    CORPORATE PRESENTATION 2014
  2. Corporate Presentation – Calvalley Petroleum Inc. – slide 2
    Highlights Gross production capability approx. 5,200* bpd (2,600 bpd net) Crude oil price realizations close to Brent prices Low historical cost structure provides strong netbacks and earnings Low risk development potential Large…
  3. Corporate Presentation – Calvalley Petroleum Inc. – slide 3
    Market Information Listing and Symbol: TSX Toronto CVI.a Total Shares outstanding: 77.9 mm* Management & Directors: 25.5% 2013 Avg. daily trading volume: 45,000 Trading Range 2013: Cdn 1.38 Cdn 2.17 * April 2014 May 2014
  4. Corporate Presentation – Calvalley Petroleum Inc. – slide 4
    Block 9 (Yemen) May 2014
  5. Corporate Presentation – Calvalley Petroleum Inc. – slide 5
    Attractive Fiscal Terms Royalty 10% Yemen Interest 70% 43.525% Profit Oil 45% 15% 30% 85% 100% Contractor Cost Oil Interest 45% 56.475% May 2014
  6. Corporate Presentation – Calvalley Petroleum Inc. – slide 6
    2013 Producing Reserves by Field Proved developed producing (PDP) Gross Hiswah 69% PDP Technical Reserves (9 mmbbl) Ras Nowmah 19% Hiswah Al Roidhat 12% - 1,077 Ras Nowmah 1,758 PDP PV10 (AT) US 100 mm (gross) 6,361 Al…
  7. Corporate Presentation – Calvalley Petroleum Inc. – slide 7
    2013 2P Reserves by Field Proved plus probable reserves (2P) Gross 2P Technical Reserves Hiswah 62% (51 mmbbl) Ras Nowmah 16% Hiswah Al Roidhat 19% 1,242 Ras Nowmah 9,821 Other 3% 8,307 32,021 Al Roidhat 2P PV10 (AT) US…
  8. Corporate Presentation – Calvalley Petroleum Inc. – slide 8
    Hiswah Field Reserves Hiswah (Saar / Naifa) Proved plus probable (per independent reserve report - gross) Proved (1P) Proved plus Probable (2P) plus possible (3P) Discovered Petroleum Initially in Place (MMb) 228.4 229.4 233.1…
  9. Corporate Presentation – Calvalley Petroleum Inc. – slide 9
    Ras Nowmah Field Reserves Ras Nowmah Proved plus probable (per independent reserve report - gross) Proved (1P) Proved plus Probable (2P) plus possible (3P) Discovered Petroleum Initially in Place (MMb) 21.8 21.8 25.1 Estimated…
  10. Corporate Presentation – Calvalley Petroleum Inc. – slide 10
    Al Roidhat Field Reserves Al Roidhat Proved plus probable (per independent reserve report - gross) Proved (1P) Proved plus Probable (2P) plus possible (3P) Discovered Petroleum Initially in Place (MMb) 62 62 62 Estimated…
  11. Corporate Presentation – Calvalley Petroleum Inc. – slide 11
    Ras Nowmah South Field Reserves Ras Nowmah South Proved plus probable (per independent reserve report - gross) Proved (1P) Proved plus Probable (2P) plus possible (3P) Discovered Petroleum Initially in Place (MMb) 6.1 6.1 6.1…
  12. Corporate Presentation – Calvalley Petroleum Inc. – slide 12
    Brent Oil Price Trend (US) Calvalley realizes close to Brent prices 120 100 80 60 Dated Brent Price Calvalley Realized Price 40 20 0 2009 2010 2011 2012 2013 May 2014
  13. Corporate Presentation – Calvalley Petroleum Inc. – slide 13
    Net Asset Value US per share NAV (Dec 2013) PV10 (2P) AT 4.50 4.00 3.50 3.00 2.50 2.80 Reserves 2.00 1.54 Working Capital 1.50 0.64 1.00 0.50 1.11 1.11 1.11 0.00 PDP TP 2P May 2014
  14. Corporate Presentation – Calvalley Petroleum Inc. – slide 14
    Operations YEMEN BLOCK 9 May 2014
  15. Corporate Presentation – Calvalley Petroleum Inc. – slide 15
    Discoveries and Prospects Yemen Block 9 Commercial Discoveries: Hiswah (producing) Al Roidhat (producing) Ras Nowmah (producing) Ras Nowmah South (producing) Auqban (produced in past) Technical Discoveries: Malik (Multi zone) Al…
  16. Corporate Presentation – Calvalley Petroleum Inc. – slide 16
    Significant Seismic Coverage Current Seismic Coverage: 3,700 km of 2D seismic data Good coverage in the wadi Limited coverage over the plateau 63 km2 of 3D seismic data Hiswah Field May 2014
  17. Corporate Presentation – Calvalley Petroleum Inc. – slide 17
    Infrastructure Facilities and Transportation - Yemen Central Processing Facility: Complete and fully operational (capacity of 15,000 bbl/d expandable to 60,000 bbl/d) 55,000 bbl crude oil storage capacity Transportation and…
  18. Corporate Presentation – Calvalley Petroleum Inc. – slide 18
