Russias Natural Gas Frontiers: Harnessing the Energy of the Far North Mark A. Gyetvay, Chief Financial Officer and Member of the Board Credit Suisse 19th Annual Energy Summit Vail, Colorado, USA 12-13 February 2014
Fields and License Areas NOVATEK producing fields Other NOVATEK fields Purovsky Plant Gas condensate piplene from Yamal-Nenets Autonomous the Yurkharovskoye field to Region one of the the Purovsky plant worlds largest natural…
Positions in the World Proved gas reserves as at 31.12.12 (SEC), bcm Gas production in 2012, bcm Gazprom 19196 Gazprom 487.0 ExxonMobil 2098 ExxonMobil 135.8 Petrochina 1914 Shell 104.4 NOVATEK 1758 4 BP 81.7 Shell 1212…
Targets for 2014 Launching the Urengoykoye, Yaro-Yakhinskoye fields and third stage of the Samburgskoye field of SeverEnergia Launching the North-Khancheyskoye field Increasing gas production by 7-8% y-o-y Increasing liquids…
Purovsky and Ust-Luga
Purovsky Plant Expansion Completed Year Stage Capacity First stage 2 mmt per annum 2005 1st and 2nd stabilization of de-ethanized technological trains condensate Second stage 3 mmt per annum 2008 3st and 4nd stabilization Total 5…
Ust-Luga Gas Condensate Fractionation and Transshipment Complex Completed Nameplate processing capacity 6 mmt of stable gas condensate per annum (2 trains of 3 mmt each) First train launched in June 2013, second train launched…
Integrated Technological Chain and Logistics Naphta (tankers with deadweight of up to 85 th. t) Barents sea Jet fuel (up to 35 th. t) Diesel (up to 35 th. t) Stable gas Heating/ship fuel (up to 15 th. t) condensate (up to 60 th.…
Major Launches in 2014-2015
Fields of the SeverEnergia JV SeverEnergia blocks NOVATEK has recently increased its Other fields of NOVATEK stake in the JV from 25.5 to 59.8% NOVATEK gas condensate pipeline Yurkharovskoye 4 blocks with proved SEC reserves of…
Fields of the SeverEnergia JV: Urengoyskoye Field Geology and reserves Estimated production profile 16 Achimov deposits: depth 3,700 3,900 meters Plateau level of gas production pressure abnormally high 14 permeability low…
Fields of the SeverEnergia JV: Yaro-Yakhinskoye Field Geology and reserves Estimated production profile Valanginian deposits: 9,0 Plateau level of gas production depth 3,000 3,300 meters very compact location at the dome of 8,0…
Fields of the SeverEnergia JV: Samburgskoye Field Estimated production profile Geology and reserves 9 Valanginian deposits: depth 3,000 3,450 meters 8 Plateau level of gas production initial condensate factor 150 gr. per cm 7…
Yarudeyskoye Oil Field Geology and reserves Estimated oil production profile, mmt Sandstone reservoir: 4 depth 1,850 3,050 meters Plateau level of oil production 3,5 estimated average initial flow rates 450 tons per day per…
Other Launches in 2014-2015 Field Share Launch Peak production 0.7 bcm of gas, 1. Dobrovolskoye 100% 2014 0.15 mmt of condensate 2. North-Khancheyskoye 100% 2014 0.9 bcm of gas 2.15 bcm of gas, 3. Termokarstovoye 51%…
Yamal LNG
Yamal LNG Project Project for construction of an LNG plant on the Yamal Peninsula: Shareholders 2P gas reserves of the South-Tambeyskoye onshore conventional field - 907 bcm Total 20% Liquefaction capacity - 16.5 mmt of LNG per…
Key Project Advantages Low-cost, long-lived feedstock Large onshore conventional reserve base with high concentration of reserves Well known geology and proven development technologies Very low F&D and lifting costs Convenient…
South-Tambeyskoye Field Development Plan Current development parameters Drilling rig Arctic 208 production wells to be drilled from 19 well pads: First rigging up 60 days 58 wells to feed the 1st train of the LNG plant Rig move…
Selected Contractors Equipment Contractor EPC Technip/JGC 1. Cryogenic Heat Exchangers APCI 2. Turbine Cryogenic Compressors General Electric 3. Boil-Off Gas Compressors Siemens 4. Integrated Control & Safety System Yokogawa 5. Gas…
On-Site Works Airport construction 22
On-Site Works MOF construction 23
On-Site Works Living quarters Living quarters 24
On-Site Works Dredging works in the harbour 25
On-Site Works Cargo with construction materials 26
Financial Position at 30 September 2013 Total Debt Maturity Profile (RR million) Debt Structure (Total Debt = RR 140.7 billion) 58,551 46,567 Fixed/floating 83% 17% 42,050 USD/RUB 69% 31% 21,151 13,509 Long-term/short- 969…
Questions and Answers Contact details: NOVATEKs Investor Relations Mark Gyetvay, Chief Financial Officer Alexander Palivoda, Head of IR Tel: +7 (495) 730-6013 Email: irnovatek.ru Website: www.novatek.ru