Skip to main content 2013 Investor Seminar – Santos Limited Investor Presentation | Shale Experts
Loading...

2013 Investor Seminar – Santos Limited

Santos Limited · Dec 4, 2013 · 96 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. 2013 Investor Seminar – Santos Limited – slide 1
    2013 Investor Seminar 4 December 2013
  2. 2013 Investor Seminar – Santos Limited – slide 2
    Welcome and introduction David Knox Managing Director and Chief Executive Officer Unloading GLNG piperack modules, Curtis Island
  3. 2013 Investor Seminar – Santos Limited – slide 3
    Delivering the Strong LNG project delivery in 2013 positions Santos strategy in 2013 to achieve 80 to 90 mmboe of production by 2020 AUSTRALIA LNG ASIA Fletcher Finucane first oil PNG LNG 90% complete Dua and Peluang on track…
  4. 2013 Investor Seminar – Santos Limited – slide 4
    Strong GLNG project GLNG is 72% complete and on track delivery in 2013 for first LNG in 2015 Drilling ahead of plan Fairview wells continue to produce strongly Roma pilot well data supporting predicted capacity First new wells at…
  5. 2013 Investor Seminar – Santos Limited – slide 5
    Production guidance 2014 production 52-57 mmboe, growth driven by PNG LNG start-up. 2013 production now expected to be approximately 51 mmboe Production 2014 guidance 52-57 mmboe mmboe New projects on line 60 60 PNG LNG 2H 2014 58…
  6. 2013 Investor Seminar – Santos Limited – slide 6
    Safety performance Lost time injury frequency rate of 0.6 per million hours worked Safety performance (employees and contractors) Fatality on Saxon CSG drilling Rate per million Work hours rig 185 on 23 June 2013 hours worked…
  7. 2013 Investor Seminar – Santos Limited – slide 7
    Principles of Increasing the confidence and trust of responsible operations the communities in which we operate Operating safely Protecting the environment Treating people with respect Limiting our footprint Making a…
  8. 2013 Investor Seminar – Santos Limited – slide 8
    2013 Investor Seminar Todays agenda Welcome and introduction David Knox Strategy and LNG markets Peter Cleary Business outlook Andrew Seaton GLNG upstream Trevor Brown GLNG downstream Rod Duke Q&A followed by morning tea…
  9. 2013 Investor Seminar – Santos Limited – slide 9
    Strategy and LNG markets Peter Cleary Vice President Strategy & Corporate Development PETRONAS Putri class LNG tanker
  10. 2013 Investor Seminar – Santos Limited – slide 10
    Our strategy Our vision is to be a leading energy company in Australia and Asia AUSTRALIA LNG ASIA Growing our Delivering our Building a focused strong domestic transformational exploration-led base business LNG portfolio…
  11. 2013 Investor Seminar – Santos Limited – slide 11
    Global LNG demand LNG continues to be a fast growing fuel and supply outlook mtpa 600 500 400 290 160 mtpa mtpa 300 Other Pacific 200 Atlantic Qatar 100 Australia 0 2000 2005 2010 2015 2020 2025 2030 Source: Wood…
  12. 2013 Investor Seminar – Santos Limited – slide 12
    LNG Demand Forecasts frequently underestimate actual LNG demand mtpa 2012 contracted LNG by source LNG delivers energy security 100 Buyers rely on the spot market or short term market to meet their LNG needs 80 Spot Traditional…
  13. 2013 Investor Seminar – Santos Limited – slide 13
    Global LNG demand US LNG alone will not fill the gap vs US LNG in 2025 mtpa Constraints on 500 US LNG exports Buyer appetite for 400 diversity of supply Contestable 100 mtpa 160 market Not all US LNG projects US LNG will secure…
  14. 2013 Investor Seminar – Santos Limited – slide 14
    US LNG pricing Portfolio players and trading houses dominate US LNG off-take with higher pricing Sabine Pass LNG pricing - 2012 Portfolio player pricing terms for resale - 2013 US/mmBtu US/mmBtu 16 16 Spot 14.6/mmBtu 14 13.5/mmBtu…
  15. 2013 Investor Seminar – Santos Limited – slide 15
    Santos unique Interests in four LNG projects LNG portfolio with growth opportunities Operating Darwin LNG 11.5% equity 3.7 mtpa plant capacity Fully contracted to 2023 Under construction PNG LNG GLNG 13.5% equity 30% equity…
  16. 2013 Investor Seminar – Santos Limited – slide 16
    Strong Australian base Santos has a significant infrastructure footprint that provides development optionality Santos assets Northern LNG INFRASTRUCTURE: FPSO LNG Gas Processing / Load out facility Carnarvon Eastern…
