - Reserves 6,000 1,000,000 PDP - NPV10 On a per share basis PDP, 1P and 2P 900,000 TP - NPV10 reserves have increased at a compound 5,000 2P - NPV10…
  13. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 13
    PROVEN TRACK RECORD AS A LOW COST PRODUCER 5 Year Profitability Breakdown: 2014 2015 2016 2017 2018 Average Average AECO (CAD/GJ) 4.27 2.55 2.05 2.04 1.42 2.47 Average WTI (USD/bbl) 92.99 48.80 43.32 50.95 64.77 60.17 P&NG Revenue…
  14. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 14
    PROVEN TRACK RECORD AS A LOW COST FINDER 16 PDP F&D 1P F&D 2P F&D Adjusted Funds Flow 12 1.8x 1.8x 1.9x netback recycle F&D Cost (/boe) ratios 8 1.3x 1.6x 1.4x 1.6x 1.8x 1.3x 2.0x 2.1x 2.4x 4 1.7x 1.8x 4.7x 7.3x 17.4x…
  15. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 15
    LOOKING FORWARD 2019 Plans & Beyond
  16. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 16
    2019 CAPITAL PROGRAM THEMES In 2019, Birchcliff is targeting its total capital expenditures to be less than its adjusted funds flow. Free funds flow is estimated to be 126 MMin 2019(1)(2) 2019 annual average production guidance is for…
  17. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 17
    2019 CAPITAL PROGRAM DETAILS 2019 F&D CAPITAL PROGRAM Drilling & Development Gross Wells Net Wells Capital (MM) (1)(2) Pouce Coupe Montney D1 Horizontal Natural Gas Wells 6 6.0 34.8 Montney D2 Horizontal Natural Gas Wells 2 2.0 11.4…
  18. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 18
    2018 NATURAL GAS MARKETING AECO Q1 Q2 Q3 Q4 YTD 1.96 1.10 1.12 1.45 1.39 0.03 0.02 0.02 0.02 0.02 0.24 0.25 0.23 0.26 0.25 1.68 0.83 0.87 1.17 1.12 265,000 GJ/d 61% 31% 8% 132,000 GJ/d Dawn 33,300 GJ/d Q1 Q2 Q3 Q4 YTD…
  19. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 19
    2019E NATURAL GAS MARKETING March 13, 2019 AECO 1.65 0.04 0.36 1.26 146,000 GJ/d 35% 39% 1% 163,000 GJ/d Dawn 3.40 6,000 GJ/d 0.14 Alliance 1.20 25% 2.06 2.00 0.04 0.32 105,000 GJ/d 1.64 Note: All Birchcliff gas…
  20. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 20
    RISK MANAGEMENT, HEDGING & DIVERSIFICATION In 2019, approximately 65% of Birchcliffs natural gas production will effectively be sold at prices that are not based on AECO (based on 2019 production guidance of 76,000 - 78,000 BOE/d)…
  21. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 21
    BORROWING BASE DETAILS Birchcliff has extendible revolving credit facilities in the aggregate principal amount of 950 million, which are comprised of an extendible revolving syndicated term credit facility of 850 million and an…
  22. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 22
    MONTNEY/DOIG RESOURCE PLAY A Significant Position in a World Class Play
  23. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 23
    MONTNEY/DOIG - A WORLD CLASS RESOURCE PLAY Resource density. Stacked resource up to 300 metres thick. Large areal extent. Extends over 50,000 square miles. Exceptional fracability. Low clay Birchcliff Montney/Doig content, low Poissons…
  24. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 24
    MONTNEY/DOIG MINEROLOGY LEADS TO EXCELLENT FRACABILITY The Montney/Doig Resource Play rock type is composed of a Some other Resource Plays have a high percentage of clays high percentage of hard minerals, and a low percentage of and…
  25. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 25
    BIRCHCLIFF MONTNEY/DOIG RESOURCE PLAY The Gordondale Acquisition added a fourth commercial development interval in the Montney D2 Large contiguous land base with 367.4 sections prospective for the Montney/Doig as at December 31,…
  26. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 26
    STACKED RESOURCE PROVIDES SUBSTANTIAL FUTURE UPSIDE 27
  27. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 27
    MONTNEY/DOIG MULTI LAYER OPPORTUNITY 3 2 1 4 5 6 5 6 4 3 2 1 28
  28. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 28
    BIRCHCLIFF MONTNEY/DOIG INVENTORY 29
  29. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 29
    PROXIMAL TO INFRASTRUCTURE WITH LONG TERM EXPOSURE TO LNG EXPORT Montney/Doig Birchcliff Pouce Coupe Production Montney/Doig & PC Gas Plant Owned Infrastructure PC Gas Plant Nova Pipeline System North American Market…
  30. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 30
