Skip to main content August 2020 Company Presentation – Birchcliff Energy Ltd. | Shale Experts
Loading...

August 2020 Company Presentation – Birchcliff Energy Ltd.

Birchcliff Energy Ltd. · Aug 12, 2020 · 77 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 1
    CORPORATE PRESENTATION August 12, 2020
  2. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 2
    PEOPLE, FOCUS & EXECUTION August 12, 2020 3
  3. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 3
    Corporate Snapshot & Select Guidance Q2 2020 average production (boe/d) 74,950 Light oil (bbls/d) 5,744 Condensate (bbls/d) 4,825 NGLs (bbls/d) 7,455 Natural gas (Mcf/d) 341,558 Q2 2020 operating expense (/boe) 2.89 Q2 2020…
  4. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 4
    Corporate Snapshot & Select Guidance Continued Total debt as at June 30, 2020 (millions) (1) 807.6 Credit facilities limit as at June 30, 2020 (billions) 1.0 Common shares (basic) as at June 30, 2020 (millions) 265.9 Market…
  5. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 5
    LOOKING FORWARD 2020 Plans & Beyond
  6. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 6
    2020 CAPITAL PROGRAM 2020 Capital Program - Capital Expenditures by Classification Capital Capital Change in Classification REVISED (MM) PREVIOUS (MM) Capital(1) DCCET (2) Pouce Coupe 101 - 107 104 - 110 (3%) (2) Gordondale 40 -…
  7. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 7
    2020 CAPITAL PROGRAM 2020 Capital Program - Wells to be Drilled and Brought on Production REVISED PREVIOUS Total wells to be drilled in Total wells to be brought Total wells to be drilled in Total wells to be brought (1) (1) Area…
  8. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 8
    FIVE YEAR PLAN THEMES Fully utilizing the available capacity of Birchcliffs existing infrastructure Increasing Birchcliffs free funds flow and reducing per-unit operating costs Maintaining and strengthening Birchcliffs balance…
  9. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 9
    MULTI-INTERVAL CUBE-STYLE DEVELOPMENT It is very important to note that all rock is not the same and Birchcliff has material, proprietary knowledge respecting all aspects of the Montney/Doig Resource Play in our area of focus. This…
  10. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 10
    MULTI-INTERVAL CUBE-STYLE DEVELOPMENT 2,400m 1,600m August 12, 2020 11
  11. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 11
    MULTI-INTERVAL CUBE-STYLE DEVELOPMENT HIGHLIGHTS AND COSTS 7.00 1.7MM in savings per well vs 2018 by switching to multi- Historically, smaller pads of 3-4 wells did not allow for 6.00 interval cube-style development Average Well…
  12. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 12
    BIRCHCLIFFS HISTORY A Track Record of Execution
  13. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 13
    INVESTMENT HIGHLIGHTS Focused assets in the Peace River Arch Area of Alberta on the Montney/Doig Resource Play Essentially 100% working interest; 99% of production is operated Large, contiguous undeveloped land base with an average…
  14. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 14
    KEYS TO SUCCESS Executives with proven track record, continuity since inception and significant ownership Management Highly experienced Management Team with excellent technical knowledge and a long history with the company 425 (417.4…
  15. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 15
    PRODUCTION HISTORY 90,000 78,000 77,977 80,000 80,000 77,096 Compound per-share production growth of 11% per year since 2005. 70,000 67,963 (12% since PC Gas Plant Phase I Average Production (boe/d) Completion in 2010)…
  16. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 16
    CORPORATE RESERVES 1,200,000 7,000 PDP - Reserves 1,100,000 TP - Reserves 2P - Reserves 6,000 1,000,000 On a per share basis PDP, 1P and 2P PDP - NPV10 reserves have increased at a compound 900,000 TP - NPV10 annual growth rate…
  17. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 17
