Agenda Recent developments Financial results Operations/projects Outlook Appendix 3
Recent developments Q3 utilisation of 96 per cent Best operating result ever in Q3 Construction of first new build approaching completion Safe Bristolia operation suspended due to weather damages to equipment Near-term outlook…
Agenda Recent developments Financial results Operations/projects Outlook Appendix 5
Solid funding structure in place Interest-bearing debt portfolio Facility Commitment Maturity Margin USD 1,100 million credit facility (2011-17) USD 655 million Q3 2017 187.5 bps USD 420 million credit facility (2012-17) USD 420 million…
Dividend policy Paying out up to 75 per cent of previous years net profit Exact level to be paid in each period dependent on Supply/demand balance in the market Investment level Overall financial position of the Group Detailed…
Dividend Declared an interim dividend equivalent to USD 0.053 per share The shares will trade ex- dividend on 13 November The dividend will be paid in the form of NOK 0.36 per share on 26 November Reflecting a payout ratio of…
Agenda Recent developments Financial results Operations/projects Outlook Appendix 13
Operations Solid operations in Q3 Utilisation rate of 96 per cent Safe Bristolia sustained damages to lifeboats after experiencing extreme weather conditions around mid October 14
Safe Boreas Commissioning ongoing Sea trials to commence during next few weeks On track for start-up of operations in Norway in late April/early May First contract for Lundin at the Edvard Grieg field in Norway Financial…
Safe Boreas 16
Safe Zephyrus Major items of equipment installed Installation of cabins ongoing Ready for operations in 2015 Financial status Q3 14 USDm Book value o.b. 79 Book value c.b. 84 Capitalised in quarter 4 Estimated total cost 350…
Safe Notos and Safe Eurus Projects developing as planned Fast start: Steel cutting taking place 4 months after contract and keel lay 8.5 months after contract Engineering and procurement progressing well Strong capabilities The…
State of the art North Sea fleet Safe Boreas new build Safe Zephyrus new build Safe Notos new build Safe Eurus new build Safe Scandinavia life extension in 2014 (20 years) Safe Caledonia life extension in 2013 (20 years) Regalia…
Agenda Recent developments Financial results Operations/projects Outlook Appendix 20
North Sea weaker demand Short-to-medium term weakness North Sea accommodation demand index More uncertain demand situation 120 112 109 due to reduced spending by oil 110 106 103 101100 companies 99100 100 100 95 94 90 91 90 87…
North Sea day rates (time charter) 23
Mexico stable outlook GoM infrastructure map High activity level in shallow waters evidenced by an increasing number of drilling jack-ups under contract Interesting potential also in other shallow water areas besides Cantarell…
Mexico day rates (bareboat) 25
Brazil continued demand growth Positive demand outlook High activity in the Campos basin Primarily maintenance requirements Santos basin opportunities Operators other than Petrobras showing interest in accommodation vessels…
Rest of the world interesting opportunities Australia Some demand related to hook-up and commissioning As fields are getting older, there should be potential for more maintenance and modification related work South East Asia Some…
Rest of the World day rates (time charter) 28
High contract visibility 29
Robust contract backlog But no new contracts signed over past six months Gross value of charter contracts Status end Q3 14 2 500 Firm contracts USD 1,371m + Options (1) USD 783m = Total USD 2,154m 2 000 Options Letter of…
Summary New build projects Safe Boreas in completion phase Safe Zephyrus ready for operations in 2015 Positive outlook in Mexico and Brazil Weak North Sea demand Dividend reduced in order to strengthen balance sheet and…
Agenda Recent developments Financial results Operations/projects Outlook Appendix 32
Vessel motion characteristics Six degrees of freedom refers to the freedom of movement of a rigid body in a three-dimensional space The body is free to move (translation) along three axes Surge (forward/backward or forward/astern)…
Vessel motion characteristics Gangway connecting to a fixed target Connect the gangway Maintain position Accommodation vessel should move as little as possible Gangway connecting to a moving target Connect the gangway Follow target…
Vessel motion characteristics DP vessels See appendix and latest issue of the Prosafe Now magazine (can be found at www.prosafe.com) for more details Source: Prosafe estimates based on available technical specifications 35