May 2014 Corporate Presentation – Nuvista Energy Ltd.

Nuvista Energy Ltd. · May 20, 2014 · 32 slides

Investor presentation from the Shale Experts oil & gas presentation and slide database. Every page is imaged and its text indexed for search across operators, plays, basins and time.

Slides

  1. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 1
    CORPORATE PRESENTATION May 20, 2014 All amounts in Canadian dollars unless indicated otherwise
  2. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 2
    NuVista Overview Focused profitable growth with long line-of-sight 1. Focus of growth in Wapiti area of Alberta condensate-rich Montney 2. In early development phase with rapidly increasing well data 3. Strong economics associated…
  3. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 3
    Alberta Condensate-Rich Montney tremendous potential for profitable growth World Class Play Alberta condensate-rich Montney The sweet spot in a world class play 1. Scalable and Repeatable Play 113,000+ net acres (179 net sections)…
  4. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 4
    The Alberta Condensate-rich Montney Surge in activity, new well data, new entrants Elmworth to Kakwa Montney HZ Activity Update High and growing level of industry activity 48 miles 200 industry wells on map sheet, and rising T71…
  5. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 5
    2014 Business Plan Development, infrastructure, and delineation 1. Focus on Montney Development Drilling 70% of wells in condensate-rich Bilbo Area Evaluation of recent record-high results in Elmworth (North) and Bilbo (South) Block…
  6. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 6
    NuVista Wapiti Montney Our activity and landholdings Increasing Activity Elmworth 18 wells on production building Development T69 volumes in advance of South Block Block facility ramp up in Q3/Q4 14 Additional Wells…
  7. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 7
    Contingent Resource / 2P Reserves Significant delineation of resource and conversion to reserves in 2013 Middle Montney 'C' Middle Montney 'B' CR: 85 sections 45% of current net acres - 263 Locations (Gross) CR: 101 sections - 54% of…
  8. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 8
    Bilbo Development Block All locations no more than 1 mile from existing proven typecurve producers Typecurve 100* total locations in development area Bbls/MMcf Trend of improving liquids yields Condensate 8 5 Butane Propane 75…
  9. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 9
    Montney Performance South Block (Bilbo) Condensate 75 Bbls/MMcf 2,000 10 Cumulative-to-Date Bbls/MMcf Condensate 12 10 Continue to see Butane 1,600 strong condensate 8 Propane 88 yield 75 Bbls/MMcf Q1 2014 Field Netback…
  10. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 10
    Elmworth Development Block All locations no more than 1 mile from existing proven typecurve producers Typecurve 100 Total Locations identified within development area Bbls/MMcf Typecurve increased from 4.4 Bcf to 6.0 Bcf Condensate…
  11. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 11
    Montney Performance North Block (Elmworth) Condensate 45 Bbls/MMcf Cumulative-to-Date Bbls/MMcf 4.4 bcf Type Curve 6 bcf Type Curve First 3 wells Last 4 wells 10,000 Condensate 11 Increased typecurve to Butane 9 9,000 6 Bcf based…
  12. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 12
    Wapiti Montney Processing Capacity Firm Capacity and line-of-sight to growth Wapiti Montney Raw Gas Processing Capacity And Estimated Equivalent Montney Production 200 40,000 180 Newly added capacity contract SemCAMS Estimated…
  13. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 13
    Wapiti Montney Processing Capacity Additional long term infrastructure opportunities Wapiti Montney Raw Gas Processing Capacity And Estimated Equivalent Montney Production 200 40,000 New Sour Gas Plant 180 Estimated Equivalent…
  14. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 14
    Wapiti Montney Egress Access to short and medium term egress Loop pipeline to existing SemCAMS K3 gas plant and build Compressor Station NuVista (50%) Compressor Station New NuVista (100%) CNRL Gold Creek Plant Compressor…
  15. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 15
    Wapiti Montney Egress and still more options for the long term Further expansion to existing SemCAMS K3 gas plant NuVista (50%) Potential for new Wapiti gas plant in Compressor Station area New NuVista (100%) CNRL Gold Creek…
  16. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 16
