Granite-Boulder Strategic Rationale Granite Oil Corp. Optimize Return Alberta Bakken Play Free Cash Flow-generating, low-decline conventional oil pool 100% land and infrastructure control on large oil asset Established gas injection…
Summary of Transaction Announced April 7, 2015; Plan of Arrangement mailing mid-April; Shareholder vote mid-May 2015 Each DTX shareholder will receive 0.5 share of Boulder Energy Ltd. and 0.33 share of Granite Oil Corp. per DTX…
Granite Oil Corp. Market Facts TSX Symbol To be determined Common Shares Outstanding Basic (MM) 30.2 Fully Diluted (MM) 30.4 Insider Holdings Basic (%) 7.9 Fully Diluted (%) 8.8 Financial Highlights Market Capitalization…
History of DTX Assets BOE/D AND CASH FLOW PER SHARE (CFPS) GROWTH 14000 0.60 12000 0.50 10000 0.40 Total BOE/d Production 8000 CFPS () 0.30 6000 0.20 4000 0.10 2000 0 - Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3…
Keys to a Strong, Sustainable Dividend Company KEY REQUIREMENTS GRANITE OIL HIGHLIGHTS DETAILED SLIDES Strong Capital Organic, low costs, established land and 11, 22, 26 Efficiencies infrastructure Large oil asset with proven…
The Asset
Alberta Bakken Development Timeline EOR PILOT Test Secondary Recovery with gas injection EXPLORATION Design Infrastructure for MAXIMIZE RETURNS Alberta Bakken Discovery: Full-Scale Deployment Maximize Oil Recovery Reagan 1-3…
Alberta Bakken Total Lands 350,000 net Bakken acreage Core Production 4,050 BOE/d (Q4 2014), 100% Working Interest 87% Oil and NGLs West Development Delineation success west of the Core in 2014 increases inventory and…
Infrastructure 100% Ownership & Control TransCanada Meter Station 100%-Owned Pipeline Infrastructure 100%-Owned Oil Battery 8,000 bbl/d 20,000 bbl storage 100%-Owned Gas Plant Granite Land Horizontal Well…
Bakken Pool Development and Drilling Inventory PHASE 1 EOR 8 Wells / Section PHASE 2 EOR PHASE 3 EOR 48 Wells 8 Wells / Section 8 Wells / Section 16 Wells 32 Wells WEST BAKKEN DEVELOPMENT 4 Wells / Section 66 Wells G…
Gas Injection Enhanced Oil Recovery
Maximizing Recovery and Capital Efficiency Proven results from gas injection EOR scheme: Observed improvement in production decline profile in new and existing wells Produced gas is re-injected into the reservoir to maintain…
Results Mitigating Long-term Pool Declines LEGEND Gas Injection Well Water Injection Well Wells Included in Decline Analysis in Study Area Wells Drilled and Completed New 2H14 / Q1 in 2H14 / Q1 2015 2015 Production Excluded…
Results Mitigating Initial Well Declines Comparison of Well Declines With and Without EOR Support 1000 EOR SUPPORT FROM INITIAL PRODUCION 100 Oil Production (Bbl/d) NO EOR SUPPORT Wells Outside EOR Show 10 Typical…
The Process C5+ Hydrocarbons to Compressor Sales Gas Plant Dry Gas to Compressor Compressed Gas Separator Re-injected Produced Oil + Gas Oil to Sales EOR Basics Injected gas in the top of the reservoir increases/maintains…
Optimizing Drilling Miscible Gas Injected into the Top of the Reservoir Increases Pressure and Oil Mobility Limestone Cap Deeper Infill Production Wells Optimize Reservoir Drainage G R A N I T E O I L C O R P. 19
Injection on Structural Highs ALBERTA BAKKEN TOP STRUCTURE -1250 m Planned 2015 Depth Infill Gas Injectors -1300 m Gas Injection on Structural Highs Supports Pressure Drive for Deeper Producers G R A N I T E O I L C…
EOR Area Phase 1 Development - Ten Year Drilling and Injection Plan POOL DEVELOPMENT 48 Well PLAN - YEAR 2025 Inventory Optimize EOR efficiency in the Core: on 200 m Down Spacing Re-inject 100% of produced gas from the Bakken pool…
Long-Term Organic Gas Supply and Injection Facilities BOW ISLAND GAS POOL ISOPACH Three secure, organic gas sources provide long-life EOR support: Produced gas from the Bakken pool 100%-owned, existing non-Bakken gas production…
Well Economics TYPE WELL DEFINITION Bakken Type Well 300 Well Cost: 2.8 MM EUR: 240 Mbbl 250 Capital Efficiency: 15,000 per 200 daily flowing bbl Bbl/day Year 1: 190 bbl/d average 150 Well F+D: 11.67 / bbl 100 Royalty: Freehold…
2015 Budget Initial Production Level 3,900 BOE/d Oil & NGLs 3500 Gas 400 Reserves MMBOE (Sproule P&P) December 2014 17.97 Guidance 2H15 CAPEX (MM) 20 2H15 Production 4000 2016 CAPEX (MM) 32 2016 Production 4500 G R A N I…
West Bakken 2015 Planned Delineation Drilling 2015 Planned Delineation Wells 2014 Pool Extension G R A N I T E O I L C O R P. 28
Granite Oil Corp.s Team MANAGEMENT TEAM Michael Kabanuk President and Chief Executive Officer Mr. Kabanuk is a Professional Engineer with 23 years of engineering and management experience in the oil and natural gas industry. As a…
Granite Oil Corp.s Team BOARD OF DIRECTORS Brendan Carrigy Chair Kevin Andrus Martin Cheyne Michael Kabanuk Henry Hamm Dennis Nerland Bradley Porter G R A N I T E O I L C O R P. 32
APPENDIX
Testing EOR Demonstrating Sustainable Results 1000 EOR Support after 18 Months of Production EOR Successfully Unsupported Supporting Decline Production 100 Oil Production (Bbl/d) 100/06-23-003-17W4/00 4000 Commence…
EOR Recovery - Preliminary Petrel Modeling Conservative EOR Development Model Modeled Oil Recovery Factor - EOR Core Area Shows Potential for 2xs Higher 18.0 Recovery than 16.0 Primary Production Alone 14.0 Recovery Factor…