  1. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 1
    Primeline Energy Holdings Inc: Producing to Chinas dynamic gas market and monetizing upside November 2014 1 Primeline Corporate Presentation November 2014
  2. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 2
    PEH - Producing to Chinas dynamic gas market 1. High growth, high price East China gas market for investors via TSX-V listed Primeline Energy Holdings Inc. - with secured access to market. 2. 700m+ regional production infrastructure…
  3. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 3
    East China gas market - High growth, high price Chinas dynamic economic growth in the past 25 years has created the worlds 2nd largest energy market. Chinas energy needs are presently met mostly by coal and oil (40% of which is…
  4. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 4
    Gas sale contract access to 8 bcmpa Zhejiang Gas Grid LS36-1 is a strategic gas field close to Zhejiang Province - Ningbo population of 50 LNG million; 4th largest economy in China, Current gas utilisation of only about 2.8% of…
  5. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 5
    East China Sea becoming a significant gas production basin Proven petroleum province, defined exploration targets. New E&P focus in Xihu Trough (Basin) in northern East China Sea, anchored on two existing fields: Pinghu Field:…
  6. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 6
    Primelines Structure and our Petroleum Contracts Primeline (PEH) has 75% and Primeline Petroleum Corporation (PPC) has 25% of Contractors Rights respectively on two Petroleum Contracts in the East China Sea Block 25/34 and Block…
  7. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 7
    LS36-1: Infrastructure hub is completed and producing All development work completed and production started: Platform facility Development wells: 4 Subsea pipeline: 126.9km Onshore terminal: Sale gas pipeline Terminal to…
  8. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 8
    LS36-1: Reserves Two discovery wells, DST tested at 9.8 MMcfd and 12.6 MMcfd Phase 1 four producers drilled and completed in April 2013 Flow test finished in May 2014, production since July 2014 McDaniel and Associates Proved +…
  9. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 9
    LS36-1: Budget and Project Finance Total Investment Budget circa US 727M including Development Capex circa US 608M, some will be spent after production Primelines share of Capex (PEH+PPC 49%: US 297M; PEH 36.75%: US 223M) has been…
  10. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 10
    Valuation has not yet reflected impressive operational progress Production started ODP approved Dev. Drilling completed Jacket installed Fabrication Agreement signed 10 Primeline Corporate Presentation November 2014
  11. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 11
    Block 25/34(85 km2) & Block 33/07 (5,877 km2) Development completed for LS36- 1 gas field, secured Newly acquired market access and 600 km2 of 3D built regional seismic production infrastructure hub. High impact exploration to…
  12. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 12
    Additional high margin resources will be drilling from 2015 on Block covers majority of the Lishui Basin which has: Primelines exploration wells which led to the new discovery seven regional wells in and around the basin have…
  13. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 13
    Prospective Resources McDaniel July 2014 Prospective Resources - Natural Gas Risked (2) Prospective Resources - Unrisked (1) Chance of Resources Success Prospect Low Medium Mean High Mean MMcf MMcf MMcf MMcf MMcf % LS36-1…
  14. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 14
    Additional resources in lower zones Current Producers are in M1-1 an M1-2 sands. Additional gas in other sands and in lower tight reservoir, Cross-section of LS36-1 M11 M12 M2 M31 M32 L1 L2 14 Primeline Corporate…
  15. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 15
    Reserve additions via Phase 2 drilling from platform Existing wells shown in black LS36-1 M11 Sth well LS36-1 M10 well 30-8 Exploration Prospect Wells LS36-1 M2 & M3 LS36-1 M11 SW well wells 8 locations and well…
  16. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 16
