Skip to main content March 2025 Corporate Presentation – Cardinal Energy Ltd. | Shale Experts
Loading...

March 2025 Corporate Presentation – Cardinal Energy Ltd.

Cardinal Energy Ltd. · Mar 1, 2025 · 18 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 1
    TSX: CJ
  2. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 2
    Cardinal Snapshot As at December 31, 2024 (unless stated) Shares Outstanding 159 MM Market Capitalization 1.0 billion Annual Dividend 0.72/share Bank Debt(1) 86 MM Credit Facility Capacity 275 MM Estimated Annual Production…
  3. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 3
    Key Attributes for Cardinal 1. Lowest Decline Conventional Producer in Canada.(1) 2. Long-Term Inventory of Drilling Locations on Conventional Asset Base. YE2024 Total Proved plus Probable Reserves grew by 30% year over year with…
  4. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 4
    Conventional Production Summary 25,000 20,000 Predictable Oil weighted Est. daily production (boe/d) 15,000 Low decline 10,000 Efficient additions Modest annual drilling requirements 5,000 Long term inventory…
  5. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 5
    Conventional Base (Estimated Daily Production - 21,900 boe/d) Saskatchewan (Q4 3,300 boe/d) North Midale Large miscible Mississippian CO2 EOR flood. o Numerous opportunities to expand when compared to neighboring analog pool. W…
  6. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 6
    History of Profitable Reserve Additions Cardinal is perennially amongst the leaders in efficient and Step change in 2024 TPP bookings with Reford recognition. profitable reserve capture. Delivered 3-year weighted average Future…
  7. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 7
    Capital Allocation 2025 Capital Allocations BUDGET: 2025 2025 Conventional Drilling/Optimization/Maintenance 71 MM 22% Asset Retirement Obligation 10 MM 3% Thermal (Reford Completion, De-risk Kelfield) 120 MM 38% Shareholder…
  8. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 8
    Thermal Projects: The Catalyst for FCF Accretion Base Pro Forma with Non Thermal Pro Forma with Reford and Business Reford Kelfield(1) Production (boe/d) 21,500 27,500 33,500 Adjusted Funds Flow (AFF) (MM)(2) 216 318 420 Adjusted…
  9. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 9
    Thermal Oil Project Pipeline Project 1 Project 2 Project 3 Reford Kelfield Delineating 6,000 bbl/d 6,000 10,000 bbl/d TBD Creating a Multi-Year Pipeline Please see Advisory 9 Cardinal Energy Ltd. TSX: CJ
  10. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 10
    Advantages of Saskatchewan Thermal Heavy Oil 180,000 Saskatchewan Thermal Benefits 160,000 Surface Access = Project Timing and Reduced Project Cost Central Location and Existing Infrastructure = Marketing Optionality 140,000 Oil…
  11. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 11
    Cardinal Thermal Trend Unity Oil Legend: 1. Reford SAGD Project 1 Terminal Cardinal Land Construction of the 6,000 bbl/d Reford Railway Plains Pipeline SAGD Project is underway; currently on TransGas Pipeline time and on budget…
  12. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 12
    Reford Waseca Channel Q4 2024 assessment wells Defined resource Q4 2024 disposal wells 9 legacy vertical assessment wells Wabasca channel trend 2 assessment wells and 2 injectors drilled in Q4/2024 3D seismic across land base…
  13. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 13
    Reservoir Comparison Dee Edam Edam Meota Meota Paradise Pikes Rush Spruce 1,000,000 Analog 1 Valley Edam East West East West Hills Peak Lake Sandall Lake Reford Analog 2 Operator CVE SRC CVE CVE SRC SRC CVE CVE CVE CVE CVE CJ 100,000…
  14. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 14
    Reford SAGD Project Progress Two of three steam generators now onsite. 50% of facility tankage has been delivered. Drilling of the six well pairs over half complete. Drilling rig release early Q2 2025. Construction of 18 km…
  15. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 15
    Reford SAGD Project CAPEX REFORD SAGD PROJECT CAPEX Budget vs. Actuals 180 160 140 120 100 MM 80 60 40 20 0 Jul-24 Dec-24 Jul-25 Dec-25 Mar-24 Mar-25 Jun-24 Oct-24 Jun-25…
  16. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 16
    Thermal Development Timeline Thermal Production Thermal Development Capital Expenditures 18,000 360 Today 16,000 320 14,000 280 Development Capital Expenditures 12,000 240 Oil Rate (bbl/d) 10,000 200 (MM) 8,000…
  17. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 17
    Reford SAGD Project: By The Numbers NPV: 498 MM Project Life: +20 years Design Rate: 6,000 bbl/d IRR: 46% PIR: 1.77 Recovery Potential: 45 MMbbls+ Payout: 24 months from 1st steam Economic Model Assumptions: Cum. Free…
  18. March 2025 Corporate Presentation – Cardinal Energy Ltd. – slide 18
    ARO Focus Asset Retirement Closure of our inactive assets remains a priority. Since 2020 Cardinal has: Abandoned 646 operated wellbores (7.3 x more wells than drilled) Decommissioned 53 facilities Reclaimed numerous surface sites;…

From the store

Browse maps, data & reports in the Shale Experts store