    PROVEN TRACK RECORD AS A LOW COST PRODUCER 5 Year Profitability Breakdown: 2015 2016 2017 2018 2019 Average Average AECO (CAD/GJ) 2.55 2.05 2.04 1.42 1.67 1.95 Average WTI (USD/bbl) 48.80 43.32 50.95 64.77 57.03 52.97 P&NG…
  18. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 18
    PROVEN TRACK RECORD AS A LOW COST FINDER 12 PDP F&D 1P F&D 2P F&D Adjusted funds flow netback recycle ratios F&D Cost (/boe) 8 1.3x 1.4x 1.4x 1.6x 1.5x 1.5x 1.8x 1.3x 2.0x 1.9x 2.0x 4 1.7x 2.3x 1.8x 4.7x 8.8x 7.3x…
  19. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 19
    TRUE ASSET VALUE Infrastructure Assets(1) = 605 MM or 2.27/sh. 3,000 Pouce Coupe Gas Plant = 375 MM 100% WI Oil Batteries = 75 MM x 2 2,500 Sales & Gathering Lines = 30 MM Field Compression Hubs = 10 MM x 3 Non-Op Plant Ownership…
  20. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 20
    CORPORATE RESPONSIBILITY Environmental, Social & Governance Waste heat recovery units on phases V & VI of the PC Gas Plant and additional emission reduction initiatives take the equivalent of 5,000 cars off the road annually…
  21. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 21
    CORPORATE RESPONSIBILITY Community Involvement Over 3 million donated to more than 100 local community groups and organizations in the last 3 years Continued partnerships with local communities through educational, cultural, and…
  22. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 22
    2020E NATURAL GAS MARKETING AECO 2.10 0.04 0.34 1.72 77,100 GJ/d 19% 44% 3% 185,000 GJ/d Dawn 2.45 11,800 GJ/d 0.08 Alliance 1.25 34% 2.37 1.11 0.05 0.36 140,000 GJ/d 1.96 Note: All Birchcliff gas realizes a Henry…
  23. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 23
    RISK MANAGEMENT, HEDGING & DIVERSIFICATION(3) In 2020, approximately 81% of Birchcliffs natural gas production will effectively be sold at prices that are not based on AECO (based on 2020 production guidance of 78,000 - 80,000 BOE/d)…
  24. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 24
    OPEX/TRANSPORT COSTS VS GAS PRICING Opex down 32% Q2/20 vs Q3/17 T&M has increased due to increasing 9.00 access to new markets, realizing a 4.50 11% premium to AECO in Q2/20 8.00 4.00 7.00 3.50 Operating & T&M Costs (/boe)…
  25. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 25
    INCREASING WCSB NATURAL GAS EGRESS Additional 5.6 Bcf/d coming online by 2023 Intra-Alberta +1.7 Bcf/d East Gate +1.3 Bcf/d LNG 2.1 Bcf/d Intra-AB Demand West Gate +0.5 Bcf/d 1.7 Bcf/d West Coast LNG +2.1 CANADA Bcf/d…
  26. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 26
    BORROWING BASE DETAILS Birchcliff has extendible revolving credit facilities in the aggregate principal amount of 1.0 billion with maturity dates of May 11, 2022, which are comprised of an extendible revolving syndicated term credit…
  27. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 27
    MONTNEY/DOIG RESOURCE PLAY A Significant Position in a World Class Play
  28. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 28
    MONTNEY/DOIG - A WORLD CLASS RESOURCE PLAY Resource density. Stacked resource up to 300 metres thick. Large areal extent. Extends over 50,000 square miles. Exceptional fracability. Low clay Birchcliff Montney/Doig content, low…
  29. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 29
    MONTNEY/DOIG MINEROLOGY LEADS TO EXCELLENT FRACABILITY The Montney/Doig Resource Play rock type is composed of a Some other Resource Plays have a high percentage of clays high percentage of hard minerals, and a low percentage of and…
  30. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 30
    BIRCHCLIFF MONTNEY/DOIG RESOURCE PLAY The Gordondale Acquisition in 2016 added a fifth commercial development interval in the Montney D2 Large contiguous land base with 413.2 sections prospective for the Montney/Doig as at…
  31. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 31