    M10 Untested Sand Designed as deviated well targeted to thick M10 section. Well penetrates entire M10 stratigraphic section. M10 GIIP calculates with Prospect Range of: P90: 6.8 P50: 13.3 P10: 26.0 Top M10 3D Horizon Bcf…
  17. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 17
    LS36-1 Field and Nearby Prospects New 600 sq. km 3D seismic in 2014 to expand coverage in the gas play acquisition completed in May 2014; processing in progress; interpretation nearly completed. Additional 3D seismic may be…
  18. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 18
    Lishui Gas Play LS30-3-1 LS30-3 LS29-2 LS36-1 Platform LS35-1 LS35-3-1 Discovery LS35-3 18 Primeline Corporate Presentation November 2014
  19. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 19
    Valuation reflects neither progress to date nor upside potential Market access to one of the most dynamic but energy short provinces in China High gas price region. Long term close relationship with CNOOC. Management with proven…
  20. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 20
    Appendices Supplementary Technical and Operational Data Board of Directors Management and Technical Team Corporate Structure 20 Primeline Corporate Presentation November 2014
  21. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 21
    LS36-1: Development schedule Development Programme Activity 2008 2009 2010 2011 2012 2013 2014 9 11 1 2 3 4 5 6 7 8 9 11 1 2 3 4 5 6 7 8 9 11 1 2 3 4 5 6 7 8 9 11 1 2 3 4 5 6 7 8 9 11 1 2 3 4 5 6 7 8 9 11 1 2 3 4 5 6 7 8 9 Gas…
  22. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 22
    LS36-1: Development milestones Commercial Agreements Gas Sale Agreement-in-principle signed, subsequent Framework and Amendment Oct 2008 Agreements signed in 2011 and 2012 End 2009 Overall Development Program completed March…
  23. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 23
    Development in Images Jacket Installation Development Drilling Topside lifted April 2013, July 2012 completed April 2013 installation completed June 2013 23 Primeline Corporate Presentation November 2014
  24. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 24
    Onshore Processing Terminal Burner Storage Central Control Office & Living Lab Operation & CO2 Fire-fighting Processing Loading Gas Zone Processing Slug Catcher 24 Primeline Corporate Presentation…
  25. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 25
    LS36-1: Wells LS36-1-2 LS36-1-1 A3 A5 A4P P Proposed Horizontal Well A2H A1M M1-0 Mapped Area Top M1-2 / M1-1 Merged & M1-0 (Patch) Contoured to GWC (5m CI) 25 Primeline Corporate Presentation November 2014
  26. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 26
    LS36-1: Production well design Horizontal and Multi-Lateral Gas Production wells increase potential gas rates, especially in tight gas reservoirs, and increase effective drainage area. A5 A3 drilled as a Vertical well to allow…
  27. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 27
    Board of Directors Victor Hwang Chairman and President Mr. Hwang is Executive Director of the publicly listed Hong Kong Parkview Group Ltd., a division of the family controlled Chyau Fwu Corporation. Parkview's core business includes…
  28. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 28
    Board of Directors Peter Kelty Non-Executive Director Mr. Kelty has extensive experience in restructuring and financing major Asian regional corporations as well as advisory work for European and US multi-nationals. Mr. Kelty is a…
  29. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 29
    Management & Technical Team Ming Wang Director and CEO Dr. Wang holds a PhD in Geology from Imperial College, London. He joined Primeline in January 1994 and was appointed as Vice President of Exploration in December 1996. Since then he…
  30. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 30
    Management & Technical Team Alan Soulsby Technical Director Mr. Soulsby graduated from Oxford University with a degree in Physics in 1970 followed by a Masters in Geophysics. He has had a wide and varied career in the petroleum industry…
  31. INVESTOR PRESENTATION – Primeline Energy Holdings – slide 31
    Corporate Structure Trading Symbols PEH - TSX Venture Exchange Outstanding Shares 112,791,018 Fully Diluted Shares 123,016,068 Fully Diluted Proceeds 7.2M (C) C0.67 average strike price Corporate Debt 8.0M (C) Interest free from…

From the store

Browse maps, data & reports in the Shale Experts store