    POUCE COUPE OVERVIEW Proven asset in development phase Wells show high initial deliverability, low terminal decline and stable long term production Predictable results with improving gas rates & liquids yields 100% owned and…
  31. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 31
    CONTINUED NATURAL GAS RATE IMPROVEMENT OF WELLS ONSTREAM: 2015 30 2016 14 2017 37 2018 15 2018 Wells choked due to PC Gas Plant being full 32
  32. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 32
    CONTINUED CONDENSATE RATE IMPROVEMENT During 2018 Birchcliff specifically targeted condensate- rich natural gas wells in Pouce Coupe, which has materially impacted the amount of liquids (primarily condensate) being produced at the…
  33. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 33
    CONTINUED COST AND DESIGN REFINEMENT Both Pouce Coupe and Gordondale have moved to increased frac intensity to maximize oil and condensate rates Overall well costs have slightly increased due to increased frac intensity 34
  34. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 34
    POUCE COUPE 2019 LIQUIDS TYPE CURVE 4500 Rate of Return (%) 4000 WTI (US/bbl) 55/bbl 60/bbl 65/bbl 3500 1.50/GJ 36% 41% 45% Sales Gas Rate (Mcf/d) AECO 2.00/GJ 53% 58% 63% 3000 2.50/GJ 72% 77% 83% 2500 NPV 10% (MM) WTI…
  35. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 35
    GORDONDALE OVERVIEW Acquired in 2016, Gordondale consolidated a sizeable and contiguous land base within Birchcliffs existing core area High oil & NGLs weighting Strategic infrastructure Low base decline production High quality…
  36. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 36
    GORDONDALE KEY INFRASTRUCTURE Key Natural Gas Processing Infrastructure Existing infrastructure has already AltaGas Gordondale CNRL Progress Sour Deep Cut Gas Plant Sour Shallow Cut Gas Plant supported peak production of…
  37. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 37
    GORDONDALE BASE PRODUCTION HISTORY Last well drilled in 2014 (on-stream Birchcliff Scheduled 40,000 2015) with peak production of Acquisition AltaGas Plant 35,000 boe/d (22,000 BOE/d) Turnaround 35,000 2018 AltaGas Deep Cut Plant…
  38. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 38
    GORDONDALE 2019 D1 & D2 OIL TYPE CURVES D1 Tier 1 Type Curve D2 Tier 1 Type Curve D2 Tier 1 Rate of Return (%) WTI (US/bbl) 450 55/bbl 60/bbl 65/bbl 1.50/GJ 69% 87% 106% 400 AECO 2.00/GJ 81% 99% 119% 350 2.50/GJ 93% 113% 134%…
  39. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 39
    2017 LIQUIDS SUMMARY 2017 Well Rates (IP60 Avg. Per Well) BUILDING ON THE GORDONDALE ACQUISITION GORDONDALE: CRUDE OIL Excellent Lower Montney oil inventory in D1 and D2 intervals Engineered completions drive recovery factor…
  40. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 40
    2018 LIQUIDS SUMMARY 2018 Well Rates (IP60 Avg. Per Well) FURTHER REFINING OUR LIQUIDS STRATEGY GORDONDALE: CRUDE OIL Strong Montney D2 oil and total boe test rates Strong Montney D1 oil and total boe test rates Further refinements…
  41. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 41
    2019 LIQUIDS SUMMARY 2019 Well Rates (IP rates noted by pad) CONTINUED PURSUIT OF INCREASED LIQUIDS GORDONDALE: CRUDE OIL Successful delineation of the Montney D1 and D2 oil trends to the south Significant Montney D1 and D2 results…
  42. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 42
    ELMWORTH DEVELOPMENT Received regulatory approval for an Second Exploration acid gas injection well in August 2016 Horizontal Preliminary planning underway for a 100% owned and operated 40 MMcf/d natural gas processing plant;…
  43. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 43
    CONCEPTUAL MONTNEY/DOIG FIELD DEVELOPMENT MODEL STATUS OF MODEL CALIBRATION AND DERISKING FACIES & PETROPHYSICAL G EOLOG I C A L, GEOPHYSI CAL, G E O M E C H A N C A L HYDRAULIC FRA C & M I C R O SEIS. RESERVOIR M O D E L OPT I MI…
  44. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 44
    POUCE COUPE DRILLING PERFORMANCE 2018 2018 2017 2017 2016 2016 45
  45. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 45
    POUCE COUPE LOWER MONTNEY (D1) CORE AREA COMPLETION EVOLUTION Completion Parameter 2013 2014 2015 2016 2017 2018 Completion Fluid ( of Wells) X-linked/MVP (24) X-linked/MVP (37) SLW (30) SLW (14) SLW (59) SLW (28) Lateral Length…
