Dramatic Year-Over-Year Increases 3Q13 compared to 3Q12 Corporate 88% Increase in Production (1) 17,656 Boe/d 119% Increase in Adjusted EBITDAX (2) 86.7 million 3Q13 compared to 3Q12 Rocky Mtns 135% Increase in Rocky Mtn…
Oil Weighted Production and Reserves Production by Commodity (MBoe/d)(1) Revenue by Commodity (MM)(1) 9 11 4% 1.4 15% 16 5% Crude Oil 7% Crude Oil 1.1 Mid-Con Dry Gas Mid-Con Dry Gas 12% 6.1 65% 0.8 Rockies Wet Gas Rockies Wet…
Strong Organic Growth Inventory 350 MMBoe of resource potential(1) 17 years of Wattenberg inventory (1,500 locations) at current drilling pace Wattenberg Wattenberg Niobrara B Arkansas Cotton Valley North Park Niobrara C Arkansas…
Capital Expenditures Focused on Wattenberg Wattenberg Field (87 operated wells) 2013 Capex(1): 460-475MM Niobrara B (4,000): 56 wells Niobrara B (9,000): 2 wells Niobrara B (40-acre test): 6 wells Niobrara C: 4 wells 80% 20%…
Wattenberg Field BCEI in Wattenberg Field since 1999 Located in Extension Area 60% crude oil with associated liquids-rich natural gas Prospective for Codell and all benches of the Niobrara Contiguous acreage position…
Horizontal Niobrara/Codell Oil Focused Wells Ranch 40-acre and 80-acre pads testing Niobrara A, B, C and Codell Extended reach laterals Development & Testing Program LEGEND Vert…
BCEI Niobrara B Bench Well Performance 12
Wattenberg Hz Niobrara B Target Type Well EUR 313,000 Boe; 62% crude oil(1) Initial 30-day Rate 458 Boe/d Cost per Well 4.2 MM NPV-10 at 90/BO 4.2 MM Payout 1.5 years ROR Sensitivity to Oil Price(2) (1) EUR based on internal…
Wattenberg Expanding Resource Recovery Codell Codell prospective on 15,000 net acres Three wells currently producing: 539 Boe/d (71% crude) Avg. IP30 Niobrara C Bench Present on all BCEI Wattenberg acreage Five wells currently…
Drilling Super-Section Test in 4th Quarter Testing Future Development Concepts 15 downspaced and stacked 4,000 laterals Spacing configuration testing Pad 1: Stacked 80-acre Niobrara B Bench and Codell wells with offset Niobrara C…
Mid-Continent Operations (Arkansas) Provides free cash flow; allocated to Wattenberg ERA SYSTEM SERIES GROUP FORMATION CENOZOIC EOCENE Claiborne PALEOCENE Wilcox Cotton Valley: 6,500 8,800 feet TERTIARY CRETACEOUS GULFIAN Midway…
Dorcheat-Macedonia Economics Type Well Economics 10-acre 5-acre EUR(1) 148,000 Boe 118,000 Boe % Oil & Liquids 65% 65% Cost per Well 1.8MM 1.8MM NPV-10 1.8MM 1.3MM Payout 1.6 years 1.8 years Risked Locations 120 gross(2) 213…
Cotton Valley Lenticular Oil Sands Pin-Point Fracture Technology Focused completion technology Improved recovery of OOIP Highly repeatable Dorcheat Unit 37 25-30 sand/shale sequences Each zone individually pressured Potential…
Financial Overview 20
Oil Weighted Production Result in High Margins Unit Cash Operating Costs (/Boe) Unit Revenue & Cash Margins (/Boe) 25 80 77.54 4.34 3.49 4.35 70.70 68.83 20 67.43 66.93 60 4.98 3.90 15 8.63 9.12 7.93 40 6.87 6.75 10 57.74…
Current Hedge Positions 7,400 Bbl/d hedged at a minimum price of 88.98/Bbl in 2013 7,500 Bbl/d hedged at a minimum price of 88.27/Bbl in 2014(1) 1,500 Bbl/d hedged at a minimum price of 80.00/Bbl in 2015(1) Less than 2% gas…
Financial Summary Simplicity & Transparency = Successful Outcomes Balanced approach to capital allocation Achieve best-in-class growth via an expanding Wattenberg development program Fund oily growth with oily cash flow and prudent…
Expanding the Runway Total Resource Potential of 350 MMBoe Maintain peer leading production growth rates Accelerate development with increasing activity levels Ability to fund acceleration while maintaining a strong balance…
Corporate Information Company Headquarters Investor Relations 410 17th Street, Suite 1400 James Masters Investor Relations Manager Denver, Colorado 80202 (720) 440-6121 (720) 440-6100 Main jmastersbonanzacrk.com (720) 305-0804…
BCEI Acreage Correlation to Wells Ranch Niobrara A Bench Thinner and resistivity less developed A Niobrara B Bench Similar thickness and resistivity A Niobrara C Bench Slightly thinner lower chalk bench; similar resistivity…
DJ Basin Midstream Infrastructure Capacity Crude Pipelines and Rail Projects Operator Origination Termination Hub Timing (Bbl/d) White Cliffs Pipeline SemGroup 75,000 Platteville, CO Cushing, OK Existing White Cliffs Expansion SemGroup…
Easing High Line Pressures in Wattenberg BCEI Considerations High line pressures caused by constrained gas processing capacity Legacy vertical wells impacted more than newer horizontal wells 94% of BCEI production in Q3 2013 came…
Dorcheat-Macedonia Type Curve(1)(2) 140 120 Recompletions opening additional Cotton Valley oil pay zones up hole 100 80 Boe/d 60 40 20 0 0 12 24 36 48 60 Months 10-acre 5-acre (1) The type curve shows the…
Reconciliation to Adjusted EBITDAX We define adjusted EBITDAX as net income, plus (1) exploration expense, (2) depreciation, depletion and amortization expense, (3) impairment of oil and gas properties, (4) stock-based compensation…