  17. 2013 Investor Seminar – Santos Limited – slide 17
    Strong diverse portfolio Delivering a balanced portfolio of 80-90 mmboe in 2020 2020 indicative production split Asia Australia Liquids LNG Gas Unconventional Conventional 18 2013 INVESTOR SEMINAR
  18. 2013 Investor Seminar – Santos Limited – slide 18
    Business outlook Andrew Seaton Chief Financial Officer
  19. 2013 Investor Seminar – Santos Limited – slide 19
    Strong business outlook Operating cash flow is expected to double by 2016, providing the foundation for further growth and increased shareholder returns Clear production growth outlook Growing margins Robust funding position…
  20. 2013 Investor Seminar – Santos Limited – slide 20
    Production growth Delivering 80-90 mmboe of production by 2020 from already captured opportunities Santos production Upside potential mmboe Aust: Cooper shale, Cooper tight gas, Zola, 90 Winchester, Amadeus, McArthur LNG: PNG LNG…
  21. 2013 Investor Seminar – Santos Limited – slide 21
    Margin growth Growing margins from higher revenues and lower unit costs Increasingly oil price-linked Growing revenue per barrel Oil price-linked 35% Other 70% 2012 2015 Santos average realised gas price Rising domestic gas…
  22. 2013 Investor Seminar – Santos Limited – slide 22
    Capex guidance 2013 is peak year for capex guidance unchanged at 4 billion. 2014 guidance 3.5 billion Capital expenditure 2014 guidance of 3.5 billion (excludes capitalised interest) (excluding capitalised interest) Abillion GLNG 1.4…
  23. 2013 Investor Seminar – Santos Limited – slide 23
    Strong funding position 3.7 billion in balance sheet capacity to fund execution of business strategy and minimise financing risk. Minimal debt maturities to 2016 Available liquidity Debt maturity profile Abillion Amillion Notes…
  24. 2013 Investor Seminar – Santos Limited – slide 24
    GLNG upstream Trevor Brown Vice President Queensland Drilling rig, Fairview field
  25. 2013 Investor Seminar – Santos Limited – slide 25
    Strong GLNG project GLNG is 72% complete and on track delivery in 2013 for first LNG in 2015 Drilling ahead of plan Fairview wells continue to produce strongly Roma pilot well data supporting predicted capacity First new wells at…
  26. 2013 Investor Seminar – Santos Limited – slide 26
    GLNG project summary The GLNG project is 72% complete and on track for first LNG in 2015 Rockhampton Curtis Island Location Queensland, Australia GLNG plant Project Santos (30% and operator), PETRONAS, Gladstone participants…
  27. 2013 Investor Seminar – Santos Limited – slide 27
    GLNG upstream On track to drill over 230 wells in 2013. Continued focus on field development optimisation On track to drill over 230 wells in the GLNG acreage in 2013 224 wells drilled in the GLNG acreage year-to-date Average 2013…
  28. 2013 Investor Seminar – Santos Limited – slide 28
    Fairview field Fairview wells continue to produce strongly, with an development average gas capacity of 1.63 TJ/day per well Fairview well performance as at 1 October 2013 170 wells are connected with a current capacity of 278 TJ/day…
  29. 2013 Investor Seminar – Santos Limited – slide 29
    Roma field development Roma pilot data supporting individual well capacity of 0.5 TJ/day. First wells have been connected to new facilities Roma well performance as at 1 October 2013 34 appraisal pilot wells in Optimum gas Optimum…
  30. 2013 Investor Seminar – Santos Limited – slide 30
    Fairview Hub 4 Commissioning of the water processing facilities is 250 TJ/day capacity underway. All nodal compressors, gas turbine alternators, switchrooms and control buildings are installed Nodal compressors and piperack, Fairview Hub…
  31. 2013 Investor Seminar – Santos Limited – slide 31
    Fairview Hub 5 Commissioning of the associated water amendment 170 TJ/day capacity facility (AWAF 3) has been completed AWAF 3, Fairview Hub 5 32 2013 INVESTOR SEMINAR
  32. 2013 Investor Seminar – Santos Limited – slide 32
    Roma Hub 2 First development wells have been connected 145 TJ/day capacity and dewatering has commenced Scrubbers and hub compressor, Roma Hub 2 33 2013 INVESTOR SEMINAR
  33. 2013 Investor Seminar – Santos Limited – slide 33