  46. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 46
    ENGINEERED COMPLETIONS FOR MONTNEY/DOIG FULL FIELD DEVELOPMENT Industry Range Birchcliff Best Practices Oil Birchcliff Best Practices Gas Liner type Openhole or Cemented Openhole or Cemented Openhole or Cemented Inter-well spacing…
  47. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 47
    TERMINAL DECLINE CHANGES IQRE continued support for low terminal decline rates from Birchcliffs existing wells and offsetting industry wells with significant production history. Deloittes 2P Tier 0 type curve has remained at 8.2 Bcf…
  48. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 48
    PC GAS PLANT The Engine for Future Growth
  49. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 49
    Production Processed through the PC Gas 2013 2014 2015 2016 2017(5) 2018(5) Plant Average daily production, net to Birchcliff: Natural gas (Mcf) 91,666 132,808 163,641 168,444 193,417 250,011 Oil & condensate (bbls) 527 1,065…
  50. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 50
    Corporate Operating Costs vs. % of Natural Gas Sales KEY STRATEGIC Volumes Processed at the PC Gas Plant 10.00 100% Corporate Operating Cost (/boe) Volume Through PC Gas Plant ADVANTAGES 8.00 80% 6.00 60% 100% owned…
  51. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 51
    PC GAS PLANT HIGHLIGHTS Following the successful condensate-rich drilling program, Birchcliff is initiating the engineering and planning of a 20,000 bbls/d liquids handling hub at the PC Plant (anticipated completion in Q3/2020).…
  52. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 52
    BUILDING ON OUR PAST Over 10 Years of Success
  53. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 53
    Forecasted annual average production of Birchcliffs average daily production was 77,096 boe/d in 76,000-78,000 boe/d in 2018 compared to 2,793 boe/d in 2005, a compounded 2019 annual growth rate of 29% per year over that span.…
  54. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 54
    Birchcliff has increased production at a compound annual growth rate of 29% since 2005. Operating & Cash Costs * 20 18 16 14 Operating and cash costs have 12 decreased by 66% and 41% since /boe 10 8 2008 largely…
  55. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 55
    Reserves Growth 1,200 4,000 1,000 3,200 Birchcliff has added significant low cost reserves since commencing operations in 800 2005. On a per common share boe/1,000shares 2,400 MMboe 600 1,600 basis, PDP, 1P and…
  56. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 56
    APPENDIX
  57. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 57
    ENOUGH RESOURCE TO FILL A 2.2 Bcf/d LNG TRAIN FOR OVER 20 YEARS 1 Bcf/d LNG Train X 365 Days X 20 Years = 7.3 Tcf BIR Remaining Reserves as BIR Contingent Resource as at Dec 31, 2018 (gas only) at Dec 31, 2018 (gas only) 5.1 Tcf +…
  58. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 58
    2018 MONTNEY/DOIG RESOURCE ASSESSMENT Reserves and Resource Volumes (Bcfe)(1)(2) Resource Class Raw/Sales Low Estimate Case Best Estimate Case High Estimate Cumulative Production(3) Sales 995.4 995.4 995.4 Remaining Reserves(3)(4)…
  59. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 59
    2018 YEAR END MONTNEY/DOIG RESERVES Drilled 27 HZ M/D wells and acquired 2 HZ M/D wells Drilled 53 HZ M/D wells Drilled 20 HZ M/D wells 385 (380.6 net) Montney/Doig horizontal and acquired 87 HZ M/D wells wells drilled as of…
  60. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 60
    MONTNEY/DOIG WELL LOCATIONS Existing and Potential Future Drilling Locations by Interval at December 31, 2018 Average Proved Plus Probable Reserves plus Cumulative Gross Number of 2P Net Number of 2P Production Horizontal Well…
  61. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 61
    SERIES A PERPETUAL PREFERRED SHARES Preferred Share Details Series A Number of Shares 2 million Issue Date August 8, 2012 TSX Trading Symbol BIR.PR.A Issue / Par Price 25.00 per share Quarterly Dividend 0.523375 per share Yield on…
  62. March 2019 Investor Presentation – Birchcliff Energy Ltd. – slide 62
    SERIES C PREFERRED SHARES Preferred Share Details Series C Number of Shares 2 million Issue Date June 14, 2013 TSX Trading Symbol BIR.PR.C Issue / Par Price 25.00 per share Quarterly Dividend 0.4375 per share Yield at Issue 7.0%…