Laredo Petroleum Highlights Raised 1.1 billion in net proceeds from equity and notes issuances in March 20151 Liquidity of 950 million2 and no near-term debt maturities Hedged thoroughly:3 More than 95% of anticipated oil…
Concentrated Asset Portfolio Focused in Midland Basin 186,227 gross / 155,405 net acres1 Proven Hz development in four stacked Howard Mitchell zones (Upper, Middle & Lower Wolfcamp and Cline) Potential additional zones for Hz…
2015 Budget Estimated 2015 Hz Completions1 20 Drill & Complete Operated 375 MM 18 Gross Horizontal Completions by Quarter (Operated) Non-op 55 16 Facilities 35 14 LMS Infrastructure 25 12 Land & Seismic 10 Other 25 10 525…
Permian Production Growth Initial Delineation Accelerated Delineation Development Testing Multi-well Pad Development 50 45 40 35 30 MBOE/D 25 20 15 10 5 - 1Q-11 2Q-11 3Q-11 4Q-11 1Q-12 2Q-12 3Q-12 4Q-12…
2014 Reserve Conversion to 3-Stream 350 By Product 82 297 300 25% 47% 247 32 250 28% MMBOE 200 Oil NGL Natural Gas 150 By Type 100 50 43% 57% 0 Total Proved Natural Gas NGL Reserves Total Proved Reserves…
Concentrated Multi-Zone Horizontal Development 1 3,700 horizontal locations have been identified for development in the initial four zones 50% of acreage is ready for multi-zone development in initial four zones with potential in…
Identified Path for Growth1 4,000 3,500 3,000 MMBOE (3-Stream) 2,500 2,300 2,000 1,500 1,000 500 297 0 Total Additional Additional Total Proved De-risked Potential Resource Reserves 1 Resource Resource 3…
Concentration of Resources Drives Efficiencies Not to scale Represents 5,000 ft Laredo is focused on developing the entire resource and maximizing operational efficiency by drilling stacked laterals on multi-well pads and…
Resource Characterization Earth Model Process Seismic inversion and INPUTS Layer-Based modeling petrophysical modeling Reservoir properties model Seismic horizons Upper Wolfcamp Formation tops Petrophysical data Seismic…
Successful Canyon Horizontal Test Laredos first Canyon test well completed in 4Q-14: 30-day average IP of 1,151 BOE/D Based on extensive data, including 3D seismic, single-zone tests and petrophysical logs, we believe the Canyon…
Production Corridors Enhance Long-Term Value Oil Gathering Station Oil Takeaway Pipeline Oil Gathering Line Gas Lift Compression Facility Gas Gathering Line Each production corridor Water Recycling Facility will support…
Laredo Midstream Services Introduction Laredo has built its wholly-owned gathering, transportation and marketing subsidiary, Laredo Midstream Services (LMS) Water Distribution/Recycle: Ensures water availability for simultaneous…
Medallion Pipeline COLORADO CITY HUB Medallion is a 65,000 BO/D pipeline (expandable to 130,000 BO/D) in which Laredo owns a 49% interest MARTIN HOWARD MITCHELL Laredo is an anchor shipper with initial committed volumes of…
Preserving Financial Flexibility 950 million of liquidity1 1,200 1,000 Borrowing Base No near-term maturities 800 MM 600 Net debt1/EBITDA2 ratio of 2.1 400 200 Interest savings of 30 million annually - from balance…
Oil Hedges Open Positions As of December 31, 2014 (1) 2015 2016 2017 Total (2) OIL Puts: Hedged volume (Bbls) 456,000 - - 456,000 Weighted average price (/Bbl) 75.00 - - 75.00 Swaps: Hedged volume (Bbls) 672,000 1,573,800 -…
Natural Gas Hedges Open Positions As of December 31, 2014 (1) 2015 2016 2017 Total (2) NATURAL GAS Collars: Hedged volume (MMBtu) 28,600,000 18,666,000 - 47,266,000 Weighted average floor price (/MMBtu) 3.00 3.00 - 3.00 Weighted…
Laredo Petroleum Highlights Raised 1.1 billion in net proceeds from equity and notes issuances in March 20151 Liquidity of 950 million2 and no near-term debt maturities Hedged thoroughly:3 More than 95% of anticipated oil…
Appendix
Significant Data Inventory Garden City Data Inventory 1 3,700 of whole cores in objective Howard Mitchell section 14 whole cores 715 SWC samples 56 single-zone tests from objective section (Spraberry to Ellenberger) 8,000…
PDP Reserves 5-Year Decline 140,000 120,000 100,000 Annual PDP (MBOE)1 80,000 60,000 40,000 20,000 - YE 2014 YE 2015 YE 2016 YE 2017 YE 2018 YE 2019 Year 1 Year 2 Year 3 Year 4 Year 5 12% PDP Reserve 9% PDP…
Sales Price Diversification1 Firm transportation out of the Permian Cushing 16,000 BO/D committed to Longhorn, increasing annually to 22,000 BOPD in Wichita Falls three years Colorado City BridgeTex 10,000 BOPD committed on…
Credit Agreement Financial Covenants Current Ratio Current assets to current liabilities ratio must be greater than 1.0 Credit facility availability is added to current assets for purposes of the calculation Excludes any current…
Sample Horizontal 2-Stream to 3-Stream Conversion Laredo presents 3-stream reserves and production based on gas plant economics that reflect the actual volumes recovered from the tailgate of the plant and adjust for system losses and…
Two-stream to Three-stream Conversions 1Q-14 2Q-14 3Q-14 4Q-14 FY-14 Production (2-Stream) BOE/D 27,041 28,653 32,970 39,722 32,134 Production % oil 58% 58% 59% 60% 59% Production (3-Stream) BOE/D 32,358 33,829 38,798 46,379…
Adjusted EBITDA Reconciliation ( thousands, unaudited) 2013 2014 Net income 118,000 265,573 Plus: Interest expense 100,327 121,173 Depletion, depreciation and amortization 234,571 246,474 Impairment expense -- 3,904 Write-off of…