    Upstream infrastructure APLNG collaboration agreement has been signed. CRWP loop and electrification projects underway Collaboration agreements signed between the GLNG and APLNG projects in October Queensland 2013 for gas swaps and…
  34. 2013 Investor Seminar – Santos Limited – slide 34
    GLNG Upstream Significant milestones achieved in 2013. GLNG remains on track for first LNG in 2015 Milestone Date Over 200 wells spudded in 2013 October 2013 Collaboration agreement signed with APLNG October 2013 First wells…
  35. 2013 Investor Seminar – Santos Limited – slide 35
    GLNG downstream Rod Duke Vice President Downstream GLNG GLNG plant site, Curtis Island
  36. 2013 Investor Seminar – Santos Limited – slide 36
    Gas transmission pipeline Remains on track for completion in Q2 2014, with pre-commissioning activities underway 420-kilometre gas pipeline construction progressing well: Clearing and grading is complete Stringing is complete…
  37. 2013 Investor Seminar – Santos Limited – slide 37
    Marine crossing tunnel Over 3.7 kilometres of the 4.3 kilometre tunnel is complete, on track for Q1 2014 completion Marine crossing tunnel Tunnel boring machine reception shaft, Curtis Island 38 2013 INVESTOR SEMINAR
  38. 2013 Investor Seminar – Santos Limited – slide 38
    LNG plant site Significant construction progress over the past 12 months GLNG plant site, Curtis Island October 2013 39 2013 INVESTOR SEMINAR
  39. 2013 Investor Seminar – Santos Limited – slide 39
    LNG plant modules Over half of the Train 1 modules have been shipped from the module yard to Curtis Island 82 Train 1 modules required: 47 modules shipped to site 8 modules complete and ready for shipping 27 modules under…
  40. 2013 Investor Seminar – Santos Limited – slide 40
    LNG trains Construction progressing well, with module installation underway Train 1 site, Curtis Island October 2013 41 2013 INVESTOR SEMINAR
  41. 2013 Investor Seminar – Santos Limited – slide 41
    LNG tanks Good construction progress with both roofs raised, concrete roof pours complete and work underway on inner nickel steel tanks October 2013 Inside LNG Tank B LNG Tank B roof concreting LNG Tank B and A 42 2013…
  42. 2013 Investor Seminar – Santos Limited – slide 42
    LNG jetty Installation of jetty modules, loading arms and marine flare complete. Dredging complete. Pipe welding of trestle modules has commenced LNG jetty, Curtis Island October 2013 43 2013 INVESTOR SEMINAR
  43. 2013 Investor Seminar – Santos Limited – slide 43
    Commissioning and Teams recruited and commissioning plans in place Operations Dedicated Bechtel commissioning management team for GLNG plant LNG plant commissioning team will include GLNG operators Experienced GLNG partner…
  44. 2013 Investor Seminar – Santos Limited – slide 44
    Downstream collaboration QGC pipeline interconnection agreement signed; construction to commence in 2014. Further areas for collaboration are being explored Agreement signed with QGC to interconnect both projects pipelines Allows…
  45. 2013 Investor Seminar – Santos Limited – slide 45
    GLNG downstream Significant milestones achieved in 2013; GLNG remains on track for first LNG in 2015 Milestone Date Marine crossing tunnelling commenced April 2013 First LNG tank roof raise completed June 2013 Second LNG tank…
  46. 2013 Investor Seminar – Santos Limited – slide 46
    Exploration Bill Ovenden Head of Exploration Crown-1ST1
  47. 2013 Investor Seminar – Santos Limited – slide 47
    Strong track record Santos exploration team has consistently delivered material resource additions Pre-drill exploration 2C discovered 2P reserves 1P Finding costs, 2008-2012 opportunities resources USD/boe1 7.95 Phu Khanh basin…
  48. 2013 Investor Seminar – Santos Limited – slide 48
    Exploration strategy The Santos exploration strategy delivers options to underpin long term organic growth 2014 seismic acquisition Strengthen position in focus 2014 exploration drilling super basins Focus super basins Frontier…
  49. 2013 Investor Seminar – Santos Limited – slide 49
    Carnarvon Basin Bianchi and Winchester discoveries build on recent success with further upside potential, proximal to infrastructure PSTM Near Stack Pluto Reindeer Winchester Io Stag John Brookes Gorgon Spar Varanus Island…