    STACKED RESOURCE PROVIDES SUBSTANTIAL FUTURE UPSIDE 413 (406.2 net) drilled, cased, and completed Montney/Doig horizontal wells as of Dec 31, 2019 August 12, 2020 32
  32. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 32
    MONTNEY/DOIG MULTI LAYER OPPORTUNITY August 12, 2020 33
  33. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 33
    BIRCHCLIFF MONTNEY/DOIG INVENTORY 2019YE Note: Location inventory includes three (3) 100% W.I. existing wells that have proved non-producing reserves. (2 in Pouce Coupe and 1 in Elmworth) August 12, 2020 34
  34. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 34
    FOCUSED ASSETS FOCUSED INFRASTRUCTURE POUCE COUPE GORDONDALE Key Natural Gas Processing Infrastructure Key Natural Gas Processing Infrastructure Pouce Coupe Gas Plant AltaGas Gordondale Gas Plant 3-22-078-12W6 Sour Deep Cut Gas Plant…
  35. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 35
    WATER STORAGE INFRASTRUCTURE Birchcliff has extensive water storage infrastructure in place to support its completion operations 1,170,000 m3 of water storage at 11 strategically located site This volume provides Birchcliff…
  36. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 36
    POUCE COUPE OVERVIEW Proven asset in development phase Wells show high initial deliverability, low terminal decline and stable long term production Predictable results with improving gas rates & liquids yields 100% owned and…
  37. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 37
    CONTINUED NATURAL GAS RATE IMPROVEMENT Deloitte Tier 0 Type Curve Early 2019 wells pro-actively shut- in to minimize frac driven interaction from newer wells August 12, 2020 38
  38. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 38
    CONTINUED CONDENSATE RATE IMPROVEMENT Birchcliff continues to target condensate-rich natural gas wells in Pouce Coupe, which has materially impacted the amount of liquids (primarily condensate) being produced at the Pouce Coupe…
  39. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 39
    CONTINUED CONDENSATE RATE IMPROVEMENT August 12, 2020 40
  40. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 40
    POUCE COUPE 2020 LIQUIDS TYPE CURVE 4000 3500 Sales Gas Rate (Mcf/d) 3000 2500 2000 1500 1000 500 0 0 20 40 60 80 100 120 Producing Time (Months) Tier 0 Production Summary Tier 0 Type Curve Inputs (1) Cond.…
  41. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 41
    SCIENCE & TECHNOLOGY PAD August 12, 2020 42
  42. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 42
    GORDONDALE OVERVIEW Acquired in 2016, Gordondale consolidated a sizeable and contiguous land base within Birchcliffs existing core area High oil & NGLs weighting Strategic infrastructure Low base production decline High quality…
  43. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 43
    GORDONDALE BASE PRODUCTION HISTORY Birchcliff Scheduled Acquisition AltaGas Plant (22,000 BOE/d) Turnaround Last well drilled in 2014 (on-stream 2015) with peak production of 35,000 boe/d AltaGas Deep Cut Plant on stream…
  44. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 44
    GORDONDALE 2020 D1 & D2 OIL TYPE CURVES D1 Tier 1 Type Curve D2 Tier 1 Type Curve 500 450 400 Oil Rate (bbl/d) 350 300 250 200 150 100 50 0 0 20 40 60 80 100 120 Producing Time (Months) *Assumptions: Fx 1.30…
  45. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 45
    2018 LIQUIDS SUMMARY 2018 Well Rates (Rates are IP60) FURTHER REFINING OUR LIQUIDS STRATEGY GORDONDALE: CRUDE OIL Strong Montney D2 oil and total boe test rates Strong Montney D1 oil and total boe test rates Further refinements of…
  46. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 46
    2019 LIQUIDS SUMMARY 2019 Well Rates (Rates are IP60) CONTINUED PURSUIT OF INCREASED LIQUIDS GORDONDALE: CRUDE OIL Successful delineation of the Montney D1 and D2 oil trends to the south Significant Montney D1 and D2 results…
  47. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 47
    ELMWORTH DEVELOPMENT Received regulatory approval for an Second Exploration acid gas injection well in August 2016 Horizontal Preliminary planning underway for a 100% owned and operated 40 MMcf/d natural gas processing plant…
