Corporate Presentation May 2014 2013 Ivanhoe Energy All rights reserved
Ivanhoe Energy Presentation 3
Ivanhoe Energys Road Ahead Corporate Objectives: Commercialize HTL Achieve Government of Ecuador endorsement of consortium contract to develop Block 20 Finance our capital needs Maximize the value of the Tamarack asset within…
Ivanhoe Energy Liquidity Cash balance at March 31, 2014: 13.6 million Ivanhoe can sustain basic operations into September 2014 The Company is pursuing new funds through potential asset divestiture, strategic alliances and raising…
Proprietary Heavy Oil Upgrading Process Heavy-to-Light (HTL) IvanhoePresentation Ivanhoe Energy Energy Presentation 6
Crude Oil Demand & Supply Historic and Projected Global Crude Oil Demand Total Global Forecasted Growth Crude Demand 89 MMbbls/d 90,000 Brazil Offshore Deepwater Tight Oil Outside of North America 80,000 Tight Oil from North…
Heavy Crude Oil Demand & Supply Historic and Projected Global Crude Oil Demand 16,000 14,000 7 million bpd of new heavy oil 12,000 development needed to satisfy future thousand barrels per day 10,000 demand Heavy Oil…
Sources of Heavy Crude Oil Constrained by production technology or cost limits: 1.0 trillion bbls In politically or geographically unfavorable locations: 0.4 trillion bbls Higher quality heavy oil which is more easily…
HTL Heavy Crude Opportunities: Target Resources by Region Denotes total resource potential for HTL application Countries whose economic returns on planned growth can be enhanced using HTL Countries whose stranded resources can be…
Economic Challenges Facing the Traditional Heavy Oil Supply Chain Heavy Oil Production Costs Blending and Transportation Market Value of 20 API Blend Large energy requirement to Diluent value losses Blend sells at a significant…
HTL: a Partial Upgrading Process Low Capital Modular Selectively & Operating Constructability convert oil Cost residue to lighter product Reduce Thermal viscosity; High Yield no diluent conversion Low of High required for No…
A Paradigm Shift for Upgrading Heavy Oil Upgrading Today Upgrading Tomorrow Ivanhoe Energy Presentation 13
HTL Process Flow Ivanhoe Energy Presentation 14
HTL Commercial Development Commercial Plant Pilot Plant Tamarack (FEED Design) Ottawa, Canada 1990s 4.5 bpd 1:225 Commercial Demonstration Facility Bakersfield, California 2005 2009 1000 bpd 1.10* Feedstock Test Facility…
Why Partial Upgrading Less Complex than full upgrading Traditional Upgrader Sulfur Coke Storage Storage Distillation Unit vs. Feed Sulfur Coking Unit Fractionation Recovery Units vs. Reactor & Product Recovery Feed…
Partial Upgrading vs Full Upgrading Lower Cost HTL costs are significantly less than those of traditional upgrading 180,000 160,000 140,000 Western Canada / bbl capacity, 120,000 cost basis 100,000 Delayed Coking…
HTL High Value Synthetic Crude Oil HTL Synthetic Crude Oil should be valued on or close to par with Brent price Ivanhoe commissioned several international energy consultants to validate this perspective Significant opportunity for…
HTL Materially Increases Netbacks 67% Increase 38/bbl 46/bbl Traditional Netback Operating Costs: Op Costs Dilute and Diluent Value Loss, Transportation, Ship Model Production Opex, Energy Usage 84/bbl Bitumen (16/bbl…
Commercializing HTL: Business Models Field Integrated Model eg. Tamarack, Block 20 Midstream Model Projects in development Ivanhoe Energy Presentation 21
SBM Alliance Announced March 20 Global strategic alliance combining respective expertise to create Floating, Production, Upgrading, Storage and Offloading vessels (FPUSO's) HTL's small footprint and modularization capability makes…
Protecting HTL Process and Product In the US Ivanhoe Energy has six patents granted and 13 patent applications pending. Internationally there are 57 patents granted and an additional 32 patents pending. Expiration date for Ivanhoes…
International Oil Development IvanhoePresentation Ivanhoe Energy Energy Presentation 24 24
Ecuador: Block 20 Discovered in the 1980s, Block 20 encompasses 272,500 acres Close proximity to the Andes means geologic faulting is prevalent The potential to discover commercial quantities of oil within the Block is high…
Ecuador: Block 20 Ivanhoe currently holds a 30 year Specific Services Contract with the Ecuadorian Government Contracted to develop the heavy oil using HTL with an additional right to produce discovered light oil Contract service…
Ecuador: Ivanhoe Development History Evaluation program began in May 2009 and extended to December 2013 Two appraisal wells drilled in 2010; oil recovered from IP-5b well; Independent lab analysis indicates an API gravity of 9 to 10…
The Oil Sands IvanhoePresentation Ivanhoe Energy Energy Presentation 28 28
Geology Comparison with Suncor Mackay River Parameter Units Mackay River Tamarack Level of delineation Wells per 16 16 section (in Phase 1 area) Net pay thickness metres Up to 35 Up to 47 (average 38) Oil saturation % 80 85 Porosity %…
Shallow Oil Sands Regulatory Environment The Alberta Energy Regulator (AER) is now completing a thorough technical review of the factors that affect reservoir containment of shallow steam-assisted gravity drainage (SAGD) projects in…
Appendix IvanhoePresentation Ivanhoe Energy Energy Presentation 33 33
Financial Summary at May 21, 2014 Stock Exchange Listings: TSX (IE) & NASDAQ (IVAN) Shares Outstanding: 115 million Fully Diluted 131 million Market Capitalization Cdn51.2 million Enterprise Value Cdn109 million Net Debt…
Projected Heavy Crude Production Rates 4,500 Thousands of barrels per day 4,000 3,500 3,000 2,500 2014 2030 2,000 1,500 1,000 500 0 HTL could prevent production HTL can improve economic HTL would enable access to…
Experienced Management Team Name Position Experience International Financier, Entrepreneur, Robert Friedland Founder & Executive Co-Chairman resource and technology focus Chemical Engineer; UOP; 35 years in Carlos A. Cabrera…