  50. 2013 Investor Seminar – Santos Limited – slide 50
    Browse Basin World class resources and prospect inventory. Lasseter prospect to be drilled in Q2 2014 Poseidon Dufresne 2013 program discovery Crown discovery (P&A) Bassett West Basset West-1 discovery discovery Dufresne-1…
  51. 2013 Investor Seminar – Santos Limited – slide 51
    Browse Basin Lasseter is an exciting prospect in the heart of the Browse, with drilling planned for Q2 2014 Santos is operator with 30% Lasseter equity interest, partners are Chevron and Inpex Multi target prospect in WA-274-P,…
  52. 2013 Investor Seminar – Santos Limited – slide 52
    PNG and West Papua Renewed focus on exploration in the Papuan Basin, exploration farm-in to four exploration licences in 2013, drilling and seismic planned for 2014, Warim reactivated 2013 program West Papua Farm-in to…
  53. 2013 Investor Seminar – Santos Limited – slide 53
    Offshore South Australia Gazettal capture of a 50% interest in EPP 43 in the offshore Ceduna Basin in October 2013 Oil prone source rocks Access to a large from sea floor sampling frontier basin Ceduna 16,600 km2 block with water…
  54. 2013 Investor Seminar – Santos Limited – slide 54
    Australian shale Cooper and McArthur Basins have some key technical attributes comparable to successful US shale basins Organic matter Hydrocarbon Mineralogy TOC wt% content Non-clay content McArthur Basin mmboe/km2 % Darwin…
  55. 2013 Investor Seminar – Santos Limited – slide 55
    McArthur Basin Large footprint in the heart of the McArthur Basin unconventional oil and gas potential with scale Beetaloo sub-basin 2D seismic example Santos EP-161 permit Kyalla Fm (Shale) Velkerri Fm (Shale) 5 KM…
  56. 2013 Investor Seminar – Santos Limited – slide 56
    2014 exploration schedule Delivers on our exploration strategy across super basins, frontier basins and unconventional basins Santos Well Name Basin / Area Target Timing Interest % Manta-1 PNG Gas 30 Drilling South Sumatra CSG…
  57. 2013 Investor Seminar – Santos Limited – slide 57
    Drilling and Completions Diana Hoff Vice President Technical and Engineering Roswell-2 horizontal shale well 30 Conductor 17-1/2 Surface hole 13-3/8 Surface casing +/-3800ft 12-1/4 Intermediate hole 9-5/8 Intermediate…
  58. 2013 Investor Seminar – Santos Limited – slide 58
    Drilling and completions On track to deliver over 330 wells for 2013 309 operated wells drilled year-to-date, including: 224 GLNG wells 68 Cooper Basin wells All 8 South Sumatra CSG exploration wells completed with zero…
  59. 2013 Investor Seminar – Santos Limited – slide 59
    GLNG drilling and Continued time and cost efficiencies achieved in 2013, completions with 224 wells drilled year-to-date Average actual cost per GLNG Over 30% reduction in drilling and completion development well (million) costs per…
  60. 2013 Investor Seminar – Santos Limited – slide 60
    GLNG drilling and Over 50 minimal disturbance lease pads have been completions delivered in 2013; driving down lease construction costs and reducing our site footprint Lease construction costs have reduced by over 50% due to:…
  61. 2013 Investor Seminar – Santos Limited – slide 61
    Cowralli multi-well pad, Comprising 16 wells across two pads, Cooper Basin 10,500 foot s-curve drills and 5 frac stages per well Longest step-out of 2,928 feet Record Polycrystalline Diamond Compact (PDC) drill bit run of 9,435…
  62. 2013 Investor Seminar – Santos Limited – slide 62
    Cowralli multi-well pad, Multi-well pads deliver greater efficiency, lower costs Cooper Basin and a smaller environmental footprint Number of frac stages per day Cowralli multi-well pad drilling completed in October 2013 with…
  63. 2013 Investor Seminar – Santos Limited – slide 63
    Cooper Basin horizontal Roswell-2: Santos first horizontal REM shale well. shale program Continuing to define an optimal well and frac design to deliver maximum rate and recovery at lowest cost 30 Conductor Roseneath formation shale…
  64. 2013 Investor Seminar – Santos Limited – slide 64
    Eastern Australia Business Unit James Baulderstone Vice President Eastern Australia Drilling rig, Narrabri gas project
  65. 2013 Investor Seminar – Santos Limited – slide 65