    Low Risk Development Upside Hiswah Field (36 API oil) 33 producing wells drilled: 25 wells producing Pressure Maintenance Program: Water Injection: current injection 6,000 bwpd; to increase to 20,000+ bwpd Gas Injection: currently…
  19. Corporate Presentation – Calvalley Petroleum Inc. – slide 19
    Hiswah Field Reservoir Saar/Naifa Carbonates Discovered petroleum 229 mmbo Sweet crude 36o API Daily Production (Dec 2013) 3,000 bopd Wells will be drilled as horizontal injectors to aid full field pressure maintenance and…
  20. Corporate Presentation – Calvalley Petroleum Inc. – slide 20
    Al Roidhat Field Discovered petroleum 62 mmbo 15 degree Sweet Crude Daily Production (Dec 2013) 750 bopd Current plan includes 5 vertical producers to be drilled in Al Rhoidat. Reservoir quality is excellent Wells will be…
  21. Corporate Presentation – Calvalley Petroleum Inc. – slide 21
    Ras Nowmah Field Discovered petroleum 22 mmbo 29 degree API Sweet Crude 35m oil column in the Qishn Sands (S1+S2+S3) Excellent reservoir quality Daily Production (Dec 2013) 1,350 bopd Current plans include two development wells…
  22. Corporate Presentation – Calvalley Petroleum Inc. – slide 22
    Ras Nowmah South Field OWC in S2= 235m SS Daily Production (Dec 2013) 100 bopd (RNS-1) RNS-2 was drilled in 2013 and has been completed and placed on production in April 2014 OWC seen RNS-2 current production in RNS-2 approx.…
  23. Corporate Presentation – Calvalley Petroleum Inc. – slide 23
    Auqban Field Discovered petroleum -6 mmbo Pay in the limestones of the Shuqra formation (9m) and sands in the Kohlan (2m) formation Initial test rates up 414 bopd Good quality crude 38o API Well shut in due to wax and paraffin…
  24. Corporate Presentation – Calvalley Petroleum Inc. – slide 24
    Qarn Qaymah Field Two Discoveries on the Structure (34 sq.km) Kohlan Sandstone Reservoir 12 meters of blanket sand over an area covering more than 34 km2 Tested gas condensate in both QQ-1 and QQ-2 wells QQ-1: 10 mmcf/d and 657…
  25. Corporate Presentation – Calvalley Petroleum Inc. – slide 25
    Facility Projects Hiswah Field Pressure Maintenance Ras Nowmah Field Water Separation Al Roidhat Field Water Separation Inter-field fluid pipeline May 2014
  26. Corporate Presentation – Calvalley Petroleum Inc. – slide 26
    Exploration Potential Block 9 Potential by Stratigraphic Horizon Drill Ready Prospects green star Rashedah Gadafir Lokhaymer Saghira Ras Noor South May 2014
  27. Corporate Presentation – Calvalley Petroleum Inc. – slide 27
    2D Seismic Program Current Program approx. 1,000 km Proposed seismic lines shown in red (3D in green) The 2D seismic will target structures that have been mapped but need more seismic control to de-risk prospects Note: Layout…
  28. Corporate Presentation – Calvalley Petroleum Inc. – slide 28
    3D Seismic Program The fully migrated image area is approximately 18 km x 18 km = 330 sq. km The 3D is designed to cover the Qarn Qaymah area which has flowed oil, gas and condensate to the surface in the QQ-1 and QQ- 2 wells The…
  29. Corporate Presentation – Calvalley Petroleum Inc. – slide 29
    Barriers to Growth - Yemen Service company availability Logistics and planning Equipment availability Approvals May 2014
  30. Corporate Presentation – Calvalley Petroleum Inc. – slide 30
    2014 Plans Resolve current barriers to growth in Yemen Implement low risk field development plans Develop infrastructure to handle increased production Seismic acquisition program Identify diversification opportunities May…
  31. Corporate Presentation – Calvalley Petroleum Inc. – slide 31
    Summary High netback crude oil Organic growth potential Strong balance sheet Secondary recovery upside Multi year drilling inventory Low risk development Opportunistic acquisitions Exploration opportunities May 2014
  32. Corporate Presentation – Calvalley Petroleum Inc. – slide 32
    Contact Information Calvalley Petroleum Inc. 2100 500-4th Avenue SW Calgary AB. T2P 2V6 T: (403) 297-0490 F : (403) 297-0499 Website: www.calvalleypetroleum.com For more information please contact: Edmund Shimoon, Chairman &…

From the store

Browse maps, data & reports in the Shale Experts store