  1. JP MORGANS PHILIPPINES 1X1 CONFERENCE 2015 – Energy Development Corp. – slide 1
    EDC COMPANY PRESENTATION J.P. MORGANS PHILIPPINES 1X1 CONFERENCE 2015 FEBRUARY 2015, MAKATI SHANGRI-LA HOTEL, MANILA
  2. JP MORGANS PHILIPPINES 1X1 CONFERENCE 2015 – Energy Development Corp. – slide 2
  3. JP MORGANS PHILIPPINES 1X1 CONFERENCE 2015 – Energy Development Corp. – slide 3
  4. JP MORGANS PHILIPPINES 1X1 CONFERENCE 2015 – Energy Development Corp. – slide 4
    KEY EVENTS AFFECTING THE PHILIPPINE ENERGY SECTOR SECONDARY OFFER PRICE CAP OF PHP 6.245/KWH WHEN THE 168-HOUR Secondary WESM AVERAGE WESM PRICE EXCEEDS PHP9.000/KWH Price Cap FIT-ALL Provisional FIT TARIFF FOR SELECTED…
  5. JP MORGANS PHILIPPINES 1X1 CONFERENCE 2015 – Energy Development Corp. – slide 5
    DEPARTMENT OF ENERGY FORECASTS ELECTRICITY SHORTAGE BY SUMMER OF 2015 DOE PROPOSED SEVERAL PLANS DOE SUPPLY-DEMAND FORECAST MAR-JUN 2015 TO ADDRESS SHORTAGE MW 10,500 INTERRUPTIBLE LOAD PROGRAM (ILP) 10,000 Mandatory operation of…
  6. JP MORGANS PHILIPPINES 1X1 CONFERENCE 2015 – Energy Development Corp. – slide 6
    Growth Projects EDC SUCCESSFULLY DELIVERED ON ITS 2014 STRATEGIC OBJECTIVES Price Price 9.00 9.00 8.50 5th Best Performing (PSEi) Bloomberg 8.50 8.00 2014 High : 8.47 2015 EPS (est.) 0.675 2 8.00 2014 Low : 5.12 2016 EPS (est.)…
  7. JP MORGANS PHILIPPINES 1X1 CONFERENCE 2015 – Energy Development Corp. – slide 7
    Growth Projects BURGOS WIND FARM WINS GLOBAL AWARD Asia-Pacific Renewables Deal of the Year Burgos the first wind farm project A landmark financing in the Philippines to transaction reach financial close being the first to be…
  8. JP MORGANS PHILIPPINES 1X1 CONFERENCE 2015 – Energy Development Corp. – slide 8
    Growth Projects EDCS GROWTH AGENDA 2015 STATUS 2015 STATUS 305 MW Palinpinon- 1 ACQUIRE 2 DEVELOP Tongonan acquired in 49.37 MW Nasulo 2009 commissioned in Sept. 130 MW Bacman Win key 2014 acquired in 2010 Install 180MW 6 MW NNGP…
  9. JP MORGANS PHILIPPINES 1X1 CONFERENCE 2015 – Energy Development Corp. – slide 9
    Growth Projects REPLICATING BACMANs RETROFIT PROGRAM INTO BOTH TONGONAN I AND PALINPINON I ... LIFE EXTENSION YIELDS ADDITIONAL BENEFITS Bacman Retrofit Program Efficiency Gains Electricity Production 10.00% Steam Consumption…
  10. JP MORGANS PHILIPPINES 1X1 CONFERENCE 2015 – Energy Development Corp. – slide 10
    Growth Projects LOCAL GEOTHERMAL PROJECTS WILL BE THE MAIN SOURCE OF GROWTH IN THE MEDIUM TERM 2 4 1 FRONTIER AREAS Beyond 2 (WIND) PROJECT CAPACITY 2014 2015 2016 2017 2018 1 Bayog I (Burgos I) 1 Nasulo* 49 MW X 2 Pagali (Burgos…
  11. JP MORGANS PHILIPPINES 1X1 CONFERENCE 2015 – Energy Development Corp. – slide 11
    Growth Projects EDC SEIZED THE OPPORTUNITY AND NOW HOLDS STAKES IN UP TO 5 CONCESSIONS AND 19 APPLICATIONS LATIN AMERICA INDONESIA Company Granted Sites* Applications (Entry into LatAm) Peru Chile Peru Chile GRAHO NYABU GEOTHERMAL…
  12. JP MORGANS PHILIPPINES 1X1 CONFERENCE 2015 – Energy Development Corp. – slide 12
    RETROFITTING OF COOLING TOWERS TO BE IMPLEMENTED IN 3 PHASES ON PRIORITY 1 AND 2 COOLING TOWERS PHASE 1 PHASE 2 PHASE 3 TRIAGE * THE SITUATION PROCURE & INSTALL DESIGN & IMPLEMENT A HURRICANE GRADE CTs 300 KPH SOLUTION AVAILABLE IN…
  13. JP MORGANS PHILIPPINES 1X1 CONFERENCE 2015 – Energy Development Corp. – slide 13
    ENGINEERING SOLUTIONS WILL PROGRESSIVELY BE IMPLEMENTED TO TYPHOON PROOF OUR COOLING TOWERS PHILIPPINE WIND PRIORITY Location of OEM Cell x Fan Stack of Units Dia. Cells 2 ZONE MAP 1 Malitbog 3 SPX Marley 8 x 28 24 Mahanagdong 3…
  14. JP MORGANS PHILIPPINES 1X1 CONFERENCE 2015 – Energy Development Corp. – slide 14
    68 HURRICANE TOWER SETS ON ORDER TO RETROFIT EXISTING FLEET OF COOLING TOWERS SPX Marley Reflex RTM Fan Cylinder Fan stack is the nozzle through which the fan blade draws air through the cooling tower. The RTM (Resin Transfer Moulding )…
  15. JP MORGANS PHILIPPINES 1X1 CONFERENCE 2015 – Energy Development Corp. – slide 15
    END OF PRESENTATION www.energy.com.ph