Strong Organic Growth Inventory 25 years of Wattenberg 3P inventory (3,500 gross locations) at current drilling pace First test wells in Niobrara A Bench and North Park Basin in 2014 Wattenberg Wattenberg Niobrara B Arkansas Cotton…
2014 CapEx Accelerating Wattenberg Value Wattenberg Field HZ Wells Drilled 2014 Capex (MM): 575 625(1) 140 2014 Drilling Program 121 Operated Wells Non-Operated 120 19 Non-Operated Wells 14% Niobrara A 100 80 ERL 9% 60 Codell…
2014 Completion Schedule & Annual Guidance Wattenberg HZ Well First Production Schedule(1) Q1 Production on plan: 19,701 Boe/d 40 35 30 Steady completions schedule in Q2 Q4 25 promotes linear growth 20 15 Annual guidance…
Wattenberg Field BCEI 70,000 net acres(1) in Extension Area 60% crude oil; liquids-rich natural gas Contiguous acreage attractive for long laterals Preliminary analysis shows limited exposure to potential drilling setback rules…
Pending Acquisition Doubles Acreage Acquisition Highlights 34,600 net acres 23,000 net acres avg. WI 60% Adds 700 net drilling locations(1) Post-Transaction 126,400 gross (70,100 net) acres North Area: 25,700 net Middle…
Super-Section Downspacing & Stacking Test 1 Initial Technical Observations 3 Multi-bench patterns outperform single bench Niobrara C Bench rates consistent with B Bench 20 wells per section is minimum 36 wells per section is…
Improving IP Rates for 40-acre Spaced Wells 18/28 stage 40-Acre Pad Comparison Cum BOE Production 500 fracs 18-stage fracs 20,000 450 481 477 313 MBOE Type Curve 400 18,000 418 16,000 Boe/d 350 374 343 14,000 300 250…
Wattenberg Risked 3P Reserves & Inventory (1) 308 MMBoe Net HZ Risked 3P Reserves 30% Increase in 3P Reserves over 2012 No 3P reserves currently associated with pending acquisition Inventory life of 25 years at current pace…
Wattenberg Hz Niobrara B Target Type Well Type Well Economics EUR 313 MBoe; 62% crude oil(1) Initial 30-day Rate 458 Boe/d Cost per Well 4.2 MM NPV-10 at 90/BO 4.2 MM Payout 1.5 years ROR Sensitivity to Oil Price(2) (1) EUR…
Niobrara B Bench Tracking 313 Mboe Type Curve 15
Mid-Continent Operations (Arkansas) Provides free cash flow; allocated to Wattenberg ERA SYSTEM SERIES GROUP FORMATION CENOZOIC EOCENE Claiborne PALEOCENE Wilcox Cotton Valley: 6,500 8,800 feet TERTIARY CRETACEOUS GULFIAN Midway…
Dorcheat-Macedonia Economics Type Well Economics 10-acre 5-acre EUR(1) 148 MBoe 118 MBoe % Oil & Liquids 65% 65% Cost per Well 1.8MM 1.8MM NPV-10 1.8MM 1.3MM Payout 1.6 years 1.8 years Risked Locations 110 gross(2) 262 gross(2)…
Cotton Valley Lenticular Oil Sands Pin-Point Fracture Technology Focused completion technology Improved recovery of OOIP Highly repeatable Dorcheat Unit 37 25-30 sand/shale sequences Each zone individually pressured Potential…
Financial Overview 19
Oil Weighted Production Result in High Margins Unit Cash Operating Costs (/Boe) Unit Revenue & Cash Margins (/Boe) 25 80 77.54 4.34 70.70 71.85 20 4.35 6.06 68.93 68.47 60 4.98 15 8.63 7.93 4.61 7.51 40 6.87 10 6.34 57.74…
BCEI vs Basin Focused Peers Unit EBITDAX 2014 Production Growth 70 60% EBITDAX / Boe (MRQ) Consensus Production 60 50% Peer Group Peer Group 50 Avg: 40% Avg: 37.89 27% 30% Growth 40 30 20% 10% 20 0% 10 -10% 0…
Financial Summary Simplicity & Transparency = Successful Outcomes Balanced approach to capital allocation Achieve best-in-class growth via an expanding Wattenberg development program Fund oily growth with oily cash flow and prudent…
Investment Recap 25 years of drilling inventory in Wattenberg Field Peer leading production growth rates Accelerating development with increasing activity levels Ability to fund acceleration while maintaining a strong balance…
Corporate Information Company Headquarters Investor Relations 410 17th Street, Suite 1400 James Masters Denver, Colorado 80202 Investor Relations Manager (720) 440-6100 Main (720) 440-6121 jmastersbonanzacrk.com (720) 305-0804…
BCEI Acreage Correlation to Wells Ranch Niobrara A Bench Thinner and resistivity less developed A Niobrara B Bench Similar thickness and resistivity A Niobrara C Bench Slightly thinner lower chalk bench; similar resistivity…
Testing New Completion Design: 28 stage fracs 18 Stage Frac 80 Acre Spacing 18 Stage Frac Used on over 100 Niobrara/Codell wells Sliding sleeve delivery system Designed for maximum frac extension away from the Unstimulated Reservoir…
DJ Basin Midstream Infrastructure Capacity Crude Pipelines and Rail Projects Operator Origination Termination Hub Timing (Bbl/d) White Cliffs Pipeline SemGroup 75,000 Platteville, CO Cushing, OK Existing White Cliffs Expansion SemGroup…
Easing High Line Pressures in Wattenberg BCEI Considerations High line pressures caused by constrained gas processing capacity Legacy vertical wells impacted more than newer horizontal wells 95% of BCEI production in Q1 2014 came…
Dorcheat-Macedonia Type Curve(1)(2) 120 Recompletions opening additional Cotton Valley oil pay zones up hole 100 80 Boe/d 60 40 20 0 0 12 24 36 48 60 Months 10-acre 5-acre (1) The type curve shows the…
Reconciliation to Adjusted EBITDAX Adjusted EBITDAX is a supplemental non-GAAP financial measure that is used by management and external users of the Companys consolidated financial statements, such as industry analysts, investors,…