Dramatic Year-Over-Year Increases 2Q13 compared to 2Q12 Corporate 55% Increase in Production (1) 13,492 Boe/d 46% Increase in Adjusted EBITDAX (2) 53.9 million 2Q13 compared to 2Q12 Rocky Mtns 105% Increase in Rocky Mtn…
Oil Weighted Production and Reserves Production by Commodity (MBoe/d)(1) Revenue by Commodity (MM)(1) 11 9 1.4 4% 16 5% 15% Crude Oil 7% Crude Oil 1.1 Mid-Con Dry Gas Mid-Con Dry Gas 12% 6.1 65% 0.8 Rockies Wet Gas Rockies Wet…
Strong Organic Growth Inventory 350 MMBoe of resource potential(1) 17 years of Wattenberg inventory (1,500 locations) at current drilling pace Wattenberg Wattenberg Niobrara B Arkansas Cotton Valley North Park Niobrara C Arkansas…
Capital Expenditures Focused on Wattenberg Wattenberg Field (87 operated wells) 2013 Capex(1): 460-475MM Niobrara B (4,000): 56 wells Niobrara B (9,000): 2 wells Niobrara B (40-acre test): 6 wells Niobrara C: 4 wells Codell: 4…
Wattenberg Field BCEI in Wattenberg Field since 1999 Located in Extension Area 60% crude oil with associated liquids-rich natural gas Better economics than Gas Window Prospective for Codell and all benches of the…
Wattenberg Niobrara & Codell Oil Focused Wells Ranch 40-acre and 80-acre pads testing Niobrara A, B, C and Codell Extended reach laterals Development & Testing Program LEGEND Vert…
BCEI Niobrara B Bench Well Performance 12
Wattenberg Hz Niobrara B Target Type Well EUR 313,000 Boe; 62% crude oil(1) Initial 30-day Rate 458 Boe/d Cost per Well 4.2 MM NPV-10 at 90/BO 4.2 MM Payout 1.5 years ROR Sensitivity to Oil Price(2) (1) EUR based on internal…
Wattenberg Expanding Resource Recovery Codell Codell prospective on 15,000 net acres Codell 1 % Oil Codell 2 % Oil IP30 370 81% 607 65% IP60 360 76% 467 63% IP90 335 73% - Niobrara C Bench Present on all Wattenberg acreage C…
Wattenberg Hz First Production & Catalysts 30 Non-Operated Gross Non-Operated Net Operated Gross Operated Net 25 Wells Completed 20 15 10 5 0 1Q12 2Q12 3Q12 4Q12 1Q13 2Q13 3Q13 4Q13 Actual Plan Catalyst Well…
Drilling Super-Section Test in 4th Quarter Testing Future Development Concepts 15 downspaced and stacked laterals Spacing configuration testing Pad 1: Stacked 80-acre Niobrara B Bench and Codell wells with offset Niobrara C Bench…
Mid-Continent Operations (Arkansas) Provides free cash flow; allocated to Wattenberg ERA SYSTEM SERIES GROUP FORMATION CENOZOIC EOCENE Claiborne PALEOCENE Wilcox Cotton Valley: 6,500 8,800 feet TERTIARY CRETACEOUS GULFIAN Midway…
Dorcheat-Macedonia Economics Type Well Economics 10-acre 5-acre EUR(1) 148,000 Boe 118,000 Boe % Oil & Liquids 65% 65% Cost per Well 1.8MM 1.8MM NPV-10 1.8MM 1.3MM Payout 1.6 years 1.8 years Risked Locations 120 gross(2) 213…
Cotton Valley Lenticular Oil Sands Pin-Point Fracture Technology Focused completion technology Improved recovery of OOIP Highly repeatable Dorcheat Unit 37 25-30 sand/shale sequences Each zone individually pressured Potential…
Financial Overview 21
Oil Weighted Production Result in High Margins Unit Cash Operating Costs (/Boe) Unit Revenue & Cash Margins (/Boe) 25 80 4.34 70 3.49 4.35 70.70 68.93 20 66.72 3.43 65.70 67.70 60 3.90 50 15 8.63 9.12 7.93 7.76 40 6.75 10…
Current Hedge Positions 7,300 Bbl/d hedged at a minimum price of 88.63/Bbl in 2013 6,800 Bbl/d hedged at a minimum price of 87.12/Bbl in 2014(1) 1,500 Bbl/d hedged at a minimum price of 80.00/Bbl in 2015(1) Less than 2% gas…
Financial Summary Simplicity & Transparency = Successful Outcomes Balanced approach to capital allocation Achieve best-in-class growth via an expanding Wattenberg development program Fund oily growth with oily cash flow and prudent…
Expanding the Runway Total Resource Potential of 350 MMBoe Maintain peer leading production growth rates Accelerate development with increasing activity levels Ability to fund acceleration while maintaining a strong balance…
Corporate Information Company Headquarters Investor Relations 410 17th Street, Suite 1400 James Masters Investor Relations Manager Denver, Colorado 80202 (720) 440-6121 (720) 440-6100 Main jmastersbonanzacrk.com (720) 305-0804…
BCEI Acreage Correlation to Wells Ranch Niobrara A Bench Thinner and resistivity less developed A Niobrara B Bench Similar thickness and resistivity A Niobrara C Bench Slightly thinner lower chalk bench; similar resistivity…
DJ Basin Midstream Infrastructure Capacity Crude Pipelines and Rail Projects Operator Origination Termination Hub Timing (Bbl/d) White Cliffs Pipeline SemGroup 70,000 Platteville, CO Cushing, OK Existing White Cliffs Expansion SemGroup…
Easing High Line Pressures in Wattenberg BCEI Considerations High line pressures caused by constrained gas processing capacity Legacy vertical wells impacted more than newer horizontal wells 86% of BCEI production comes from…
North Park Basin Niobrara(1) EUR(2) 211,000 Boe Initial 30-day Rate 304 Boe/d % Oil 90% Cost per Well 5.1 MM NPV-10 at 80/BO 2.1 MM NPV-10 at 100/BO 3.9 MM 2014-2015 development opportunity No natural gas takeaway capacity…
Dorcheat-Macedonia Type Curve(1)(2) 140 120 Recompletions opening additional Cotton Valley oil pay zones up hole 100 80 Boe/d 60 40 20 0 0 12 24 36 48 60 Months 10-acre 5-acre (1) The type curve shows the…
Reconciliation to Adjusted EBITDAX We define adjusted EBITDAX as net income, plus (1) exploration expense, (2) depreciation, depletion and amortization expense, (3) stock-based compensation expense, (4) interest expense, (5) unrealized…