2015 Expansion Program Summary REVISED Capex Program 978MM(a) S&T 454MM Capex (includes 36MM Cap OH & Cap CO2) 454MM 47% Continue Cow Canyon Development Wink to Colorado City pipeline Hovenweep Cooling St Johns unit and Lobos…
CO2 Source & Transportation Continuing Business Opportunities Record Year for SW Colorado Production Permian Basin CO2 Deliveries MMcf/d 1800 Other 1600 1400 1200 1000 Sheep Mtn. 800 Bravo Dome 600 400 McElmo Dome & Doe…
CO2 Entitlement Volumes Produced and Sold to our Customers CO2 KM-share MMcf/d Significant growth since 2005: CAGR: volumes +5.57% 800 No decline in CO2 demand in 2009 2015 vs 2014: volumes +9.05% 700 600 As a reminder: 500…
Demand Growth and Regeneration 5-year Contracted CO2 Volumes CO2 Daily Contract Quantities MMcf/d 2006 2015 1,200 1,000 Previously higher oil prices increased long-term demand for CO2 800 Weighted average contract life with 600…
Serving the Market Timely Supply Expansions Southwest Colorado CO2 Production Volumes as of: Actual Actual Actual Budget 2012 2013 2014 2015 Future MMcfd MMcfd MMcfd MMcfd Potential SWC Actual Average Daily Volumes 1,212 1,218 1,282…
McElmo Dome Field Expansion Cow Canyon Development Projected Production Forecast (MMcf/d) Additional 200 MMcf/d Opportunity 1.6 1.3 TCF reserves potential 1.4 Cow Canyon Known area from past drilling 1.2 1.0 Project Costs…
St. Johns Development Project Update Develops additional 300 MMcf/d AZ Cortez CO2 Pipeline 1.3 TCF reserves potential 450 sq. mi Unit, 300 sq. mi developed NM 216-mile Lobos PL w/interconnect to Cortez 216 mi Lobos CO2 Pipeline…
Cortez Pipeline Expansion Project Expansion enables significant growth in CO2 supply to the Permian HW/CC Cow Booster Station Increases current capacity from 1.3 Canyon Bcf/d to nearly 2.0 Bcf/d Cortez Station La Plata Station…
Oil and Gas Segment Production and DCF Net Hydrocarbon Production (Mboe/d) Original oil in place (Billion Bbls) SACROC Yates Katz GLSAU Gas Processing SACROC 2.8 60.0 50.0 Yates 5.0 40.0 Katz 0.23 30.0 GLSAU 0.48 20.0 Gross…
Oil & Gas Margins and Cost Structure Oil & Gas Cash Cost Structure(a) (/Net Boe) 100 O&G cost structure has strong 90 80 correlation to energy prices 70 60 Power is tied to gas prices 50 40 High activity levels have…
Oil and Gas Segment Over past 7 years capex 0.5% above plan, oil production 0.1% below plan Capex (MM) Net Oil Production (MBbl/d) 600 45 40 500 35 400 30 25 300 20 200 15 10 100 5 - - 2008 2009 2010 2011 2012 2013…
SACROC Production & Operations Highlights Oil Production 2003-2015 (MBbl/d) 2014 Review 40 Actual Budget Oil production 7.1% above plan 35 Harvest better than expected 30 Infill results significantly better than plan 25 Platform 2…
SACROC Unit Harvest Project: 2,200 Bbl/d of incremental oil & 45 MMcf of additional recycled CO2 to inject Harvest Production 2012 and 2013 projects 3-5 2-2 3-6 2-1 3-7 2-6 2-4 3-8 4-3 4-1 3-3 3-2 3-1 Pump…
SACROC Unit Bypassed Pay Project Middle Canyon re-development (CR 1 and 2) S Platform Injection began on 8/5/14 current 30 MMcf/d 78% of injection going into 2 heel patterns Production exceeding expectations Injection sleeves can…
SACROC Unit Infill Drilling Project Denser-spaced Platform Drilling Project 26 GZ PO wells currently producing 3,600 Bbl/d 3 Conventional Infill wells producing 712 Bbl/d Results indicate that 104 solid prospects exist Defers…
SACROC Unit Long Range Plan SACROC Oil Production LRP Changes from 2014 plan 40,000 104 Well Platform Infill 35,000 Program identified 30,000 Chiquita Expansion projects added 25,000 Platform 4, Platform 5 and BOPD_Actual West…
Yates Production Steady 2014 Oil Production (Bbl/d) Oil Production 1.7% below plan 25,000 Oil column is stable Continued success in targeted East Side drilling 20,000 Focus deeper completions to minimize gas 15,000 West Side…
Katz CO2 Project Production Building on Slower Trend Investment 258MM project total, 225MM through 2014 Bbl/d Continued expectation of 16% recovery and 7000 25.1 MMBbls reserves 6000 Oil Response Oil rate improved 3,605 to 3,910…
GLSAU Production 2014 Results: - Oil Production below plan - Opex over plan 2013-14 Oil Production (Bbl/d) 3,000 Operational and Reservoir challenges: 2,500 Oil Processing rate slower than expected 2,000 2014 Budget Conformance…
GLSAU Production Strategies to address the challenges: 2015 Oil Plan (Bbl/d) Improve Response 3,000 Execute wellwork for the impaired wells Oil Improve processing rates 2,500 2015 Budget Infill drill 2,000 BOPD Stimulate…
KM ROZ Phase I Project San Andres ROZ oil saturation similar to water-flooded main pay San Andres KM ROZ Phase I Production Forecast Several significant San Andres ROZ projects underway in San Andres Phase 1 88.3 MM CAPEX Nine…
KM ROZ Future Development 6 Section Development Based On 3D Seismic, Cores, Well Logs 194 Patterns 194 WAG Injectors 233 Producers Peak Oil Rate: 25,000 Bbl/d (2021) 93.5MM STBO Reserves 12% Recovery Factor 647 BCF CO2…
Oil and Gas Segment Production Forecasts Production expectations tend to grow over time Evolution of Forecasted 2015 Production(a) over Time (MBbl/d, 8/8ths) We expect production to exceed our reserve report over the long-term 60…
Oil & Gas, and Business Unit IRR 30% All-in O&G IRR (2000-2024) 22.5% 10-K + Reserve Report Required disclosures in 10-K plus Gas Processing proved reserves cash flows: 16.9% Total 25% Adding in Gas Processing…
Response to Current Oil Price Environment Focus on Costs SACROC, Yates and S&T have low cost structures GLSAU Katz Tall Cotton 1% 1% Cash lifting cost per BOE 4% SACROC 11.62 Yates 7.90 S&T Projects profitable at current prices…
KM CO2 Current Outlook Development Plans 2015-2023 10 Year SACROC Group Forecast KM Share Cap CO2 & Continue platform development plan; production forecast is based on Net BOE (a) Capex Overhead existing recovery expectations…