Dramatic Year-Over-Year Increases 3Q12 as compared to 3Q11 117% Increase in Production (1) 9,545 Boe/d 527% Increase in Adj. Net Income (2) 14.6 million (0.37/sh) 148% Increase in EBITDAX (2) 39.6 million (1.00/sh) 86%…
Strong Organic Growth Inventory 250 MMBoe of resource potential(1) 9 primary opportunities in various stages of development and evaluation Wattenberg Wattenberg Niobrara B Arkansas Cotton Valley Wattenberg Niobrara C 5-acre spacing…
2013 Capex Plan(1) Wattenberg Activity Doubles Wattenberg Field: 324 million 2013 Capex: 394 million Niobrara B (4,000): 56 wells Niobrara B (9,000): 2 wells Niobrara B (40-acre test): 6 wells Niobrara C: 4 wells Codell: 4 wells…
Wattenberg Niobrara a Premier Oil Resource Play 55% Basin IRRs Futures Strip as of 12/4/2012 55% 54% 60% 53% 46% 50% 43% 39% 39% 36% 36% 34% 40% 33% 33% 30% 26% 30% 23% 23% 20% 19%…
Focused on Continual Improvement BCEI Reported Average IP30 Rates Technical improvements 510 500 Increased frac stages from 16 stages to 18 stages Increases reservoir wellbore communication 490 480 Controlled flowback 470 Limits sand…
Wattenberg Expanding Resource Recovery Niobrara C Bench Horizontal C Bench present on all Wattenberg acreage Expected economics similar to Niobrara B 4,000 ft. laterals BCEI completed its first C Bench well in December 2012…
Wattenberg Productive Acreage Breakdown Recent BCEI & Offset Niobrara A 30,800 Acres Operator Activity 2013E Capex Plan Industry tests during 2012 None Development starting in 2013 Niobrara B 30,800 Acres BCEI 38 horizontal…
Wattenberg Hz Niobrara B Bench Economics EUR 312,000 Boe; 65% crude oil(1) Initial 30-day Rate 469 Boe/d Cost per Well 4.2 MM NPV-10 at 80/BO 4.1 MM NPV-10 at 100/BO 6.1 MM Risked Locations 321(2) net 4,000 ft B Bench BTAX…
Mid-Continent Operations (Arkansas) Provides free cash flow; reallocated to Wattenberg Niobrara ERA SYSTEM SERIES GROUP FORMATION CENOZOIC EOCENE Claiborne PALEOCENE Wilcox Primary Target: Cotton Valley: 4,000 7,000 feet TERTIARY…
Dorcheat-Macedonia Economics EUR 152,000 Boe(1) Peak 30-day Rate 103 Boe/d % Oil & Liquids 70% Cost per Well 1.8MM NPV-10 at 80/BO 1.9 MM NPV-10 at 100/BO 2.8 MM Risked Locations 111(2) BTAX IRR % at /BO WTI(3) 125% 100% 75%…
Cotton Valley Lenticular Oil Sands Pin-Point Fracture Technology Focused completion technology Improved recovery of OOIP Highly repeatable Dorcheat Unit 37 25-30 sand/shale sequences Each zone individually pressured Potential…
Hedge Positions and Strategy Approximately 2.2 MMboe hedged in 2013 and 1.5 MMboe hedged in 2014 Current volumes hedged in 2013 represent approximately 40% of estimated production(1) Comfortable hedging 50% of next twelve months…
Expanding the Runway True crude oil / liquids producer in Wattenberg Niobrara Rapidly growing production Large inventory of high value, drill ready locations with upside potential Dorcheat-Macedonia provides cash flows to…
Corporate Information Company Headquarters Investor Relations 410 17th Street, Suite 1400 James Masters Investor Relations Manager Denver, Colorado 80202 (720) 440-6121 (720) 440-6100 Main jmastersbonanzacrk.com (720) 305-0804…
Appendix 24
Experienced Management Team Founder of predecessor companies Mike Starzer Prior: Executive and Engineering roles at Unocal and Berry Petroleum President & CEO B.S. in Petroleum Engineering, Colorado School of Mines; M.S. in…
Experienced Management Team Joined in 2011 bringing expertise in corporate law, administration, M&A, federal Chris Humber securities laws and stock exchange rules SVP & General Counsel Prior: Kendall, Koenig and Oelsner; Hogan &…
Wattenberg Horizontal Niobrara Economics(1) (Boe/d) 500 Expected Type Curve(2) 312,000 Boe EUR 400 65% crude oil; 35% rich gas 356,000 Boe EUR 300 57% crude oil; 19% NGLs; 24% dry gas 200 Field Development 85.6% WI / 69.1% NRI…
DJ Basin Midstream Infrastructure Capacity Crude Pipelines and Rail Projects Operator Origination Termination Hub Timing (Bbl/d) White Cliffs Pipeline SemGroup 70,000 Platteville, CO Cushing, OK Existing White Cliffs Expansion SemGroup…
Easing High Line Pressures in Wattenberg BCEI Considerations High line pressures caused by constrained gas processing capacity Legacy vertical wells impacted more than newer horizontal wells 60% of BCEI production comes from…
North Park Basin Niobrara(1) EUR 211,000 Boe Initial 30-day Rate 304 Boe/d % Oil 90% Cost per Well 5.1 MM NPV-10 at 80/BO 2.1 MM NPV-10 at 100/BO 3.9 MM 2014-2015 development opportunity EVALUATING No natural gas takeaway…
Dorcheat-Macedonia Field(1) (Boe/d) 120 Type Curve(2) Recompletions opening additional Cotton Valley oil pay zones up hole 152,000 Boe EUR 100 Initial 30-day rate: 67 Boe/d Peak 30-day rate: 103 Boe/d 80 Include subsequent…
Mid-Continent Gas Processing Facilities General Overview Approximately 150 miles of gathering lines Nevada Processes minor quantities of third party natural gas Facilities interconnect into the CenterPoint Energy pipeline system…
Reconciliation to Adjusted Net Income This release contains the non-GAAP financial measures adjusted net income and adjusted net income per diluted share, which exclude (1) unrealized gain or loss on commodity derivatives, (2) non-cash…
Reconciliation to EBITDAX We define EBITDAX as net income, plus (1) exploration expense, (2) depletion, depreciation and amortization expense, (3) stock-based compensation expense, (4) interest expense, (5) unrealized loss (gain) on…
Reconciliation to Discontinued Operations Three Months Ended Nine Months Ended September 30, September 30, 3Q 2012 Sales Volumes 2012 2011 2012 2011 Continuing Operations 9,402 Boe/d NET REVENUES Oil and gas sales 58,328 25,915…