  48. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 48
    CONCEPTUAL MONTNEY/DOIG FIELD DEVELOPMENT MODEL STATUS OF MODEL CALIBRATION AND DERISKING FACIES & PETROPHYSICAL GEOLOGICAL, GEOPHYSICAL, GEOMECHANCAL HYDRAULIC FRAC & MICRO SEIS. RESERVOIR MODEL OPTIMIZED DCC & PRODUCTION BASAL…
  49. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 49
    POUCE COUPE DRILLING PERFORMANCE August 12, 2020 50
  50. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 50
    POUCE COUPE MONTNEY CORE AREA COMPLETION EVOLUTION Completion Parameter 2014 2015 2016 2017 2018 2019 2020 Design Completion Fluid ( of Wells) X-linked/MVP (34) SLW (30) SLW (14) SLW (37) SLW (15) SLW (17) SLW (24) Lateral Length…
  51. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 51
    GORDONDALE DRILLING PERFORMANCE August 12, 2020 52
  52. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 52
    GORDONDALE MONTNEY CORE AREA COMPLETION EVOLUTION Completion Parameter 2014 2017 2018 2019 2020 Design Completion Fluid ( of Wells) X-linked/MVP (4) SLW (22) SLW (13) SLW (16) SLW (10) Lateral Length (m) 1,540 2,352 1,959 2,058…
  53. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 53
    ENGINEERED COMPLETIONS FOR MONTNEY/DOIG FULL FIELD DEVELOPMENT Industry Range Birchcliff Best Practices Oil Birchcliff Best Practices Gas Liner type Openhole or Cemented Cemented Cemented Inter-well spacing 100 400 m (300 1,200 ft)…
  54. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 54
    TERMINAL DECLINE CHANGES IQRE continued support for low terminal decline rates from Birchcliffs existing wells and offsetting industry wells with significant production history. Deloittes 2P Tier 0 type curve has remained at 8.2 Bcf…
  55. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 55
    CONTINUED COST AND DESIGN REFINEMENT Both Pouce Coupe and Gordondale have moved to increased frac intensity to maximize oil and condensate rates Overall well costs have slightly increased due to increased frac intensity…
  56. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 56
    PC GAS PLANT The Engine for Future Growth
  57. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 57
    Production Processed through the PC Gas 2015 2016 2017 2018 2019 1H/2020 Plant Average daily production, net to Birchcliff: Natural gas (Mcf) 163,641 168,444 193,417 250,011 263,108 224,354 Oil, condensate & NGLs (bbls) 1,287 960…
  58. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 58
    KEY STRATEGIC Corporate Operating Costs vs. % of Natural Gas Sales Volumes Processed at the PC Gas Plant 10.00 100% ADVANTAGES Corporate Operating Cost (/boe) Volum e Through PC Gas Plant 8.00 80% 6.00 60% 100%…
  59. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 59
    PC GAS PLANT HIGHLIGHTS Current processing capacity of 340 MMcf/d The inlet liquids-handling facility was brought on-stream in late July 2020. This facility was completed ahead of schedule and under budget and gives Birchcliff the…
  60. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 60
    BUILDING ON OUR PAST Over 15 Years of Success
  61. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 61
    Forecasted annual average production of Birchcliffs average daily production was 77,977 boe/d in 78,000-80,000 boe/d in 2019 compared to 2,793 boe/d in 2005, a compounded 2020 annual growth rate of 29% per year over that span.…
  62. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 62
    Birchcliff has increased production at a compound annual growth rate of 29% since 2005. Operating & Cash Costs * 20 18 16 14 Operating and cash costs have 12 decreased by 70% and 41% since /boe 10 8 2008 largely due to…
  63. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 63
    Re serves Grow th 1,200 4,800 Birchcliff has added significant low cost 1,000 4,000 reserves since commencing operations in 800 3,200 2005. On a per common share boe/1,000shares MMboe 600 2,400 basis, PDP, 1P and 2P…