    Eastern Australia Santos ideally placed to leverage value market opportunity from its portfolio of resources and infrastructure East coast gas demand to triple leading to higher prices Gas demand Santos responding by building gas…
  66. 2013 Investor Seminar – Santos Limited – slide 66
    Eastern Australia gas Additional supply is required to meet increased market transformation demand and Santos well placed to benefit Eastern Australia gas demand (PJ) Tripling of gas demand creating market tightness 2,500 Recent east…
  67. 2013 Investor Seminar – Santos Limited – slide 67
    Santos well placed to Cooper Basin legacy infrastructure and existing meet growing demand resource base provides great competitive advantages Cooper Basin gas production capacity has Cooper raw gas capacity (mmscf/day) turned the…
  68. 2013 Investor Seminar – Santos Limited – slide 68
    Increasing Cooper Basin Targeting three key areas during 2014 2016 gas production enabling cost efficiencies from increased scale 2 rig, pad development focus Santos acreage Gas field Moomba High deliverability Oil field Gas…
  69. 2013 Investor Seminar – Santos Limited – slide 69
    Operational efficiencies Improved reliability, production optimisation and unlocking value drilling improvements leading to higher margins Cooper gas downtime (%) Cooper gas production cost Cooper gas drilling program (million, Santos…
  70. 2013 Investor Seminar – Santos Limited – slide 70
    Cooper infrastructure Stage 1 infrastructure upgrades on track to meet expansion production growth targets - taking Moomba average processing capacity to 420 TJ/day sales gas Site works commenced for 22,000 HP compression at 3 key…
  71. 2013 Investor Seminar – Santos Limited – slide 71
    Narrabri Gas Project Strong Narrabri stakeholder support progressed during 2013 enabling recommencement of activity Leewood water treatment plant Appraisal program Largely completed remediation of legacy issues 16 well appraisal…
  72. 2013 Investor Seminar – Santos Limited – slide 72
    Narrabri Gas Project 2014 program aiming to be in a position go forward to deliver first gas in 2017 Landholder agreements and local investment Community Job creation peaking at 1,200 Attractive community compensation package…
  73. 2013 Investor Seminar – Santos Limited – slide 73
    Cooper Basin Market demand accelerating the commercialisation unconventional of three potential multi tcf plays in the Basin opportunity Santos Exploration permit Basin Centred Gas Santos Production licence Shale Gas Play Regionally…
  74. 2013 Investor Seminar – Santos Limited – slide 74
    Cooper unconventional Important milestones have been met during 2013, results and 2014 program designed around key learnings Play Program milestones Progress 2013 program achievements Drill Gaschnitz-1 Proven play with large…
  75. 2013 Investor Seminar – Santos Limited – slide 75
    High value Cooper oil Maximising production and margin business Cooper Basin crude oil sales 100% reserve replacement for three consecutive years mmbbl Netback 70 per barrel 10 16 million 2P undeveloped reserve dominated by five key…
  76. 2013 Investor Seminar – Santos Limited – slide 76
    Eastern Australia Santos positioned to capitalise 2015 transformation on strong market demand Recent contracts signed at 8/GJ New gas supply Cooper gas and Narrabri Gas Project well positioned to supply sources critical into this…
  77. 2013 Investor Seminar – Santos Limited – slide 77
    Asia Pacific Martyn Eames Vice President Asia Pacific PNG LNG plant site, near Port Moresby
  78. 2013 Investor Seminar – Santos Limited – slide 78
    Strategic importance Building a high-margin business in Asia of Asian business with a focus on three core countries Our position Unlocking scale in 2013 Foundation owner in PNG LNG over 90% complete and on PNG PNG LNG project track…
  79. 2013 Investor Seminar – Santos Limited – slide 79
    PNG LNG project Over 90% complete and on track for first LNG in 2H 2014 Location Papua New Guinea Project Santos 13.5%, participants ExxonMobil, Oil Search, NPCP, JX Nippon, MRDC, Petromin PNG Project scope Upstream gas and…
  80. 2013 Investor Seminar – Santos Limited – slide 80
    PNG LNG project Significant milestones achieved in 2013, with commissioning activities well underway Hides Gas Conditioning Plant 81 2013 INVESTOR SEMINAR
  81. 2013 Investor Seminar – Santos Limited – slide 81
