Rockhopper Corporate Overview Our strategy is to create value through building a well-funded, full-cycle, explora5on led E&P company We aim to do this by: Maintaining balance sheet strength and exibility Building a…
Rockhopper Key Metrics Reserves 2P 1mmboe Con5ngent Resources 2C 182mmboe Prospec5ve Resources P2 622mmboe Financial data Cash c.200 million* Debt 0 million Shares in issue 293 million Market cap at 65p 295…
Indica7ve Ac7vity Schedule 6
GREATER MEDITERANEAN OVERVIEW Sea Lion 7
Sea Lion pre FID work con7nues 70mm JV pre FID spend 2015 Target FEED award Q2 2015 Target sanc7on H1 2016 14 development wells Low cost phased FPSO solu7on 8 producers 5 water injectors 1.8bn to rst oil (at Nov…
North Falkland Basin 2010-2012 campaign results Discovered & appraised Sea Lion Signicant oil discovery Discovered the satellite elds Casper, Casper South, Beverley Total gross discovered resources c 400mmbbls recoverable…
2010-11 Rockhopper Operated Campaign 10 wells 400mmbbls rec. oil Zero environmental 2 DSTs Opened a new hydrocarbon province 1.8 Tcf gas incidents 2x 3D vessels 11
Subsurface Data and Analysis Unique knowledge of Sea Lion sub surface Appraisal Campaign Overview Loca5on Exploration well 8 km north of 14/10-2, penetrating northern SL30 14/10-3 fan good reservoir section sealed from main…
Amended well design, post well 14/10-6 RKH amended well design cost & schedule improvement Ini5al Well Design Progressed Well Design 30 x 20 TOC to 30 x 20 TOC to seabed (ROV observed) seabed (ROV observed) 30 x 20 30 x 20…
2010-2012 Rockhopper opera7onal performance Ave spud to TD 7me post 14/10-6 : 13 days Total Metres drilled : 26,573m Total core cut : 455m Ave materials consumed / well : 865 tons Average well cost : c.30M 14
Sea Lion Depositional Setting - A reminder North-south trending Atlan7c failed rio lled primarily by Early Cretaceous to Ter7ary sediments Typical half graben structure with a large (5,000m) eastern bounding fault Sea Lion…
SEA LION FAN COMPLEX DEPOSITIONAL SCHEMATIC CHATHAM JAYNE E. ZEBEDEE ISOBEL DEEP Isobel Deep Jayne East Elaine North Elaine South Catriona Chatham Emily/Lydia SL30 SL20 / SL10 Casper Casper…
SEA LION FAN COMPLEX DEPOSITIONAL SCHEMATIC 18
Sea Lion fans and exploration targets North 14/10-3 14/10-4 14/10-9 14/15-4a Zebedee (proposed) South E1 E3 Beverley SL30 SL20 Casper South Casper B30 SL20 3D1 SL10 Kermit Full stack volume Jackie…
GREATER MEDITERANEAN OVERVIEW 2015 campaign 20
2015 campaign 4 wells Low to medium risk Exploration & High impact Appraisal 2015 Pmean Low cost 160mmbbls c. 6mm Net to RKH per well 21
Falklands GREATER M 2015 Explora7on OCVERVIEW EDITERANEAN ampaign Start Up Pictures from Premier Oil 22
PL004b Zebedee, RKH 24% WI Near eld low risk, high resource explora7on well, 3.4km from 14/15-4 7 stacked targets with varying GCoS of 9-52% Risking lowest for F2 Zebedee fan Net prospec7ve Pmean resource 68mmbbls (range…
PL04a Isobel Deep, RKH WI 24% High impact moderate risk (GCoS 20%) explora7on well with poten7al to open new Isobel / Elaine development area (32km from 14/15-4) First test of F3 fan system entering basin from the south-east…
PL04c Jayne East, RKH 24% WI Test proven reservoirs of Beverley and Casper South on the eastern ank of syncline Total of 5 reservoirs targeted in loca7on proximal to sediment source Excellent reservoir quality an7cipated in F2…
PL032 Chatham, RKH WI 40% Well will conrm presence or absence of non-equilibrium gas cap on western ank of Sea Lion 50% chance of gas cap being absent and oil lled, adding c.65mmbbls to Sea Lion resources Deeper Chatham…
Explora7on & Impact on Sea Lion Development Phases Phase 1a development concept is independent of outcome of 2015 explora7on programme Phase 1b has poten7al upside in PL032 in event that Chatham / gas cap well is successful…
Funding Update Cash at 31st December 2014 c.200 million (unaudited) NFB well cost es7mated at 50 million gross per well Total net cost to RKH for all four NFB wells c.25 million (aoer carries), c 6 million per well 48 million…
GREATER MEDITERANEAN OVERVIEW Summary 32
Summary Well placed for 2015 and beyond High impact 4 well campaign in the NFB 2 explora7on wells, 2 combined appraisal/explora7on Poten7al to double resources Total es7mated cost to RKH c.25 million, c. 6 million per…
Board of Directors DR. PIERRE JUNGELS, CBE - Chairman SAM MOODY - Chief Execu5ve Ocer PhD in Geophysics & Hydraulics from California Co-founder of Rockhopper Explora7on. Previously at Ins7tute of Technology. Previously worked at…