    Montney D&C - Drilling Reduced drilling time and costs Steady progress reducing drilling times 0 Days versus Depth Steady progress and drill cost per meter 1000 reducing drilling Q1 2013 AND PRIOR 2013 WELLS times, evolving to…
  17. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 17
    Montney D&C - Completions Focused on optimizing recovery NuVista's completion process Open-hole completion with ball-drop frac technology Large volume slickwater fracs Longer laterals with more frac intervals Manage risks of greater…
  18. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 18
    Operating and Financial Results Understanding the financial power of the Montney Corporate Cash Flow Corporate Cash Flow Netback 35 25 31 30 19.26 20 25 23 22 12.99 Million 20 19 15 11.72 13.59 /Boe 8.67 15 10 12…
  19. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 19
    Line-of-Sight to Future Growth Increasing production + increasing netback Production ('000 Boe/d) Corporate Netback 2 30 Flat '14/15 despite Strip backwardation 25 100% Montney % of Total Production 25 21.00 20.50 20…
  20. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 20
    NuVista: Looking Forward The corner has been turned Now we grow Focused, repeatable and profitable Costs falling, condensate rising, completions improving Two project development areas define certainty Long-term gas processing and…
  21. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 21
    APPENDIX May 2014 21
  22. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 22
    Commodity Price Risk Management WTI Oil we are well hedged Crude Oil Hedge Position 3,500 105.00 3,000 100.00 Hedged Volume, Bbl/d 2,500 Price, C/Bbl 95.00 2,000 1,500 90.00 Floor C WTI price of 94.85/Bbl on 60%…
  23. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 23
    Commodity Price Risk Management AECO natural gas hedging in good shape Natural Gas Hedge Position 100,000 4.50 90,000 4.00 80,000 3.50 Hedged Volume, GJ/d 70,000 3.00 Price, C/GJ 60,000 2.50 50,000 2.00 40,000…
  24. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 24
    Condensate Pricing Strong demand and premium price for the long term Condensate is used in Alberta as a diluent to ship heavy oil on pipelines Condensate in Alberta is typically priced at a premium to C WTI and Edm Par crude oil…
  25. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 25
    Montney IP30's Increasing condensate volumes Well IP30* Cumulative to date** May 3, 2014 CGR Cumulative Raw Gas Condensate Total Sales CGR Bbl/MMcf Condensate Total Days on Prod. Bbls/MMcf Sales Gas (MMcf/d) (Bbls/d) (Boe/d)…
  26. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 26
    The transformation is complete growth is next Focused on World Class Montney Play Condensate-Rich Strong Economics Line-of-Sight to Future Growth Prudent Debt Management Disciplined Approach to Growth 2011 Production Mix Q1 2014…
  27. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 27
    Corporate Strategy Disciplined approach 1. Focused on Condensate-rich Wapiti Montney 500 Capital Expenditures 90% of 2014 capital expenditures in Wapiti 400 300 Million 2. Profitable Growth 200 Cash flow/share growth…
  28. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 28
    Advancing the Wapiti Montney Plan The track record to date 2011 2012 2013 NVA Producing Horizontal Wells 1 5 16 (Cumulative) Rigs Drilling 0-1 1-2 2-3 Annual Production 281 1,265 4,650 (Boe/d) 2P Reserves* 12 MMBoe 29 MMBoe…
  29. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 29
    2013 Reserves Report Montney begins to dominate and show scale it's only the beginning 2013 Year Reserves Report - GLJ Petroleum Consultants Ltd. Montney 2P reserves volume increased by 195% for recycle ratio of 2.3x Corporate 2P…
  30. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 30
    Resource Study Summary* Contingent Resources doubled Sept. 2012 to Sept. 2013 100 million Bbls recoverable condensate and counting Discovered Petroleum Initially-In-Place(1) See Appendix for Cumulative Production(2) 0.01 Tcfe…
  31. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 31
    Wapiti Montney Geological characteristics of a world class resource play Scalable/Repeatable Thick Formation Deposition on the shelf edge - not isolated pockets 150 200 metres Gas charged top to bottom At least 3 developable layers…
  32. May 2014 Corporate Presentation – Nuvista Energy Ltd. – slide 32
    Focus on Wapiti Our lands contain the Montney with the bonus of significant Deep Basin uphole potential Acres 000's CARDIUM Nikanassin Dunvegan MONTNEY Cadomin Cardium Falher FAIRWAY DUNVEGAN CADOTTE…