    PNG LNG potential Existing infrastructure can support potential future expansion expansion. As an owner of the foundation project infrastructure, Santos is well placed Multiple options for potential expansion of foundation 2-train…
  82. 2013 Investor Seminar – Santos Limited – slide 82
    Indonesian domestic gas Strong base business in East Java underpinned by rising prices 13% of Santos current gas production is from Oyong, Wortel and Maleo Weighted gas price has doubled to US5/mmbtu Peluang gas project is over…
  83. 2013 Investor Seminar – Santos Limited – slide 83
    Indonesia oil Acquisition of a 50% operated interest in Ande Ande Lumut oil field, with Indonesian government approvals received in November 2013 Vietnam Santos acreage Leverage Santos core skills in Indonesia Gas field Oil field…
  84. 2013 Investor Seminar – Santos Limited – slide 84
    Vietnam oil Building our high-margin oil business with Dua development over 65% complete Vietnam Ho Chi Minh City Chim So Santos acreage Gas field Full oil and gas production resumed following repair of Oil field Gas pipeline…
  85. 2013 Investor Seminar – Santos Limited – slide 85
    Asia Pacific Business Unit Building a high-margin business in Asia with a focus on three core countries Asia Pacific EBITDAX (excluding asset sales) million PNG 400 197 300 70% EBITDAX margin Indonesia 200 175 170 110…
  86. 2013 Investor Seminar – Santos Limited – slide 86
    Western Australia and Northern Territory John Anderson Vice President WA & NT Fletcher Finucane oil project
  87. 2013 Investor Seminar – Santos Limited – slide 87
    WA & NT Business Unit Three business themes delivering high margins with significant growth options Deliver new high margin oil opportunities Carnarvon oil Build inventory of near-infrastructure oil opportunities Leverage…
  88. 2013 Investor Seminar – Santos Limited – slide 88
    Carnarvon oil Fletcher Finucane adds to high margin oil production. Building incremental oil opportunities Target Delivery First oil by 2H 2013 Ahead of schedule Fletcher Finucane 490 million gross capex Under budget by 20…
  89. 2013 Investor Seminar – Santos Limited – slide 89
    Carnarvon domestic gas Santos is the third-largest domestic gas supplier in Western Australia with further margin potential Santos position In two of four gas hubs (at uniform equity level of 45%) A market leader Large…
  90. 2013 Investor Seminar – Santos Limited – slide 90
    Focused Carnarvon Basin Bianchi and Winchester discoveries located near gas exploration key infrastructure. Davis-1 well targeting additional resource additions Bianchi - material extension to Zola, allowing Winchester - strategically…
  91. 2013 Investor Seminar – Santos Limited – slide 91
    Bayu-Undan / Darwin LNG Strong production in 2013. Progress on Phase 3 drilling program. Multiple feed gas options for backfill and expansion emerging Maintain high margin asset Site for new FID on Phase 3 offshore LNG trains…
  92. 2013 Investor Seminar – Santos Limited – slide 92
    Browse Basin Material resource build to support multiple commercialisation options including collaboration with adjacent resource owners for brownfield expansion Significant resource build Grand prospect Dufresne-1 Bassett West…
  93. 2013 Investor Seminar – Santos Limited – slide 93
    Caldita Barossa Concept evaluation completed for three well carried appraisal program commencing Q1 2014 Partnership with ConocoPhillips and SK E&S with joint venture funding of up to US520 million in appraisal drilling, pre-FEED,…
  94. 2013 Investor Seminar – Santos Limited – slide 94
    Bonaparte LNG Competitive concept definition has been completed with consortia FEED bids under evaluation. FEED targeted for 1H 2014 Development of Petrel, Tern and Frigate fields, located 250km west of Darwin Floating LNG…
  95. 2013 Investor Seminar – Santos Limited – slide 95
    WA & NT Business Unit Three business themes delivering high margins WA & NT EBITDAX (excluding asset sales) million Carnarvon 1000 oil 800 423 423 70% 600 EBITDAX Domestic margin gas 400 368 369 384 200 Northern LNG…
  96. 2013 Investor Seminar – Santos Limited – slide 96
    2013 Investor Seminar 4 December 2013

From the store

Browse maps, data & reports in the Shale Experts store