  64. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 64
    APPENDIX
  65. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 65
    CANADAS LNG ADVANTAGE Cleaning Our Worlds Environment, a 2.4 Bcf/d LNG Facility Could; Displace 52.6 million tonnes of carbon emissions from coal-fired power generation Replace approximately 34 coal fired power plants in China…
  66. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 66
    ENOUGH RESOURCE TO FILL A 2.5 Bcf/d LNG TRAIN FOR OVER 20 YEARS 1 Bcf/d LNG Train X 365 Days X 20 Years = 7.3 Tcf BIR Remaining Reserves as BIR Contingent Resource as at Dec 31, 2019 (gas only) at Dec 31, 2019 (gas only) 5.2 Tcf…
  67. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 67
    PROXIMAL TO INFRASTRUCTURE WITH LONG TERM EXPOSURE TO LNG EXPORT Montney/Doig Birchcliff Montney/Doig Production Resource Play Owned Infrastructure Pouce Coupe Gas Plant Nova Pipeline System North American Market LNG…
  68. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 68
    2019 MONTNEY/DOIG RESOURCE ASSESSMENT (1) The volumes presented in the table above, other than cumulative production and reserves, have been presented on an unrisked basis, meaning that they have not been adjusted for the chance…
  69. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 69
    MONTNEY/DOIG WELL LOCATIONS Existing and Potential Future Drilling Locations by Interval at December 31, 2019 Average Proved Plus Probable Reserves plus Gross Number of 2P Net Number of 2P Cumulative Production Horizontal Well…
  70. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 70
    SERIES A PERPETUAL PREFERRED SHARES Preferred Share Details Series A Number of Shares 2 million Issue Date August 8, 2012 TSX Trading Symbol BIR.PR.A Issue / Par Price 25.00 per share Quarterly Dividend 0.523375 per share Yield…
  71. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 71
    SERIES C PREFERRED SHARES Preferred Share Details Series C Number of Shares 2 million Issue Date June 14, 2013 TSX Trading Symbol BIR.PR.C Issue / Par Price 25.00 per share Quarterly Dividend 0.4375 per share Yield at Issue 7.0%…
  72. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 72
    EXECUTIVE OFFICERS Mr. Tonken has been the President and Chief Executive Officer and a director of Birchcliff since the inception of the Corporation and the Chairman of the Board since May 11, 2017. He has over 39 years of experience…
  73. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 73
    EXECUTIVE OFFICERS Christopher A. Mr. Carlsen has been the Vice-President, Engineering of Birchcliff since July 2013 and prior thereto, he was an Asset Team Lead and Senior Exploitation Engineer with Birchcliff. He is a Professional…
  74. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 74
    BOARD OF DIRECTORS A. Jeffery Tonken See Mr. Tonkens biography under Executive Officers. President, CEO and Chairman of the Board Mr. Surbey is a director of Birchcliff and is the Chair of the Reserves Evaluation Committee. He is…
  75. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 75
    BOARD OF DIRECTORS Ms. Gerlach is a director of Birchcliff and is the Chair of the Audit Committee. From September 1996 until September 2017, Debbie Ms. Gerlach was a partner with Deloitte LLP where she practiced in the Assurance and…
  76. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 76
    PRESENTATION OF OIL AND GAS RESERVES AND RESOURCES: Deloitte prepared the 2019 Consolidated Reserves Report, the 2018 Consolidated Reserves Report, the 2019 Deloitte Reserves Report and the 2018 Deloitte Reserves Report. McDaniel…
  77. August 2020 Company Presentation – Birchcliff Energy Ltd. – slide 77
    THANK YOU TEAM BIRCHCLIFF Jeffrey Akeroyd, Bradley Alexander, Karen Allen, Diana Almeida, Tracy Anderson, Camille Ashton, Gaetano Aurigemma, Angela Belbeck, Tyrus Bender, Riley Berge, Daniel Blattler, Calvin Bohdan, Angela Boire,…

From the store

Browse maps, data & reports in the Shale Experts store