TD London Energy Conference Robert Peabody - COO January 13th, 2014
Overview Balanced growth strategy delivering Consistent execution driving performance and improving returns Transforming the foundation Advancing growth pillars 2
2014 Capital Expenditures and Production Guidance Capital Expenditures (billions) Production (mboe/day) 6 400 Forecast range 330 355 mboe/d Forecast range *5.0 350 310 330 mboe/d 5 4.8 Midstream/ Downstream/ Corporate 300…
On Track to Achieve Our Targets 2013 Q3 YTD 2012-2017 2012 Actual (9 months) Target Production (mboe/d) 301.5 313 5-8% CAGR 155% Reserve Replacement 140% 2 year On track Ratio average average Return on Capital 9.5% 9.5%…
Focused Integration Achieving World Market Prices Realized Pricing on Upstream Production Processed (Nine Months to September 30, 2013) 160.00 140.00 Brent Pricing Realized Price /bbl 120.00 Benchmark 100.00 US Refining…
Foundation
Heavy Oil Transforming the Foundation Through Thermal Projects 70 years and over 900 million barrels recovered New technologies continue to increase recovery Production growth over the plan period driven by thermal projects…
Heavy Oil Thermal Projects Production Growth Current projects producing Thermal Project Production (bbl/d) Development over 37,000 bbls/d at Q3 2013 Timeline 1 Existing Projects 37,000 Producing Projects in place to accelerate…
Heavy Oil Thermal Project Economics Metric Target New projects have Construction 2 years competitive SORs Maximum work force 200 during construction Lower operating costs and higher Start up to peak Less than 6 months price…
Western Canada - Transforming the Foundation Through Resource Plays Resource Play Maturity Curve Appraisal and Dry gas Identify & Capture/ Commercial Commercial Liquids-Rich Gas Geologic De-risking Development De-risking High…
Downstream Reliability/Flexibility Downstream Assets Capacity (mbbls/day) Lima Increase feedstock and product flexibility Lima 160 Feedstock flexibility project to take up to Toledo (Huskys 50% WI) 65 40,000 bbls/d of heavy crudes…
Growth Pillars
Liwan Progress Project progressing Over 95% complete Deepwater almost complete Drilling finished and completed Main pipeline installed Connecting lines and controls Topsides float over Shallow water in commissioning Topsides…
Liwan Economics Liwan 3-1 / 34-2 Production Exploration costs of 700 million priority recovery from first gas largely recovered in 2014 Operating costs 10% of gross revenues Royalties and taxes 20% of gross revenues 1 Five-year…
Sunrise Energy Project Approximately 85% complete Large resource base 3.7 billion barrels of 3P reserves1 Sunrise Phase 1 and 2 approvals in place for 200,000 bbl/day (gross) Excellent reservoir quality and oil saturation Cost…
Sunrise Milestones Milestone Expected Action Timeframe Drilling spud first horizontal well Q1 2011 Completed Commence major construction Mid-2011 Completed Sunrise May, 2011 Completed ahead of Drilling complete 2nd Half 2012…
Atlantic Region Big fields get bigger White Rose produced its originally sanctioned 200 millionth high netback barrel in January 2013 Northern Drill Centre Near-field developments progressing North West White Gas Injection Rose…
Exploration Success Flemish Pass discoveries mark a significant new development opportunity Mizzen Harpoon Considerable upside with very Bay du Nord attractive targets still to be drilled in both the Flemish Pass and the…
Summary Balanced growth strategy delivering Consistent execution driving performance and improving returns Transforming the foundation Advancing growth pillars 19
Advisories The Company uses the term barrels of oil equivalent (boe), which are calculated on an energy equivalence basis whereby one barrel of crude oil is equivalent to six thousand cubic feet of natural gas. Readers are cautioned that…
Resource Play Summary Western Canada Total Approximate PIIP Production Resource Play Net Acres mmboe* boe/d /section Established Oil Slater River Bakken 18,000 Viking 60,000 Oil 5 - 10 Cardium 10,000 7,000 Lower Shaunavon 14,000…
Resource Play Reserves Summary at December 31, 2012 Proved Reserves Probable Reserves Possible Reserves Resource Play Oungre Bakken 3,034 mbbl 873 mbbl - Redwater Viking 6,480 mbbl 608 mbbl - Alliance Viking 1,984 mbbl 17 mbbl -…
Madura Developments Field Production Budget Development Prices Status (Net) (gross) MDA & 60 mmcf/d gas US120- Two wellhead Expecting Plan of Development (POD) submitted MBH US150MM platforms and pipeline US 6-8/mcf Upon POD approval…
Exploration/Development Opportunities Asia Pacific South China Sea Indonesia China Taiwan Kaohsiung Hong Kong Taiwan Block Liwan Haikou Wenchang Hainan Exploration opportunity offshore Taiwan Proven knowledge of…
South White Rose Extension Project Combined oil production and gas and water injection centre 20 MMBBLS (3P reserves1) of oil (net) (on production 2014) Budget: 800 million (net) Milestone Expected Action Timeframe Gas injection Q2…
West WestWhite WhiteRose ExtensionProject Rose Extension Project Wellhead Platform 80 MMBBLS (3P reserves1) of oil (net) (on production 2016/17) Concept evaluation includes Wellhead Platform Milestone Expected Action Timeframe…
Emerging Exploration Opportunities Atlantic Atlantic Canada Greenland Mizzen Harpoon Bay du Nord White Rose Aster Hibernia Terra Nova 25 years of proven exploration, development and operation expertise in harsh…